• Tidak ada hasil yang ditemukan

Analysis and Evaluation on the Risks of the Construction Project

N/A
N/A
Protected

Academic year: 2024

Membagikan "Analysis and Evaluation on the Risks of the Construction Project"

Copied!
10
0
0

Teks penuh

Something wrong

Referensi

Dokumen terkait

Instrument used for this study is questionnaire which consists of three independent variable; Accident Intensity, Lost of Cost, Lost of Work time, and dependent

Analyze the influence of accident intensity, loss cost injury, and loss time injury toward project

For the construction project management is expected to make a preventive effort to minimize the intensity of accidents in the construction project, because the amount

Dewa ayu Apriana sari 2013, 05 13 12339 “The Analysis Of Foreman Performance on Quality Management Implementation In Yogyakarta Construction Project”,management

The results showed that the application of material procurement supply chain management characteristics had a positive and significant effect on the performance of

Table 1: Technical knowledge of a construction project manager Technical knowledge areas Required knowledge Knowledge of construction science Understanding structures Understanding

Risk factor Encode 10 Delaying in material supply Sub-CONT 1 11 Suppling low quality materials Sub-CONT 2 12 Poor or insufficient abilities Sub-CONT3 IV Consultant CONS 13

Table 3.1 Table 3.2 Table 4.1 Table 4.2 Table 4.3 Table 4.4 Table 4.5 LIST OF TABLES Illustration of weighting calculation for each supervision area Illustration of the