ERWIN CAMACHO GASCON

PERSONAL DATA

Age: 25

Date of Birth: Dec 10, 1982

Gender: Male

Civil Status: Single

Height: 176 cm

Weight: 70 kg

Nationality: Filipino

Religion: Christianity - Catholic

EDUCATION

Highest Education Second Highest

Education Education Level: Prof'l License(Passed Board/Bar/Prof'l License

Exam) High School Diploma

Education Field: Engineering(Mechanical)

Course: Bachelor of Science in Mechanical Engineering High School Grad School/University: Pangasinan State University Asan Sur National High

School

Location: Urdaneta City, Pangasinan Asan Sur, Sison, Pangasinan

Date: Jun 1999 - Mar 2004 Jun 1995 - Mar 1999

LICENSES/CERTIFICATIONS License/Certification

Exam Taken License/

Certification No. Date 1. Licensure Examination For Mechanical

Engineers 0064860 Oct 2004

WORK EXPERIENCED

I have been working for 3.5 year(s).

Position: PIPING ENGINEER

Duration: Sep 21, 2006 - Sep 28, 2008(2 yrs)

Company: NESMA & PARTNERS CONTRACTING CO.LTD.

Company Industry: Oil / Gas / Petroleum

Location P.O. Box 1498, Al-Khobar 31952,Kingdom Of Saudi Arabia Department: ENGINEERING/CONSTRUCTION

1.

Job Description: • Reviewing and Stamping of Welding Procedure Specification (WPS), Post Weld Heat Treatment (PWHT), Non-Destructive Testing (NDT) Requirement and Painting System in Isometric Drawing as per Material Class, Service, Design Conditions and Insulation.

• Preparing Material Take-Off, Weld Mapping and Spooling of Piping Isometric Drawing.

• Responsible for raising Technical Query to the client/contractor based on Project Specifications and Standards.

• Daily updating of Piping Isometric Drawing.

(2)

• Preparing Material Take-Off and Purchase Requisition (P.R.) of Piping Materials.

• Preparing HydroTest Package and Test limits.

• Conducting Line checking and Punch listing.

• Preparing As-built Piping Isometric Drawing using AutoCADD.

• Preparing Red Line drawings.

• Providing Technical Support to site construction such as checking availability of piping material dispatches, pipe spool fabrication and erection planning and verifying working procedure.

• Mere knowledge in preparing Welding Procedure Specification (WPS) with the assistance of assign superior.

• Performing other works that been assign from time to time.

Position: SITE ENGINEER (MECHANICAL) Duration: Jan 27, 2005 - Sep 6, 2006(1.6 yrs) Company: TRIPLE ONE CONSTRUCTION,INC.

Company Industry: Construction / Building

Location Northern Cement Corporation (NCC) Plant Site ,LABAYUG,SISON, PANGASINAN

Department: CONSTRUCTION 2.

Job Description: • In-Charge in Mechanical works such as shop fabrication, installation and erection of static or rotating equipment.(Ducting, bins, hoppers, air slide, pendulum, chutes, compensator, pin and slide gates, cyclone, lever/pin support, flanges, bucket elevators, blowers, regulating flap, piping system, belt and pan conveyors, and coal crusher, compressor, rotary lock, tertiary and regulating flaps ).

• Works in Structural fabrication and erection.

• Ensure the proper implementation of plans in the site based on approved design.

• Check machine / equipment deflection during construction and installation; base bolts tension, correct leveling of base plates, grouting procedures and proper alignment of drives to follow manufacturer’s specifications.

• Implementing safety engineering practices and systematic housekeeping.