ASSEMBLY LINE OPTIMIZATION USING LINE BALANCING APPROACH
TO REDUCE TAKT TIME AND LEAD TIME IN ELECTRICAL COMPANY Page 88 of 101
Ivander Arisito Sudarnoto REFERENCES
[1] W. J. Hopp and M. L. Spearman, Factory Physics: Foundation of Manufacturing Management Second Edition, New York: McGraw-Hill, 2001.
[2] M. Baudin, Lean Assembly: The Nuts and Bolts of Making Assembly Operations Flow, New York: Productivity Press, 2002.
[3] C. A. Ortiz, Kaizen Assembly: Designing, Constructing and Managing a Lean Assembly Line, New York: Taylor and Francis Group, 2006.
[4] A. Scholl, Balancing and Sequencing of Assembly Lines, Heidelberg: Physica - Verlag, 1999.
[5] W. J. Hopp and M. Spearman, Factory Physics (3rd Edition), USA: Waveland Press, Inc, 2011.
[6] Ş. Şeker and M. Özgürler, "MIXED MODEL ASSEMBLY LINE BALANCING AND ASSEMBLY," in 15th International Research/Expert Conference, Prague, 2011.
[7] D. L. Bricker and S.-H. Juang, "A Mathematical Programming Model of the,"
Department of Industrial Engineering The University of Iowa, Iowa, 1993.
[8] C. Becker and A. Scholl, "A Survey on Problems and Methods in Generalized Assembly," European Journal of Operational Research, p. 696, 2006.
[9] C. Merengo, F. Nava and A. Pozzetti, "Balancing and Sequencing Manual
Mixed-model Assembly Lines," International Journal of Production Research 37 (12), pp. 2835-2860, 1999.
[10] N. Kumar and D. Mahto, "Assembly Line Balancing: A Review of Developments and Trends in Approach to Industrial Application," Global Journal of Researches in Engineering Industrial Engineering, 2013.
[11] N. Kriengkorakot and N. Pianthong, "The Assembly Line Balancing Problem,"
KKU Engineering Journal, pp. 133-140, 2007.
[12] M. Salveson, "The Assembly Line Balancing Problem," Journal of Industrial Engineering, 1955.
[13] S. Ghosh and R. J. Gagnon, "A Comprehensive Literature Review and Analysis of the Design, Balancing and Scheduling of Assembly Systems," International Journal of Production Research, Vol. 27, No.4, pp. 637-670, 1989.
[14] A. Scholl and C. Becker, "State-of-the-art Exact and Heuristic Solution,"
European Journal of Operational Research, pp. 666-693, 2006.
[15] U. Özcan, H. Çerçioğlu, H. Gökçen and B. Toklu, " Balancing and sequencing of parallel mixed-model assembly lines," International Journal of Production Research, pp. 5089-5113, 2010.
[16] E. Falkenauer, "Line Balancing in the Real World," in International Conference on Product Lifecycle Management, Brussels, 2006.
[17] K. Ağpak and H. Gökçen, "Assembly line balancing: Two resource constrained
ASSEMBLY LINE OPTIMIZATION USING LINE BALANCING APPROACH
TO REDUCE TAKT TIME AND LEAD TIME IN ELECTRICAL COMPANY Page 89 of 101
Ivander Arisito Sudarnoto cases," International Journal of Production Economics 96, pp. 129-140, 2005.
[18] E. Henry, "Analisa Peningkatan Kapasitas Produksi Pada Line Assembling Transmisi PT. X dengan Metode Line Balancing," Depok, 2011.
[19] E. Ubani, "Application of Assembly Line Balancing Heuristics to Designing Product Layout in Motor Manufacturing," Interdisciplinary Journal of Cntemporary Research in Business, vol. 3, 2012.
[20] K. Arora, Production and Operation Management, Firewall Media, 2004.
[21] W. Charles Glassey, Theory and Practice of Time Study, London: Cox & Wyman, 1996.
[22] I. Z. Sutalaksana, R. Anggawisata and J. H. Tjakraatmadja, Teknik Tata Cara Kerja, Bangdung: ITB, 1979.
[23] M. M. Rahman, F. Nur and S. Talapatra, "An Integrated Framework of Applying Line Balancing in Apparel Manufacturing Organization: A Case Study.," Journal of Mechanical Engineering, 2014.
[24] J. P. Womack, D. T. Jones and D. Roos, The Machine That Changed The World, Massachusetts: Massachusetts Institute of Technology, 1990.
[25] J. P. Womack and D. T. Jones, Lean Thinking: Banish Waste and Create Wealth in Your Corporation, London: Simon & Schuster UK Ltd., 2003.
[26] P. Y. Tambe, "Balancing Mixed-Model Assembly Line to Reduce Work Overload in a Multi-Level Production System," Louisiana State University and
Agricultural and Mechanical College, Louisiana, 2006.
[27] J. Banks, J. S. Carson II, B. L. Nelson and D. M. Nicol, Discrete-Event System Simulation (5th Ed.), New Jersey: Pearson Education Inc., 2010.
[28] S. Bangsow, Manufacturing Simulation with Plant Simulation and Simtalk:
Usage and Programming with Examples and Solution, Heidelberg: Springer, 2010.
[29] G. N, Production and Operations Management: Seventh Edition, Duxbury Press., 1996.
[30] A. P. Yanuarifiani and E. K. Budiardjo, Effectiveness Evaluation Model Design of Customer Relationship Management Using Balanced Scorecard: Case Study XYZ, 2014.
[31] S. Mohan, "Performance Management System | SlideShare.net," 17 March 2009.
[Online]. Available: https://www.slideshare.net/surabhi123/presentation-pms.
[32] S. Luo, H. Chai and L. Liu, Based on The Balanced Scorecard: Performance Evaluation of Konwledge Team, 2012.
[33] J. Ryan, C. Lewis, C. Fretwell, B. Doster and S. Daily, A Balanced Scorecard Approach to Perioperative Process Management: A Case Study Perspective, 2012.
[34] R. S. Kaplan and D. P. Norton, The Balanced Scorecard: Translating Strategy Into Action, Boston, Massachusetts: Harvard Business School Press, 1996.
[35] R. S. Kaplan and D. P. Norton, Strategy Maps: Converting Intangible Assets into Tangible Outcomes, Boston, Massachusetts: Harvard Business School Publishing Corporation, 2004.
ASSEMBLY LINE OPTIMIZATION USING LINE BALANCING APPROACH
TO REDUCE TAKT TIME AND LEAD TIME IN ELECTRICAL COMPANY Page 90 of 101
Ivander Arisito Sudarnoto [36] D. Parmenter, Key Performance Indicators: Developing, Implementing, and
Using Winning KPIs, Hoboken, New Jersey: John Wiley & Sons, Inc., 2010.
[37] R. Bacal, A Critical Look at Performance Management Systems: Why Don't They Work?, McGraw-Hill, 1998.
[38] G. Cokins, Performance management : finding the missing pieces (to close the intelligence gap), Hoboken, New Jersey: John WIley & Sons, Inc., 2004.
[39] G. S. Becker, Human Capital: A Theoritical and Empirical Analysis with Special Reference to Education, Third ed., The University of Chicago Press, 1993.
[40] C. Goldin, "Human Capital," Handbook of Cliometrics, 2004.
[41] "Human Capital White Paper," 2007.
[42] D. Ulrich, B. E. Becker and M. A. Huselid, The HR Scorecard: Linking People, Strategy, and Performance, 1 ed., Boston: Harvard Business School Press, 2001.
[43] G. V. Kondalkar, Organization Development, Daryaganj, New Delhi: New Age International (P) Ltd., Publishers, 2009.
[44] R. Beckhard, Organization Development: Strategies and Models, MA: Addison- Wesley, 1969.