Week 2 Lecture 6:
Working Stress Method (unit?
unit=14&lesson=15) Lecture 7: Limit State Method of Design as per IS456:2000 (unit?
unit=14&lesson=16) Lecture 8: Limit State Method of Design as per IRC 112:2011 (unit?
unit=14&lesson=17) Reference
Books (unit?
unit=14&lesson=18) Week 2: Lecture Material (unit?
unit=14&lesson=19)
Due on 2019-09-11, 23:59 IST.
1 point 1)
1 point 2)
Week 2 Assignment 2
The due date for submitting this assignment has passed.
As per our records you have not submitted this assignment.
(a) (b) (c) (d)
No, the answer is incorrect.
Score: 0
Accepted Answers:
(d)
Week 3 Week 4
Assignment Solution Live Session
Assignment 2 (assessment?
name=46) Feedback for Week 2 (unit?
unit=14&lesson=21)
1 point 3)
1 point 4)
1 point 5)
(c) (d)
No, the answer is incorrect.
Score: 0
Accepted Answers:
(b)
(a) (b) (c) (d)
No, the answer is incorrect.
Score: 0
Accepted Answers:
(d)
(a) (b) (c) (d)
No, the answer is incorrect.
Score: 0
Accepted Answers:
(b)
(a) (b)
1 point 6)
1 point 7)
1 point 8)
(c) (d)
No, the answer is incorrect.
Score: 0
Accepted Answers:
(d)
(a) (b) (c) (d)
No, the answer is incorrect.
Score: 0
Accepted Answers:
(c)
(a) (b) (c) (d)
No, the answer is incorrect.
Score: 0
Accepted Answers:
(a)
(a) (b)
1 point 9)
1 point 10)
(d)
No, the answer is incorrect.
Score: 0
Accepted Answers:
(a)
(a) (b) (c) (d)
No, the answer is incorrect.
Score: 0
Accepted Answers:
(c)
(a) (b) (c) (d)
No, the answer is incorrect.
Score: 0
Accepted Answers:
(b)