• Tidak ada hasil yang ditemukan

A CASE STUDY ON EGM DEVELOPMENT SDN BHD

N/A
N/A
Protected

Academic year: 2024

Membagikan "A CASE STUDY ON EGM DEVELOPMENT SDN BHD"

Copied!
5
0
0

Teks penuh

(1)

UNIVERSITI

T eknologi

M ara

UNIVERSITI TEKNOLOGI MARA

STRATEGIC BUSINESS DEVELOPMENT : A CASE STUDY ON

EGM DEVELOPMENT SDN BHD

EMMY MARINA MARZUKI GAJALIE SAZALIE MAZLAN MOHAMAT

Executive Master Of Business Administration

December 2013

(2)

DECLARATION

We declare that the work in this Applied Business Research was carried out in accordance with the regulations of Universiti Teknologi MARA. It is original and is the result of our own work, unless otherwise indicated or acknowledged as referenced work. This thesis has not been submitted to any other academic institution or non­

academic institution for any degree or qualification.

We, hereby, acknowledge that we have been supplied with the Academic Rules and Regulations for Post Graduate, Universiti Teknologi MARA, regulating the conduct of our study and research.

Emmy Marina Marzuki Student ID : 2011325431

Gajalie Sazalie

Student ID: 2011366195

Mazlan Mohamat

Student ID : 2011582851

Date : 26th December 2013

(3)

Table of Contents

Page

Declaration i

Acknowledgement ii

Letter of Transmittal iii

List of Table vi

List of Figures vi

Abstract vii

Chapter 1 Introduction

1.0 Introduction 1

1.1 Overview of the Study 1

1.2 EGM Development Sdn Bhd 2

1.3 Property Market in Kuching 3

1.4 Problem Statements 5

1.5 Research Objectives 6

1.6 Scope and Limitations 9

1.7 Significance of study 9

Chapter 2 Literature Review

2.0 Introduction 11

2.1 Strategic Management and Planning 11

2.2 The Process of Strategic Planning 12

2.3 SWOT Analyses and Porter 5 Forces

Application in Strategic Planning 14

2.4 Key Success Factor 15

Chapter 3 Research Methodology

3.0 Introduction 16

3.1 Primary Data 16

3.2 Secondary Data 17

3.3 Data Collection Methods & Tools 18

3.4 Data Analysis Tools 19

3.4.1. SWOT 19

3.4.2. IFE 20

3.4.3. EFE 20

3.4.4. SWOT Matrix 20

3.4.5. IE Matrix 21

3.4.6. SPACE Matrix 21

3.4.7. Grand Strategy Matrix 22

3.4.8. QSPM 22

iv

(4)

Abstract

This applied business research was EGM Development Sdn Bhd (EGM), a property development company. EGM is a real company with name being changed to protect the secrecy and sensitivity of information. Currently, EGM is developing 1,167 units of residential buildings on 2 plots of land.

The objective of this study is to propose strategic business development plan for EGM. This was done by conducting strategic analysis on the company itself, which covered the internal and external factors that affecting the company’s business and operations. For this purpose, various well known management tools, which are widely used in practice, were employed.

The results generated from the application of the management tools were generic and specific strategies. These strategies were then used to formulate short term and long term plans for the company. The outcomes from this study can be used by EGM management to develop more details action plans. It is also can be used as a basis for their growth strategy.

(5)

CHAPTER 1 INTRODUCTION

1. Introduction

This chapter looks at EGM Development Sdn Bhd, a real company (name has been changed to protect the secrecy and sensitivity of information) for the purpose of this Applied Business Research, and the property industry with emphasis on Kuching market. It also discusses the objectives and nature of this study.

1.1. Overview of the study

Property market is a competitive market and experiencing growth in the market. Housing developers by nature are aggressive entrepreneurs and some are from public listed companies which having ample resources. It is also a highly regulated industry where it is uncommon to find customers who are legally aware of their rights and will not hesitate to seek legal redress to settle disputes. In Kuching, the scenario is more challenging in the sense that there are informed buyers and can afford to wait before deciding to buy or otherwise.

EGM is one of the active housing developers in Kuching. Currently, the company is developing two plots of development area known as Taman KI and Taman K2. Both development plots have their own terms and conditions with stipulated time to complete. EGM had invested quite a substantial sum on development cost and need to recover this investment and at the same time fulfilling the terms and conditions of development agreements.

EGM is in the process of strategising its way forward. The company has partially completed Taman KI and yet to commence with Taman K2. The

1

Referensi

Dokumen terkait

team skill factor, and organization with the performance improvement (dependent variable). All the independent variables have significant one to one relationship with

Failures in supply chain management in the aerospace manufacturing company had a negative impact to the production line that could lead to total shut down of

This project will focus on maintenance aspects in palm oil production at Felda Kernel Product Sdn. Bhd located in Semambu, Kuantan, Pahang. Statistical analysis will be used

Realizing this situation, the company needs a proper Material Requirement Planning and inventory management system as a tool to assist the company to reduce their

This study will thoroughly focus on reducing time losses while at the same time reducing the lead time of sales order processing in company Micro Zass Sdn.. and

This case study indicates 50.90AI of the respondents agree TNB provided most ot their electricity needs and 59.3% disagree that other utility company in

ABSTRACT This study aimed to identify the relationship between job relevance, result demonstrability, system self-efficacy, perceived enjoyment, perception of external control,

LETTER OF SUBMISSION 29 October 2009 The Head of Program Bachelor of Business Administration Hons International Business Faculty of Business Management Universiti Teknologi MARA