FACULTY OF ENGINEERING

DEPARTMENT OF CIVIL ENGINEERING

SITE VISIT - REPORT

DATE: Monday, 17 JUNE 2019 TIME: 10:00am to 1:00 pm

VENUE: Bengulraih circle, Kengeri-Tavarekere Road ,Bangalore NAME OF THE COMPANY: Public Works Department, Bangalore STUDENTS OF: B.TECH & M.TECH Final Year Students

FACULTY MEMBERS: Prof Laxmi, Dr Sirisha, Prof Yogesh & Prof Adarsh Objective

The main objective of the site visit was to bridge the gap between the industry and academia and to meet the curriculum demand. The students of VII Semester BTech in Civil Engineering are studying the course CE735 – Bridge Engineering.

To provide practical knowledge to the students of the ongoing bridge construction work, the students were taken to the site. The ongoing bridge is a single span Reinforced Concrete deck slab bridge of span 10.42 mts. The estimated cost ofconstruction is Rs. 88 Lakhs. The bridge connects Ramohalli to Moligondanahalli via Kengeri-Tavarekere road in Bangalore South.

The session began with an introduction to the project by Mr Narayanagowda, Assistant Engineer, Public Works Department, Bangalore. He was very keen to

(2)

know what the students expected from this visit to make it more fruitful. He explained about the technical aspects of the project in brief and the safety measures to be taken at the site during the visit.

He explained about the basic components of a bridge like abutment, wing wall, deck slab, approach slab etc. During the visit, the construction of Abutments was in progress so the detailed and working drawing of the abutments was explained to the students. Students were also exposed to the process of reading and understanding the working drawings at the site. The students also had an opportunity to observe the reinforcement details of some elements of a bridge.

The concept of weep holes, pitching was explained in detail. The challenges faced during the construction work and the methods to overcome were also discussed.

The students also visited some of the minor bridges (culverts-Box type) on the way back and had a very good practical insights.

The visit ended with feedback, questionnaire and sharing the ideas of the site visit with the Assistant Engineer.

GALLERY

1. Picture showing the abutments under construction

(3)

2. Picture showing the Facbrication of Reinforcement fo the abutment

3. Picture showing the Engineer-in-charge explaining the components of Bridge in the drawing

(4)

4. Picture showing the Students and the Faculty at the site of construction.

5. Picture showing the image of the bridge drawing and the formwork in progress

The students of III Semester MTech –Structural Engineering were also taken along with the VII Semester BTech as it is related to the analysis and design of bridge structure, which is part of their curriculum too.

Referensi

Dokumen terkait

Laporan Hasil Pendampingan WPM Pada Kegiatan Site Visit Paket 04: Ipuh – Bantal Provinsi Bengkulu AWP-1, Western Indonesia National Roads Improvement Project ( WINRIP).. 13

From: Gnat < > Sent: Monday, 14 June 2021 2:35 pm To: Dominionroad.fasttrack Subject: Comments on Dominion Road - Natalie Roux de Buisson Categories: Copied to SharePoint

The visit was arranged for the government officers involved in establishment and operation of the two fisheries refugia sites in Thailand, namely Trat Site and Surat Thani Site, aimed

FISHERIES REFUGIA MANAGEMENT COMMITTEE MEETING – Bolinao Site El Pescador Resort Hotel June 9, 2021 Program of Activities 8:30 AM Registration 9:00 AM Preliminaries Project

Geraldine Klug DIARY ENTRIES FOR JULY AND BEYOND Date Event Time Venue Monday 21 July Committee meeting 7:00 pm Regent Park Sunday 27 July Leisurepark Distance SC 400/800

Thank you for having me Snappers.” DIARY ENTRIES FOR JUNE AND BEYOND Date Event Time Venue Saturday 6 June Stadium Masters 1500 Metre LC Distance Swim 1:00 pm start HBF

Invited Talk Department of Computer Science and Engineering Indian Institute of Technology Kanpur Date: August 19, 2016 Time: 3:30 pm to 5:00 pm Venue: KD 101 Task Scheduling

Visit to Pahang-Selangor Raw Water Transfer Project Site in Hulu Langat, Selangor TunneLLing and undeRgRound SPace TecHnicaL diViSion A technical visit to Pahang-Selangor Raw Water