INSTITUTE OF AERONAUTICAL ENGINEERING
(AUTONOMOUS) Code No: BCC006
M.Tech II Semester Regular Examinations, August 2017
FLEXIBLE MANUFACTURING SYSTEMS
(CAD/CAM)
Time: 3 hours Max. Marks: 70
Answer ONE Question from each Unit All Questions Carry Equal Marks
All parts of the question must be answered in one place only UNIT-I
1. (a)
Explain Innovations that have advanced the manufacturing industries.
[7M]
(b) What are the principle objectives of FMS. [7M]
2. (a) Explain the area of applications of FMS in an industry. [7M]
(b) Explain types of FMS layouts. [7M]
UNIT-II
3. (a) Explain forward scheduling approaches with infinite capacity loading. [7M]
(b) Explain system modeling issues. [7M]
4. (a)
Write the principle of system modeling.
[7M]
(b)
Write about centralized versus distributed.
[7M]UNIT-III 5. (a) Write about issues related to stochastic models.
[7M]
(b) Explain about basic concepts of markov chains. [7M]
6. (a) Briefly explain about monte carlo method.
[7M]
(b)
Write about the continuous and discrete mathematical modeling methods.
[7M]UNIT-IV 7. (a) Explain the manufacturing system analysis.
[7M]
(b) Discuss about that information too complex to be useful and effective? [7M]
8. (a) Explain about the tools, equipment or resources capabilities.
[7M]
(b) Explain the application performance analysis. [7M]
UNIT-V
9. (a)
What does an unscheduled stop cost you? What is so problematic with “Break
Down Maintenance”?
[7M](b)
Why should your dealership perform the Preventive Maintenance on your
[7M]MODEL QUESTION PAPER - I
vehicle?
10. (a)
What benefits can you realize with a dealer Preventive Maintenance Program?
[7M]
(b)
Why does that make it eligible for federal aid funding.
[7M]INSTITUTE OF AERONAUTICAL ENGINEERING
(AUTONOMOUS) Code No: BCC006
M.Tech II Semester Regular Examinations, August 2017
FLEXIBLE MANUFACTURING SYSTEMS
(CAD/CAM)
Time: 3 hours Max. Marks: 70
Answer ONE Question from each Unit All Questions Carry Equal Marks
All parts of the question must be answered in one place only UNIT-I
1. (a)
What are various advantages and disadvantages of FMS implementation?
[7M]
(b) Explain concepts of FMS?. [7M]
2. (a) Explain the AIMS of FMS. [7M]
(b)
Explains the Innovations that have advanced the manufacturing industries?
[7M]UNIT-II
3. (a) Differentiate between real time vs discrete event control. [7M]
(b) Differentiate the forward vs backward scheduling approaches [7M]
4. (a)
Explain system modelling issues.
[7M]
(b) Differentiate between conflicts, concurrency and synchronization. [7M]
UNIT-III 5. (a) Write about issues related to deterministic.
[7M]
(b) Write about issues related to stochastic models. [7M]
6. (a) Explain about basic concepts of markov chains.
[7M]
(b) Briefly explain about monte carlo method. [7M]
UNIT-IV 7. (a) Explain the application performance analysis.
[7M]
(b) Explain the transient analysis of manufacturing. [7M]
8. (a) Explain the manufacturing system analysis.
[7M]
(b) Discuss about that information too complex to be useful and effective? [7M]
UNIT-V
9. (a)
What does an unscheduled stop cost you? What is so problematic with “Break
Down Maintenance”?
[7M](b)
Why should your dealership perform the Preventive Maintenance on your
vehicle?
[7M]10. (a)
What benefits can you realize with a dealer Preventive Maintenance
[7M]MODEL QUESTION PAPER - II
Program?
(b)