Extension of tender, re-offer, correction or change in schedule will not be published in Gazette; it will be published at www.dbatu.ac.in only. The right to reject any or all tenders without assigning any reason is reserved by the University. Name of work: Repair and Reconstruction work of Estate storage room at DBATU, Wages Estimated Cost on tender Rupees.

Dr. BABASAHEB AMBEDKAR TECHNOLOGIGAL UNIVERSITY, LONERE

INVITATION FOR TENDERS

DETAILED TENDER NOTICE

  • SHORT LISTING OF CONTRACTORS FOR FINANCIAL BIDDING PROCESS
  • OPENING OF THE FINANCIAL BIDS
  • TENDER SCHEDULE (KEY DATES)
    • COVER NO. I (TECHNICAL BID DOCUMENTS)
    • OFF LINE SUBMISSION
    • COVER II (FINANCIAL BID)
    • OPENING OF TENDERS
  • EARNEST MONEY
  • SECURITY DEPOSIT
    • ADDITIONAL PERFORMANCE SECURITY DEPOSIT
  • TESTING OF MATERIALS
  • BID EVALUATION PROCESS 1 Proposal Evaluation Process
    • Technical Proposal Evaluation
    • Presentation and live demo of the solution
    • Clarifications during evaluation
    • Notification of Award and signing of contract
    • Lack of Competition
    • Delay in Completion of Work

The following tender opening procedure will be adopted on the date specified in the tender schedule. 2% (the deposit submitted by the bidder is converted into a security deposit) and concludes a contract for the performance of the contractor.

Bid Formats

STATEMENT SHOWING WORK DONE IN ALL CLASSES OF CIVIL ENGINEERING

CONTRACTION WORK DURING LAST THREE YEARS

DETAILS OF WORKS OF SIMILAR TYPE AND MAGNITUDE CARRIED OUT BY CONTRACTOR

DETAILS OF LIST OF WORKS IN HAND AND WORKS TENDERED

UNDERTAKING

34;"xɨÉÖxÉÉ''

ºÉiªÉ|ÉÊiÉYÉÉ ±ÉäJÉ (Affidavit)

EÆòjÉÉ]õnùÉ®úÉSÉÒ ºÉ½þÒ

All works proposed to be executed by contract shall be notified in a form of invitation to tender pasted on a board hung up in the office of the Registrar DBATU,

If the e-tender is submitted by a company, it must be digitally signed. We fail to (1) comply with the provision to keep the offer open for the above period or (2) sign and complete the contract documents as required by the registrar and post the security as specified in clause (d) of the memorandum contained in paragraph 1 above within the period stipulated in point (I) of the attached general contract conditions.

CONDITIONS OF CONTRACT

The decision of the Secretary in this regard shall be final and binding on the Contractor. In the event of such delay in the supply of materials, the University shall grant such extension of time for completion of the works. The contractor accepts the secretary's decision to extend the deadline as final.

Contractor

The safe working load must be established by appropriate means on each hoisting machine and on each chain, ring, hook, shackle, swivel and pulley block used in lifting, lowering or as a means of suspension. h) Each lifting machine and all equipment referred to in the previous regulation must be clearly marked with the safe working load. i). Working on Sundays It is not allowed to work on Sundays and public holidays without the written permission of the Registrar or his authorized representative. All works to be carried out under the contractor shall be carried out under the direction and subject to the approval in all respects of the Registrar, who has the preliminary right to determine at what point or points and in what manner they are to be commenced, and continued from time to time.

Store of

If there is no such authorization, the contractor cannot request payment measurements. The contractor shall pay a fair and reasonable wage to the workers he employs under the contract he has entered into. The contractor is also responsible for precautionary liability arising from his violation of the provisions of the law.

ADDITIONAL

CONDITIONS/INSTRUCTIONS TO TENDERERS WHILE TENDERING FOR

THE WORKS

COMPETENCY OF TENDER

Work will only be awarded to that contractor deemed to be a substantially responsive bidder, capable of completing the class of work to be completed. Before making the final award, one or all of the tenderers may be required to demonstrate that they have the necessary experience, facilities, skills and financial resources to carry out the work satisfactorily and also on time.

PAYMENTS

If situation arises, the work will be stopped as safe and withdrawn in terms of clause 15 for which no compensation will be allowed.

ERASER

ACCEPTANCE

PRECAUTIONS TO BE TAKEN BY THE CONTRACTOR TO PREVENT ACCIDENT

  • CONTRACTOR TO INFORM HIMSELF FULLY
  • ERROR, OMISSIONS AND DISCREPANCIES
  • WORKING METHODS AND PROGRESS SCHEDULES
  • TREASURE TROVE
  • COLLECTION OF MATERIAL :-
  • AGENT AND WORK ORDER BOOKS:-
  • INITIAL MEASUREMENTS FOR RECORD:-
  • HANDING OVER OF WORK:-
  • ASSISTANCE IN PROCURING PRIORITIES, PERMITS ETC:-

The contractor shall comply with such effect substitutions to the satisfaction of the Registrar. A work order book will be maintained on site and it will be the property of the University and the contractor must promptly sign and comply with instructions given in it by the Registrar or his superior officers. The record of such measurements on the University's side will be signed by the contractor and he will be entitled to have a true copy made at his expense.

SAMPLES AND TESTING OF MATERIALS:-

  • QUALITY CONTROL ON WORKS AND MATERIALS
  • CO-ORDINATION :-
  • TEMPORARY QUARTER
  • PAYMENTS
  • PATENTED DEVICES, MATERIALS AND PROCESSES
  • WATER SUPPLY
  • ELECTRICITY
  • AMENITIES
  • EXPLOSIVE:-
  • DAMAGE BY FLOODS OR ACCIDENTS:-
  • RELATION WITH PUBLIC AUTHORITIES:-
  • INDEMNITY:-
  • MEDICAL & SANITARY ARRANGEMENTS TO BE PROVIDED FOR LABOUR EMPLOYED IN THE CONSTRUCTION BY THE

The contractor must make his own arrangements for the machinery required for the work. The contractor shall be responsible for the quality of work in all construction work within the contract. The supply of electricity for the use of the University at the work site will be provided by the contractor.

MISCELLANEOUS

In addition to the above, all provisions of the relevant labor law relating to basic amenities to be provided to the laborer will apply which will be arranged by the contractor. Suitable separation barriers and enclosure, as indicated, shall be provided to separate separate materials brought by contractor and from different sources of supply. In case of high rates quoted by the contractor for a particular item, the payment for that item will be made at part rate based on C.S.R.

DEFINITIONS

In case of high rates quoted by the contractor for a particular item, payment for that item will be made by fractional rate based on C.S.R. rate initially; The full fee will only be released once all work has been satisfactorily completed. . l) "Accepting Authority" means the official competent to accept the contract. n) "Temporary Works" means all temporary works of any kind required in or in connection with the execution, completion or maintenance of the Works. o) "Emergency works" means any measure which, in the opinion of the registrar or his authorized representative, becomes necessary during the progress of the works to avoid any danger, accident or failure or which becomes necessary for the safety of the work or of persons. working, where the context requires, words importing only the singular to include the plural and vice versa. The title and marginal notes, if any, of the general conditions shall not be deemed to form part of them or be taken into account in the interpretation or construction of the contract.

LAY OUT OF WORK:-

  • SETTING OUT:- I) ROAD WORKS

The contractor will establish working benchmarks in the area shortly after taking possession of the site. In order to facilitate the setting out of the works, the center line of the highway or highway must be accurately determined by the contractor and approved by the Registrar. On construction reaching the formation level stage, the center line shall be re-laid out, the contractor shall, when approved by the Registrar, be accurately referenced in a manner satisfactory to the Registrar by marker pins set at the outer limits of the formation is.

STACKING AND STORAGE AND GUARDING OF MATERIALS:-

An up-to-date record of all measurements including approved adjustment, if any, shall be maintained by the contractor and also a copy furnished to the Registrar for his record. It must then be accurately referenced in a manner satisfactory to the Registrar, every 50 m intervals in plain and rolling terrain and 20 m intervals in terrain and in all curved points as indicated by the Registrar, with marker pins and chain age boards set or near the fence line, and a schedule of reference dimensions must be prepared and provided by the contractor to the Registrar. If any such damage is caused, the contractor will pay for the restoration of the property to its original condition, and any other consequential damage.

RESTRICTIONS BECAUSE OF LOCAL TRAFFIC

COMPLETION CERTIFICATE

ANCILLARY WORK

SPECIAL CONDITIONS

THE MODIFICATIONS/AMENDMENTS/ADDITIONSTO THE SPECIFIATION FOR ROAD WORKS

REJECTION OF MATERIALS NOT CONFROMING TO SPECIFICATIONS

HOT MIXED AND HOT LAID BITUMINOUS CONSTRUCTION

The Registrar and any person authorized by him shall at all times have access to the works and to all workshops and places (including the required documents) where the work is being prepared or from which the materials, articles of manufacture or machinery for the works and the contractor are obtained shall afford all facilities and all assistance in or in obtaining the right to such access. The Contractor shall arrange for the provision of a fully furnished and equipped field laboratory, which shall be manned by adequately qualified technical staff. This will be considered as incidental to the work and no separate payment will be made for the same.

SUPPLY OF COLOURED RECORED PHOTOGRAPHS AND ALBUMS

The laboratory should preferably be located next to the plant site and should be provided with facilities such as water supply, electrical supply, toilet block etc.

SUPPLY OF SAFETY JACKETS TO LABOURERS/SUPERVISORS ENGINEER

APPROVAL OF CONSTRUCTION MATERIALS AND CONSTRUCTION ACTIVITES

QUALITY CONTROL TEST :-

PIPES:- The contractor shall purchase R.C.C Pipes of required categories from MSSIDC/small industries and necessary documentation for purchase of pipes shall be produced to the Registrar during execution of the work. CONDITIONS REGARDING CONTRACT WORK INSURANCE The Contractor shall take out necessary policies/policies to provide adequate.

DIARY

DEFECT LIABILITY PERIOD (CLAUSE 20) – 24 MONTHS

The price adjustment for the increase or decrease in cost due to the work will be paid in accordance with the following formula:. Pm= Percentage of local material component (except cement, steel, bitumen and POL of work. D) Price adjustment for bitumen component – ​​Price adjustment for increase or decrease in cost of Bitumen purchased by the contractor shall be paid in accordance with the following formula. If required, weighing of bulk asphalt gases etc. brought by the contractor will be carried out by the contractor at his own expense.

SPECIAL SPECIFICATIONS FOR CONCRETE

Whenever possible, polybonding threads and polyphonic sleeves shall be used, after ensuring that these do not result in loss of chemical reaction bond with the concrete and subject to the approval of the Engineer-in-Charge. 8] DISCLOSURES IN CONCRETE : After completion of concreting the concrete surface, especially where there is reinforcement overload, shall be tested by light hammer or if possible by Schmidt hammer or Ultra pulse velocity method.

Schedule B

Providing unpaved rubble masonry of fall / granite / quartzite / gneiss stones in cement mortar 1:6 in foundation and plinth of interior walls / in plinth of exterior walls including manual pumping out of water, joints on non-exposed surfaces and watering etc. complete. Removing doors and windows with frames and stacking the materials as indicated with all pipes, lifts etc. roof covering including purlins, main trusses etc. including sorting usable and unusable materials, stacking as and where indicated in the compound. Supply and application of two coats of exterior weather resistant paint of approved manufacture and van.

DECLARATION OF CONTRACTOR

Referensi

Dokumen terkait

OFFICE OF THE REGISTRAR :: DIBRUGARH UNIVERSITY DIBRUGARH :: ASSAM PIN: 786 004 BID DOCUMENT FOR NAME OF THE WORK: Supply, installation and commissioning of Workstation at