TEST#1 TKA 1603 TEKNIK PEMBORAN II SENIN, 12 & 13 APRIL 2023

WAKTU: 06.30 – 08.25 WIB WELL KICK CONTROL (90 poin):

Data drillstring:

DP  OD = 5” (19,5 lb/ft)  0 – 6000 ft

HWDP  OD = 5” (49,3 lb/ft)  6000 – 7800 ft DC  OD = 8”  Ca = 0,0087 bbl/ft  7800 – 8000 ft Hole geometri:

Casing depth (ID 13 ½ “)  3750 ft Hole diameter = 12 ¼ “

Diketahui:

SIDPP : 750 psi

SICP : 840 psi

Pit volume gain : 45 bbl

Tb : 190 F (Z=0,93)

Tcasinghole : 106 F (Z=0,96)

Ts : 80 F (Z = 0,98)

Leak of test with 10 ppg mud : 2000 psi

Ploss sistem : 500 psi

Pmax casing : 1200 psi

Pump output : 0,2 bbl/stroke

Density acc. : 0.75 ppg/hr

Kill rate : 5 bpm

Original mud : 9 ppg

PV : 8 cp

YP : 8 lb/100ft2

Gunakan metoda concurrent dengan menggunakan 1 mud transisi, untuk mencari :

1. Tipe fluida kick, tekanan formasi, densitas mud baru, dan densitas mud transisi.

2. Waktu yang diperlukan untuk mereplace kick dengan mud lama

3. Waktu yang diperlukan untuk mereplace seluruh mud dengan mud baru, dan total stroke (tanpa waktu pembuatan lumpur)

4. Gambarkan CP vs total stroke yang digunakan 5. Apakah casing pecah/ failure?

6. Apakah underground blowout akan terjadi?

Referensi