Analysis and Evaluation on the Risks of the Construction Project
Teks penuh
Dokumen terkait
Instrument used for this study is questionnaire which consists of three independent variable; Accident Intensity, Lost of Cost, Lost of Work time, and dependent
Analyze the influence of accident intensity, loss cost injury, and loss time injury toward project
For the construction project management is expected to make a preventive effort to minimize the intensity of accidents in the construction project, because the amount
Dewa ayu Apriana sari 2013, 05 13 12339 “The Analysis Of Foreman Performance on Quality Management Implementation In Yogyakarta Construction Project”,management
The results showed that the application of material procurement supply chain management characteristics had a positive and significant effect on the performance of
Table 1: Technical knowledge of a construction project manager Technical knowledge areas Required knowledge Knowledge of construction science Understanding structures Understanding
Risk factor Encode 10 Delaying in material supply Sub-CONT 1 11 Suppling low quality materials Sub-CONT 2 12 Poor or insufficient abilities Sub-CONT3 IV Consultant CONS 13