BAHAGIAN 5.0 : KOS SEWA LOJI DAN PERALATAN
UNIT PURATA JULAT PURATA JULAT PURATA JULAT PURATA JULAT
(RM) (RM) (RM) (RM) (RM) (RM) (RM) (RM)
1 Backhoe sejam 55.00 55.00 62.17 53.00 - 75.00 65.00 55.00 - 80.00 60.72 53.00 - 80.00
2 Dragline
RB 19 sejam 80.00 80.00 56.63 43.75 - 80.00 78.33 50.00 - 100.00 71.65 43.75 - 100.00
RB 22 sejam 90.00 90.00 75.42 55.00 - 112.50 100.00 80.00 - 120.00 88.47 55.00 - 120.00
RB 30 sejam 100.00 100.00 97.50 70.00 - 122.50 128.33 115.00 - 150.00 108.61 70.00 - 150.00
3 Excavator
Up to 0.5 m3 sejam 85.00 85.00 70.13 63.00 - 80.00 83.00 60.00 - 100.00 79.38 60.00 -100.00
KESELURUHAN
Item Keterangan Kerja
KAWASAN UTARA KAWASAN TENGAH KAWASAN TIMUR
Kawasan Utara - Perlis, Kedah, Pulau Pinang dan Perak
Kawasan Tengah - Wilayah Persekutuan Kuala Lumpur, Melaka, Negeri Sembilan, Selangor dan Johor
Kawasan Timur - Pahang, Terengganu dan Kelantan
Up to 0.5 m3 sejam 85.00 85.00 70.13 63.00 - 80.00 83.00 60.00 - 100.00 79.38 60.00 -100.00
0.5 m3to 1.0 m3 sejam 125.00 125.00 85.21 75.00 - 100.00 103.33 80.00 -140.00 104.51 75.00 - 140.00
Over 1.0 m3 sejam 175.00 175.00 105.33 82.00 - 150.00 133.33 80.00 - 180.00 137.89 80.00 - 180.00
4 Excavator houdralic operated
Up to 0.5 m3 sejam 85.00 85.00 89.08 70.00 - 122.50 91.67 80.00 - 100.00 88.58 70.00 -122.50
0.5 m3to 1.0 m3 sejam 125.00 125.00 102.92 88.00 - 125.00 110.00 90.00 - 140.00 112.64 88.00 -140.00
Over 1.0 m3 sejam 175.00 175.00 128.50 100.00 - 150.00 146.67 120.00 - 180.00 150.06 100.00 - 180.00
5 Face Showel
Model 920 sejam 85.00 85.00 75.00 60.00 - 100.00 100.00 100.00 86.67 60.00 - 100.00
Model 950 sejam 125.00 125.00 84.38 67.00 - 106.25 120.00 100.00 - 140.00 109.79 67.00 -140.00
Model 966 sejam 175.00 175.00 94.58 75.00 - 112.50 140.00 100.00 - 180.00 136.53 75.00 - 180.00
6 Back Pusher sejam 60.00 60.00 52.67 33.00 - 75.00 81.67 70.00 - 95.00 64.78 33.00 - 95.00
7 Vibrating Roller 15 tonne sejam 105.00 105.00 68.42 55.00 - 100.00 88.33 65.00 - 100.00 87.25 55.00 - 105.00
8 Compressor sejam 35.00 35.00 46.25 25.00 - 80.00 42.50 30.00 - 55.00 41.25 25.00 - 80.00
9 Bulldozer
Model D4 sejam 90.00 90.00 96.75 58.00 - 140.00 86.67 80.00 - 100.00 91.14 58.00 - 140.00
Model D6 sejam 110.00 110.00 109.58 70.00 - 150.00 94.00 80.00 - 120.00 104.53 70.00 - 150.00
Model D8 sejam 140.00 140.00 144.50 120.00 - 190.00 105.00 80.00 - 150.00 129.83 80.00-190.00
Kawasan Utara - Perlis, Kedah, Pulau Pinang dan Perak
Kawasan Tengah - Wilayah Persekutuan Kuala Lumpur, Melaka, Negeri Sembilan, Selangor dan Johor
Kawasan Timur - Pahang, Terengganu dan Kelantan
76
BAHAGIAN 5.0 : KOS SEWA LOJI DAN PERALATAN
UNIT PURATA JULAT PURATA JULAT PURATA JULAT PURATA JULAT
(RM) (RM) (RM) (RM) (RM) (RM) (RM) (RM)
KESELURUHAN
Item Keterangan Kerja
KAWASAN UTARA KAWASAN TENGAH KAWASAN TIMUR
Kawasan Utara - Perlis, Kedah, Pulau Pinang dan Perak
Kawasan Tengah - Wilayah Persekutuan Kuala Lumpur, Melaka, Negeri Sembilan, Selangor dan Johor
Kawasan Timur - Pahang, Terengganu dan Kelantan
10 Tractor sejam - - 60.00 37.00 - 100.00 60.00 60.00 60.00 37.00 - 100.00
11 Mobile Crane
3 tonne sejam 70.00 70.00 65.83 40.00 - 100.00 80.67 70.00 - 100.00 72.17 40.00 - 100.00
16 tonne sejam 80.00 80.00 83.30 56.00 - 122.50 80.00 80.00 81.10 56.00 - 122.50
25 tonne sejam 90.00 90.00 116.67 75.00 - 150.00 85.00 80.00 - 90.00 97.22 75.00 - 150.00
35tonne sejam 120.00 120.00 158.33 85.00 - 250.00 140.00 130.00 - 150.00 139.44 85.00 - 250.00
40 tonne sejam 150.00 150.00 210.00 115.00 -315.00 170.00 160.00 - 180.00 176.67 115.00 -315.00
12 Motor Grader sejam 180.00 180.00 118.54 80.00 -165.00 116.67 80.00 - 190.00 138.40 80.00 - 190.00
13 Dumper
Up to 0.5 m3 sejam 75.00 75.00 66.00 37.50 - 100.00 80.00 80.00 73.67 37.50 - 100.00
0.5 m3to 3.5 m3 sejam 80.00 80.00 91.25 70.00 - 120.00 105.00 90.00 - 120.00 92.08 70.00 - 120.00
14 Steel Roller
8 tonne sejam 100.00 100.00 88.50 70.00 - 112.50 80.00 60.00 - 100.00 89.50 60.00 - 112.50
12 tonne sejam 120.00 120.00 100.50 80.00 - 122.50 96.67 80.00 - 110.00 105.72 80.00 - 122.50
15 Low Loader sejam 380.00 380.00 223.75 150.00 - 375.00 223.33 120.00 - 400.00 275.69 120.00 - 400.00
16 Lorry
6 tonne sejam 60.00 60.00 67.68 60.00 - 85.00 56.67 50.00 - 60.00 61.45 50.00 - 85.00
8 tonne sejam 70.00 70.00 77.68 68.75 - 100.00 76.67 60.00 - 100.00 74.78 60.00 - 100.00
10 tonne sejam 80.00 80.00 93.39 68.75 - 125.00 110.00 80.00 - 150.00 94.46 68.75 - 150.00
17 Tipper without road tax
6 tonne sejam 40.00 40.00 53.75 30.00 - 72.50 51.67 40.00 - 60.00 48.47 30.00 - 72.50
10 tonne sejam 50.00 50.00 62.50 40.00 - 85.00 60.00 50.00 - 70.00 57.50 40.00 - 85.00
18 Tipper with road tax
6 tonne sejam 50.00 50.00 70.00 60.00 - 80.00 62.50 60.00 - 65.00 60.83 50.00 - 80.00
10 tonne sejam 70.00 70.00 84.00 70.00 - 100.00 85.00 70.00 - 100.00 79.67 70.00 - 100.00
77
BAHAGIAN 5.0 : KOS SEWA LOJI DAN PERALATAN
UNIT PURATA JULAT PURATA JULAT PURATA JULAT PURATA JULAT
(RM) (RM) (RM) (RM) (RM) (RM) (RM) (RM)
KESELURUHAN
Item Keterangan Kerja
KAWASAN UTARA KAWASAN TENGAH KAWASAN TIMUR
Kawasan Utara - Perlis, Kedah, Pulau Pinang dan Perak
Kawasan Tengah - Wilayah Persekutuan Kuala Lumpur, Melaka, Negeri Sembilan, Selangor dan Johor
Kawasan Timur - Pahang, Terengganu dan Kelantan
19 Concrete Mixer
Concrete Mixer 7/5 sejam 40.00 40.00 30.92 10.00 - 62.50 40.00 30.00 - 50.00 36.97 10.00 - 62.50
Concrete Mixer 10/7 sejam 60.00 60.00 36.75 15.00 - 80.00 70.00 40.00 - 100.00 55.58 15.00 - 100.00
Concrete Mixer 14/10 sejam 90.00 90.00 44.08 17.00 - 100.00 86.67 60.00 - 100.00 73.58 17.00 - 100.00
Concrete Mixer 21/14 sejam 120.00 120.00 62.75 19.00 - 120.00 100.00 80.00 - 120.00 94.25 19.00 - 120.00
20 Water Pump
3'' Diameter sejam 35.00 35.00 29.25 15.00 - 47.50 56.67 30.00 - 100.00 40.31 15.00 - 100.00
6'' Diameter sejam 40.00 40.00 42.08 25.00 - 60.00 66.67 40.00 - 100.00 49.58 25.00 - 100.00
6'' Diameter sejam 40.00 40.00 42.08 25.00 - 60.00 66.67 40.00 - 100.00 49.58 25.00 - 100.00
8" Diameter sejam 45.00 45.00 63.25 40.00 - 100.00 83.33 50.00 - 120.00 63.86 40.00 -120.00
21 Welding and cutting set complete 0.00
Oxy - acetylene sejam 40.00 40.00 59.60 25.00 - 110.00 35.00 35.00 44.87 25.00 - 110
Electric sejam 50.00 50.00 77.00 38.00 - 120.00 45.00 45.00 57.33 38.00 - 120.00
22 Drilling machine complete with all necessary equipment
sejam
200.00 200.00 143.13 100.00 - 200.00 310.00 250.00 - 380.00 217.71 100.00 -380.00
78