BAHAGIAN : 2.0 - KOS KERJA-KERJA AM

SUB-BAHAGIAN : 2.2 - PERATUSAN KOS KERJA AM (GENERAL ITEMS) KEATAS JUMLAH HARGA KONTRAK

(DITOLAK JUMLAH KOS KERJA AM) Kawasan A - Perlis, Kedah, & P. Pinang Kawasan D - Johor

-MENGIKUT BUTIRAN TERPERINCI Kawasan B - Perak Kawasan E - Pahang

Kawasan C - WP.KL , Selangor, N. Sembilan & Melaka Kawasan F - Terengganu & Kelantan

BIL. KETERANGAN KERJA UNIT JULAT PURATA JULAT PURATA JULAT PURATA JULAT PURATA JULAT PURATA JULAT PURATA JULAT PURATA

(%) (%) (%) (%) (%) (%) (%) (%) (%) (%) (%) (%) (%) (%)

1 Performance Bond 0.37 - 0.69 0.30 - 0.74 0.18 - 0.79 0.44 - 0.65 0.20 - 0.75 0.49 - 0.90 0.18 - 0.75

1.07 2.00 1.67 0.79 1.35 2.66 2.66

2 Insurances

a Public Liability/Insurance Against Personal Injuries & 0.10 - 0.27 0.10 - 0.51 0.13 - 0.38 - - 0.13 - 0.55 0.17 - 0.39 0.10 - 0.42

Damage to Property. 0.46 1.1 0.83 1.09 0.73 1.09

b Insurance of Works 0.22 - 0.45 0.10 - 0.30 0.15 - 0.50 - - 0.15 - 0.5 0.11 - 0.32 0.10 - 0.41

0.93 0.50 1.08 1.09 0.53 1.09

c Allow for Insurance of Works, Workmen's Compensation 0.15 - 0.32 - - 0.25 - 1.13 0.54 - 0.77 0.80 - 1.37 - 0.97 0.15 - 0.91

and Public Liability 0.61 4.25 1.31 1.93 4.25

d Workmen's Compensation 0.19 - 0.44 0.10 - 0.26 0.02 - 0.38 - - 0.15 - 0.56 0.15 - 0.43 0.02 - 0.41

0.97 0.70 0.98 2.17 0.73 2.17

e Social Security Scheme (SOCSO) 0.10 - 0.37 - 0.10 0.09 - 0.22 - - 0.07 - 0.35 0.12 - 0.18 0.07 - 0.24

0.78 0.34 1.09 0.27 1.09

f Contractor's All Risk Insurance 0.28 - 0.54 - 0.20 0.22 - 0.36 - - - 0.20 - 0.37

0.78 0.46 0.78

g Design Guarantee 0.09 - 0.12 - - - 0.09 - 0.12

0.15 0.15

KAWASAN A KAWASAN B KAWASAN C KAWASAN D KAWASAN E KAWASAN F KESELURUHAN

(2)

BAHAGIAN : 2.0 - KOS KERJA-KERJA AM

SUB-BAHAGIAN : 2.2 - PERATUSAN KOS KERJA AM (GENERAL ITEMS) KEATAS JUMLAH HARGA KONTRAK Kawasan A - Perlis, Kedah, & P. Pinang Kawasan D - Johor

(DITOLAK JUMLAH KOS KERJA AM) Kawasan B - Perak Kawasan E - Pahang

-MENGIKUT BUTIRAN TERPERINCI Kawasan C - WP.KL , Selangor, N. Sembilan & Melaka Kawasan F - Terengganu & Kelantan

BIL. KETERANGAN KERJA UNIT JULAT PURATA JULAT PURATA JULAT PURATA JULAT PURATA JULAT PURATA JULAT PURATA JULAT PURATA

(%) (%) (%) (%) (%) (%) (%) (%) (%) (%) (%) (%) (%) (%)

3 Offices, Signboards & Services

a Provide site office for the S,O's and his staff and maintain 0.18 - 0.31 0.10 - 0.40 0.75 - 0.94 - - - 0.73 - - 0.10 - 0.60

as specified and removal upon completion. 0.56 0.70 1.24 1.24

b Allow for the establishment and removal of site office 0.24 - 1.02 0.20 - 0.26 - - - 0.20 - 0.64

for the Superintending Officer and the staff. 1.86 0.40 1.86

c Provide S.O.'s site office, air condition, telephone 0.36 0.36 0.10 - 0.48 0.28 - 0.83 - - 1.49 - 3.02 0.58 - 1.18 0.10 - 1.17

facilities, lighting, furniture and toilet facilities including 0.70 1.96 5.41 1.76 5.41

maintenance throughout the contract period and extension of time and subsequent removal.

d Allow for erection of site office for the S.O.'s and staff 0.43 - 0.47 - - 0.34 - 0.83 - - - 1.03 0.34 - 0.78

including all fittings (electrical, telephone, plumbing, etc.) 0.50 1.68 1.68

as specified; clear acces and its removal and clearance from the Site on completion.

e Allow for the provision of all temporary services to the - - - - 0.48 - 0.49 - - - 0.48 - 0.49

S.O.'s site office (water, power, telephone and sanitataion) 0.50 0.5

from approved connecting points on the site and removal of the same on completion of the works, including all fees and charges. (Throughout contract period)

f Allow for provision of all fittings, electrical, telephone, - - - - 0.10 - 0.26 - - - 0.10 - 0.26

plumbing office equipment, sanitary and water supply, 0.44 0.44

1 No. Camera with Date/month including zoom lens (100mm - 300mm & f 45 - 3.6) and maintenance of site office for the S.O.'s and his staff.

KAWASAN A KAWASAN B KAWASAN C KAWASAN D KAWASAN E KAWASAN F KESELURUHAN

(3)

BAHAGIAN : 2.0 - KOS KERJA-KERJA AM

SUB-BAHAGIAN : 2.2 - PERATUSAN KOS KERJA AM (GENERAL ITEMS) KEATAS JUMLAH HARGA KONTRAK Kawasan A - Perlis, Kedah, & P. Pinang Kawasan D - Johor

(DITOLAK JUMLAH KOS KERJA AM) Kawasan B - Perak Kawasan E - Pahang

-MENGIKUT BUTIRAN TERPERINCI Kawasan C - WP.KL , Selangor, N. Sembilan & Melaka Kawasan F - Terengganu & Kelantan

BIL. KETERANGAN KERJA UNIT JULAT PURATA JULAT PURATA JULAT PURATA JULAT PURATA JULAT PURATA JULAT PURATA JULAT PURATA

(%) (%) (%) (%) (%) (%) (%) (%) (%) (%) (%) (%) (%) (%)

3 Offices, Signboards & Services ( cont'd )

g Allow for services, attendance and maintenance including - - 0.10 - 0.15 0.13 - 0.39 - - - - 0.05 - 0.20 0.05 - 0.25

water,telephone and electricity fo the office of the 0.20 0.89 0.33 0.89

S.O.'s Representative.

h Allow for furniture for S.O.'s including its removal and - - - - 0.06 - 0.10 - - - 0.06 - 0.10

clearance from the Site on completion. 0.16 0.16

I Provide and maintain Contractor's site office and all 0.23 - 0.54 0.06 - 0.26 0.13 - 0.60 0.02 - 0.21 0.72 - 0.96 0.13 - 0.48 0.02 - 0.51

workmen's accomodation including all necessary 0.86 0.47 1.42 0.44 1.6 1.16 1.42

services required by the contractor and removal upon completion.

j Provide and maintain one (1) no. of project signboard 0.01 - 0.10 0.06 - 0.08 0.01 - 0.17 0.02 - 0.07 0.11 - 0.30 0.09 - 0.18 0.01 - 0.15

and removal upon completion. 0.32 0.10 0.67 0.13 0.54 0.42 0.67

k Water Supply 0.11 - 0.16 - 0.17 0.08 - 0.12 - - - 0.22 - - 0.08 - 0.17

KAWASAN A KAWASAN B KAWASAN C KAWASAN D KAWASAN E KAWASAN F KESELURUHAN

(4)

BAHAGIAN : 2.0 - KOS KERJA-KERJA AM

SUB-BAHAGIAN : 2.2 - PERATUSAN KOS KERJA AM (GENERAL ITEMS) KEATAS JUMLAH HARGA KONTRAK Kawasan A - Perlis, Kedah, & P. Pinang Kawasan D - Johor

(DITOLAK JUMLAH KOS KERJA AM) Kawasan B - Perak Kawasan E - Pahang

-MENGIKUT BUTIRAN TERPERINCI Kawasan C - WP.KL , Selangor, N. Sembilan & Melaka Kawasan F - Terengganu & Kelantan

BIL. KETERANGAN KERJA UNIT JULAT PURATA JULAT PURATA JULAT PURATA JULAT PURATA JULAT PURATA JULAT PURATA JULAT PURATA

(%) (%) (%) (%) (%) (%) (%) (%) (%) (%) (%) (%) (%) (%)

3 Offices, Signboards & Services ( cont'd )

l Power Supply - - - 0.30 0.08 - 0.12 - - - 0.57 - - 0.08 - 0.33

0.15 0.57

m Sanitation 0.02 - 0.08 - 0.06 - 0.09 0.01 - 0.07 - 0.07 - - 0.01 - 0.07

0.12 0.17 0.17

n Provide and maintain water and electricity supplies for the 0.24 - 0.25 0.06 - 0.18 0.12 - 0.49 - - - 0.06 - 0.31

works. 0.26 0.3 1.12 1.12

o Electricity, water and telephone - - - - 0.14 - 0.41 - - - 0.14 - 0.41

0.67 0.67

p Temporary telephone 0.11 - 0.17 - 0.32 0.21 - 0.49 - - - 0.11 - 0.33

0.24 0.75 0.75

KAWASAN A KAWASAN B KAWASAN C KAWASAN D KAWASAN E KAWASAN F KESELURUHAN

(5)

BAHAGIAN : 2.0 - KOS KERJA-KERJA AM

SUB-BAHAGIAN : 2.2 - PERATUSAN KOS KERJA AM (GENERAL ITEMS) KEATAS JUMLAH HARGA KONTRAK Kawasan A - Perlis, Kedah, & P. Pinang Kawasan D - Johor

(DITOLAK JUMLAH KOS KERJA AM) Kawasan B - Perak Kawasan E - Pahang

-MENGIKUT BUTIRAN TERPERINCI Kawasan C - WP.KL , Selangor, N. Sembilan & Melaka Kawasan F - Terengganu & Kelantan

BIL. KETERANGAN KERJA UNIT JULAT PURATA JULAT PURATA JULAT PURATA JULAT PURATA JULAT PURATA JULAT PURATA JULAT PURATA

(RM) (RM) (RM) (RM) (RM) (RM) (RM) (RM) (RM) (RM) (RM) (RM) (RM) (RM)

4 Vehicle

a Vehicle for S.o.'s

Provide vehicle for the use of S.O.'s as specified

(I) Four Wheel Drive (Produa Kembara) No - 20,000.00 - - - 20,000.00

(ii) Four Wheel Drive (Pajero) No 35,000.00 - 73,700.00 72,000.00 - 76,825.00 39,200.00 - 69,600.00 - - - 70,000.00 60,000.00 - 74,150.00 35,000.00 - 72,855.00 114,100.00

81,650.00 100,000.00 90,000.00 114,100.00

(iii) Saloon Car - 1500 c.c. No 10,000.00 - 17,500.00 - - - 30,000.00 - - 10,000.00 - 23,750.00

25,000.00

30,000.00

(iv) Motorcycle not less than 110 c.c. No 2,000.00 - 4,000.00 3,600.00 - 4,500.00 8,000.00 - 8,500.00 - - - - 3,000.00 - 3,875.00 2,000.00 - 4,175.00 6,000.00

5,400.00 9,000.00 5,000.00 9,000.00

b Maintain the following vehicle including provision of insurance, road tax and fuel throughout the contract

(I) Four Wheel Drive (Perodua Kembara) Veh. - 500.00 - - - 500.00

Mth.

(ii) Four Wheel Drive (Pajero) Veh. 700.00 - 1,100.00 890.00 - 1296.66 - 1,500.00 - - - 500.00 500.00 - 950.00 500.00 - 1,069.33

Mth. 1,500.00 2,000.00 1,300.00 2,000.00

(iii) Saloon Car - 1500 c.c. Veh. 500.00 - 750.00 - - - 500.00 - 750.00

Mth. 1,000.00 1,000.00

(iv) Motorcycle not less than 110 c.c. Veh. 100.00 - 250.00 - - 66.00 - 134.00 - - - 100.00 66.00 - 161.33

Mth. 400.00 200.00 400.00

KAWASAN E KAWASAN F KESELURUHAN

KAWASAN A KAWASAN B KAWASAN C KAWASAN D

(6)

BAHAGIAN : 2.0 - KOS KERJA-KERJA AM

SUB-BAHAGIAN : 2.2 - PERATUSAN KOS KERJA AM (GENERAL ITEMS) KEATAS JUMLAH HARGA KONTRAK Kawasan A - Perlis, Kedah, & P. Pinang Kawasan D - Johor

(DITOLAK JUMLAH KOS KERJA AM) Kawasan B - Perak Kawasan E - Pahang

-MENGIKUT BUTIRAN TERPERINCI Kawasan C - WP.KL , Selangor, N.Sembilan & Melaka Kawasan F - Terengganu & Kelantan

BIL. KETERANGAN KERJA UNIT JULAT PURATA JULAT PURATA JULAT PURATA JULAT PURATA JULAT PURATA JULAT PURATA JULAT PURATA

(RM) (RM) (RM) (RM) (RM) (RM) (RM) (RM) (RM) (RM) (RM) (RM) (RM) (RM)

4 Vehicle (cont'd)

c Provide a boat service for the sole use of the S.O. No - - 2000.00 - 6,000.00 - - - 2000.00 - 6,000.00

and his Representative for the inspection and 10,000.00 10,000.00

supervision of the works with minimum sitting capacity of 6 passengers, fitted with 50 h.p. engine including operator, insurance, life jacket, fuels and etc. as specified.

c: prelim

KAWASAN A KAWASAN B KAWASAN C KAWASAN D KAWASAN E KAWASAN F KESELURUHAN

(7)

BAHAGIAN : 2.0 - KOS KERJA-KERJA AM

SUB-BAHAGIAN : 2.2 - PERATUSAN KOS KERJA AM (GENERAL ITEMS) KEATAS JUMLAH HARGA KONTRAK Kawasan A - Perlis, Kedah, & P. Pinang Kawasan D - Johor

(DITOLAK JUMLAH KOS KERJA AM) Kawasan B - Perak Kawasan E - Pahang

-MENGIKUT BUTIRAN TERPERINCI Kawasan C - WP.KL , Selangor, N.Sembilan & Melaka Kawasan F - Terengganu & Kelantan

BIL. KETERANGAN KERJA UNIT JULAT PURATA JULAT PURATA JULAT PURATA JULAT PURATA JULAT PURATA JULAT PURATA JULAT PURATA

(%) (%) (%) (%) (%) (%) (%) (%) (%) (%) (%) (%) (%) (%)

5 Photographs

a Supply unmounted colour photographs at various Set - - - - 0.01 - 0.12 - - - - 0.01 - 0.06 0.01 - 0.09

stages of construction as directed by S.O. 0.92 0.1 0.92

(i) Postcard size (3R) Set 0.01 - 0.06 0.02 - 0.04 0.03 - 0.07 0.004 - 0.02 0.005 - 0.06 - - 0.004 - 0.05

0.22 0.15 0.15 0.06 0.14 0.15

(ii) Ditto Size 10" x 8" Set - - - 0.02 - - - - 0.006 - 0.02 - - 0.006 - 0.02

0.05 0.05

(iii) 35mm colour slide Set 0.005 - 0.04 - - 0.02 - 0.08 0.008 - 0.02 0.02 - 0.08 - - 0.008 - 0.06

0.10 0.19 0.06 0.18 0.19

b Provide the service and use of a video camera and Set - - - - 0.09 - 0.12 0.02 - 0.04 - - - - 0.02 - 0.08

supply tapes to video tape the major features of the 0.14 0.07 0.14

work site before and after the works are completed as specified or as directed by the S.O.

c Produce, edited and narrated video film in colour Set - - - 0.72 - - - 0.72

accordance to specification.

KAWASAN E

KAWASAN A KAWASAN B KAWASAN C KAWASAN D KAWASAN F KESELURUHAN

(8)

BAHAGIAN : 2.0 - KOS KERJA-KERJA AM

SUB-BAHAGIAN : 2.2 - PERATUSAN KOS KERJA AM (GENERAL ITEMS) KEATAS JUMLAH HARGA KONTRAK Kawasan A - Perlis, Kedah, & P. Pinang Kawasan D - Johor

(DITOLAK JUMLAH KOS KERJA AM) Kawasan B - Perak Kawasan E - Pahang

-MENGIKUT BUTIRAN TERPERINCI Kawasan C - WP.KL , Selangor, N. Sembilan & Melaka Kawasan F - Terengganu & Kelantan

BIL. KETERANGAN KERJA UNIT JULAT PURATA JULAT PURATA JULAT PURATA JULAT PURATA JULAT PURATA JULAT PURATA JULAT PURATA

(%) (%) (%) (%) (%) (%) (%) (%) (%) (%) (%) (%) (%) (%)

6 Survey Works

a Mengadakan perkhimatan JuruUkur Berlesen, semua 0.27 - 0.39 - - 0.19 - 0.96 0.13 - 0.35 1.29 - 1.9 - - 0.13 - 0.90

pekerja, alat-alat dan semua yang perlu untuk 0.5 2.16 0.87 2.56 2.56

menjalankan kerja-kerja ukur menentukan kedudukan simpanan kerajaan, menanda batu sempadan, memasang garisan jajaran dan peket aras termasuk meminda jika ada kedudukan parit sediada dari dalam lot pertanian ke dalam kawasan simpanan parit.

b Allow for setting out of works and establishment of - - - - 0.29 - 0.72 - - - 0.15 - 1.03 0.15 - 0.63

temporary bench marks by qualified and approved 1.62 1.62

licensed surveyor including final survey for the preparation of as-built plans.

c Setting out primary survey, interim/joint survey and 0.19 - 0.32 0.22 - 0.56 0.58 - 1.34 - - 0.29 - 3.43 - - 0.19 - 1.41

final survey (as built survey) including plotting and 0.45 0.94 1.93 10.8 10.8

completion of survey plans.

d Setting out Alignment and level survey. - - - - 0.67 - 0.89 - - - 1.69 0.18 - 0.39 0.18 - 0.99

1.06 1.05 1.69

e Provide and maintain survey equipment as specified. 0.07 - 0.13 0.15 - 0.53 0.09 - 0.29 - 0.02 - - - 0.26 0.02 - 0.25

All survey equipment shall be reverted to the 0.18 1.52 0.72 1.52

Government upon completion of the works.

f Allow for final survey and production of as-built plan by a - - 0.04 - 0.14 0.08 - 0.42 - 0.16 - - - - 0.04 - 0.24

Licensed Land Surveyor together with 3 1/4" diskettes 0.27 0.63 0.63

in AutoCAD format, a copy of tracing and 3 copies of paper print as specified.

KAWASAN A KAWASAN B KAWASAN C KAWASAN D KAWASAN E KAWASAN F KESELURUHAN

(9)

BAHAGIAN : 2.0 - KOS KERJA-KERJA AM

SUB-BAHAGIAN : 2.2 - PERATUSAN KOS KERJA AM (GENERAL ITEMS) KEATAS JUMLAH HARGA KONTRAK Kawasan A - Perlis, Kedah, & P. Pinang Kawasan D - Johor

(DITOLAK JUMLAH KOS KERJA AM) Kawasan B - Perak Kawasan E - Pahang

-MENGIKUT BUTIRAN TERPERINCI Kawasan C - WP.KL , Selangor, N. Sembilan Kawasan F - Terengganu & Kelantan

BIL. KETERANGAN KERJA UNIT JULAT PURATA JULAT PURATA JULAT PURATA JULAT PURATA JULAT PURATA JULAT PURATA JULAT PURATA

(%) (%) (%) (%) (%) (%) (%) (%) (%) (%) (%) (%) (%) (%)

6 Survey Works (cont'd)

Allow for allignment survey for river reserve, by qualified - - - - 1.58 - 2.21 - - - 1.58 - 2.21

and approved Licensed Surveyor. 2.83 2.83

7 Test

a Provide for the S.O.'s representative and his staff all 0.09 - 0.23 - - - 0.24 - - - 0.09 - 0.24

necessary assistance (including labour and material for 0.36 0.36

supervision, testing and measurement of works).

b Provide for the inspection and testing of materials and 0.02 - 0.07 - 1.10 0.01 - 0.04 - - - 0.01 - 0.40

works as directed by the S.O. 0.11 0.09 1.10

8 Temporary Works

a Allow for all temporary works including where applicable - - 0.50 - 2.00 0.13 - 1.04 - - 0.36 - 1.61 - - 0.13 - 1.55

site clearance, temporary building, office, signboard, shed 4.00 2.49 2.32 2.49

for storage, installation, operation and maintenance of plant, cofferdams, dewatering, traffic controlling, removal of temporary works and clearance of site upon completion.

b Allow for all temporary works including where applicable 0.67 - 2.85 - - - 1.53 - 1.75 0.20 - 0.53 0.20 - 1.71

cofferdams, dewatering, shed for storage of construction 4.86 1.98 1.16 4.86

materials, removal/disposal of temporary work upon completion, access, maintenance of plants, reinstatement of works all other temporary works required for the construction and completion of the works.

KAWASAN A KAWASAN B KAWASAN C KAWASAN D KAWASAN E KAWASAN F KESELURUHAN

(10)

BAHAGIAN : 2.0 - KOS KERJA-KERJA AM

SUB-BAHAGIAN : 2.2 - PERATUSAN KOS KERJA AM (GENERAL ITEMS) KEATAS JUMLAH HARGA KONTRAK Kawasan A - Perlis, Kedah, & P. Pinang Kawasan D - Johor

(DITOLAK JUMLAH KOS KERJA AM) Kawasan B - Perak Kawasan E - Pahang

-MENGIKUT BUTIRAN TERPERINCI Kawasan C - WP.KL , Selangor, N. Sembilan & Melaka Kawasan F - Terengganu & Kelantan

BIL. KETERANGAN KERJA UNIT JULAT PURATA JULAT PURATA JULAT PURATA JULAT PURATA JULAT PURATA JULAT PURATA JULAT PURATA

(%) (%) (%) (%) (%) (%) (%) (%) (%) (%) (%) (%) (%) (%)

8 Temporary Works (cont'd)

c Allow and maintain all temporary works during the - - - 0.32 0.34 - 0.77 - - 0.15 - 0.48 - - 0.15 - 0.52

construction inclusive of access roads, bridges, 1.79 0.8 1.79

river diversions, pumping, dewatering and construction temporary cofferdam, sheet piling, strutting, shoring, etc.

and keep the face of excavation stable all times during construction period.

d Allow for maintenance for existing status of drainage - - - - 0.09 - 0.41 - - - 0.09 - 0.41

system and affected access road. 1.02 1.02

e Allow for temporary diversion, maintenance and protection - - - - 0.18 - 0.88 0.01 - 0.24 - - - - 0.01 - 0.56

of traffic including watching, lighting, temporary signboard 1.68 0.66 1.68

etc. as specified.

f Temporary works for excavation and backfilling inclusive - - - - 0.22 - 1.2 0.07 - 0.5 - - - - 0.07 - 0.85

of all shoring and strutting of excavation, cofferdam, 2.72 0.97 2.72

pumping, dewatering and phasing of excavation and backfilling to the approval of S.O.

KAWASAN A KAWASAN B KAWASAN C KAWASAN D KAWASAN E KAWASAN F KESELURUHAN

(11)

BAHAGIAN : 2.0 - KOS KERJA-KERJA AM

SUB-BAHAGIAN : 2.2 - PERATUSAN KOS KERJA AM (GENERAL ITEMS) KEATAS JUMLAH HARGA KONTRAK Kawasan A - Perlis, Kedah, & P. Pinang Kawasan D - Johor

(DITOLAK JUMLAH KOS KERJA AM) Kawasan B - Perak Kawasan E - Pahang

-MENGIKUT BUTIRAN TERPERINCI Kawasan C - WP.KL , Selangor, N. Sembilan & Melaka Kawasan F - Terengganu & Kelantan

BIL. KETERANGAN KERJA UNIT JULAT PURATA JULAT PURATA JULAT PURATA JULAT PURATA JULAT PURATA JULAT PURATA JULAT PURATA

(%) (%) (%) (%) (%) (%) (%) (%) (%) (%) (%) (%) (%) (%)

8 Temporary Works (cont'd)

g Provision of all temporary works required for execution - - - 1.03 - - - 1.03

and completion of the works, including ensuring safety and stability of existing structures and properties adjacent to excavation.

h The Contractor shall provide, erect, maintain and remove - - - - 0.09 - 0.32 - - - 0.09 - 0.32

on completion approved timber hoarding, warning sign, 0.72 0.72

lighting and such other precautionary measures necessary to ensure the safety of the public and others who may be on or in the vicinity of the site, all in accordance within the regulation of the relevant local and other Authorities. The Contractor shall be held solely responsible for all accidents arising from any negligence in this respect.

9 Office Equipment

a Provide and maintain one new photocopy machine - - - 0.37 0.29 - 0.94 - - - 0.29 - 0.66

complete with all necessary accessories and consumable 1.59 1.59

items.

b One number of new digital camera complete with No - - - - 0.39 - 0.76 - - - 0.48 - - 0.39 - 0.62

all necessary accessories and consumable items 1.13 1.13

required for the works.

c Provide and maintain throughout the contract period Set - - - 0.44 - - - 0.44

of a new LCD Projector with standard set of accessories of 3M Model or equivalent as specified.

d Provide of one (1) camera with lens 38mm - 135mm. Set - - - 0.055 - - - 0.055

KAWASAN E KAWASAN F KESELURUHAN

KAWASAN A KAWASAN B KAWASAN C KAWASAN D

(12)

BAHAGIAN : 2.0 - KOS KERJA-KERJA AM

SUB-BAHAGIAN : 2.2 - PERATUSAN KOS KERJA AM (GENERAL ITEMS) KEATAS JUMLAH HARGA KONTRAK Kawasan A - Perlis, Kedah, & P. Pinang Kawasan D - Johor

(DITOLAK JUMLAH KOS KERJA AM) Kawasan B - Perak Kawasan E - Pahang

-MENGIKUT BUTIRAN TERPERINCI Kawasan C - WP.KL , Selangor, N. Sembilan & Melaka Kawasan F - Terengganu & Kelantan

BIL. KETERANGAN KERJA UNIT JULAT PURATA JULAT PURATA JULAT PURATA JULAT PURATA JULAT PURATA JULAT PURATA JULAT PURATA

(%) (%) (%) (%) (%) (%) (%) (%) (%) (%) (%) (%) (%) (%)

10 Programme / Charts / Reports / As-Built Drawing

a Provision of Construction Program / Progress Chart as 0.03 - 0.055 - - 0.01 - 0.05 - - - 0.07 - - 0.01 - 0.06

specified. 0.08 0.12 0.12

b The Contractor shall prepare and submit daily site / progress - - - - 0.03 - 0.06 - - - 0.03 - 0.06

reports for the Works to be signed by both the Contractor's 0.12 0.12

representatives and S.O.'s Representative. The Contractor shall allow fo making copies of these reports for distribution to all parties concerned.

c Preparation and submission of As-Built Drawing 0.11 - 0.29 - - 0.03 - 0.28 0.07 - 0.13 - - - 0.28 0.03 - 0.25

0.65 0.57 0.22 0.65

d Contractor Superintendence 0.06 - 0.065 1.68 - 2.55 0.28 - 1.04 - - - 0.06 - 1.22

e Attendance upon S.O. and his staff, all necessary assistance - - 0.11 - 0.46 - - - 0.11 - 0.46

including manpower and materials for supervision, testing and 0.82 0.82

measurement of Works.

f Allow for fortnigthly progress reports and photograph (One set Set - - - - 0.05 - 0.13 - - - 0.05 - 0.13

shall mean not less than 10 nos., 3R colour photographs and 35 mm 0.21 0.21

negative as specified). Eight (8) copies of progress report to be provided every two weeks.

KAWASAN A KAWASAN B KAWASAN C KAWASAN D KAWASAN E KAWASAN F KESELURUHAN

(13)

BAHAGIAN : 2.0 - KOS KERJA-KERJA AM

SUB-BAHAGIAN : 2.2 - PERATUSAN KOS KERJA AM (GENERAL ITEMS) KEATAS JUMLAH HARGA KONTRAK Kawasan A - Perlis, Kedah, & P. Pinang Kawasan D - Johor

(DITOLAK JUMLAH KOS KERJA AM) Kawasan B - Perak Kawasan E - Pahang

-MENGIKUT BUTIRAN TERPERINCI Kawasan C - WP.KL , Selangor, N. Sembilan Kawasan F - Terengganu & Kelantan

BIL. KETERANGAN KERJA UNIT JULAT PURATA JULAT PURATA JULAT PURATA JULAT PURATA JULAT PURATA JULAT PURATA JULAT PURATA

(%) (%) (%) (%) (%) (%) (%) (%) (%) (%) (%) (%) (%) (%)

11 Mobilisation of all plants, machineries and equipment that 0.11 - 0.36 0.21 - 0.31 0.09 - 0.48 0.11 - 0.20 0.8 - 1.36 0.09 - 0.38 0.09 - 0.52

are necessary for the adequate completion of the works and 0.87 0.47 1.06 0.44 1.93 0.83 1.93

demobilisation of all from site upon completion of all works.

12 Provide for cost incurred by the relevant authority in the 0.93 - 1.58 - - 1.68 - 3.85 2.37 - 5.93 1.54 - 3.22 - - 0.93 - 3.65

permanent diversion of services such as piped water 2.69 6.79 13.12 6.75 13.12

supply, electric cables and telecommunication duct.

13 Provide maintenance and reinstatement of the access road - 0.17 - 0.94 0.09 - 0.76 0.08 - 0.23 - - - - 0.09 - 0.53

to the (including associated structures), drainage, etc, used 1.65 0.66 1.65

by the contractor for the execution of the contract.

14 Allow for all cost and expenses in using the existing access - - 0.22 - 0.32 0.09 - 0.29 - - 0.41 - 0.61 - - 0.09 - 0.41

road to the sites including compliance with the requirement 0.44 0.63 0.81 0.81

of the Local Authorities, JKR and Distrct Office for using the access roads to the satisfaction of the Authorities concerned.

15 Allow for the maintenance and repair of Public and Private - - - 0.29 0.29 - 0.32 - - - 0.07 - - 0.07 - 0.23

Roads. Properties and services of any damages caused by 0.36 0.36

his palnts, equipmentand workmen including his sub - contractor and supplier during the execution of the Works.

KAWASAN C KAWASAN B

KAWASAN A KAWASAN D KAWASAN E KAWASAN F KESELURUHAN

(14)

BAHAGIAN : 2.0 - KOS KERJA-KERJA AM

SUB-BAHAGIAN : 2.2 - PERATUSAN KOS KERJA AM (GENERAL ITEMS) KEATAS JUMLAH HARGA KONTRAK Kawasan A - Perlis, Kedah, & P. Pinang Kawasan D - Johor

(DITOLAK JUMLAH KOS KERJA AM) Kawasan B - Perak Kawasan E - Pahang

-MENGIKUT BUTIRAN TERPERINCI Kawasan C - WP.KL , Selangor, N. Sembilan & Melaka Kawasan F - Terengganu & Kelantan

BIL. KETERANGAN KERJA UNIT JULAT PURATA JULAT PURATA JULAT PURATA JULAT PURATA JULAT PURATA JULAT PURATA JULAT PURATA

(%) (%) (%) (%) (%) (%) (%) (%) (%) (%) (%) (%) (%) (%)

16 First Aid Kit - 0.07 - 0.03 0.01 - 0.015 - - - 0.07 0.02 - 0.03 0.01 - 0.04

0.02 0.04 0.07

17 Provision of first aid facilities, waterproof clothing, boots, - - - 0.24 - - - 0.24

helmets and safety equipment etc. for the S.O.'s Representative and his staff.

18 Provide instruments for Contractor's own use and for - - - 0.24 - - - 0.24

the use of S.O.'s Representative.

19 The Contractor shall provide and maintain all necessary - - - - 0.03 - 0.07 - - - 0.03 - 0.07

Wellington boots, protective and safety helmets and heavy 0.13 0.13

duty raincoats for S.O.'s staff and official visitors.

20 Provide all necessary warning signs and lamps for the - - 0.10 - 0.16 0.03 - 0.06 - - - -0.03 - 0.11

whole period of Work while in progress and dismantle 0.22 0.15 0.22

and remove on completion.

21 Provide all necessary watching by day and night for the whole - - - - 0.14 - 0.20 - - - 0.14 - 0.20

contract period or any extension thereof. 0.25 0.25

22 Allow for clearing and cleaning up upon completion. 0.03 - 0.14 0.07 - 0.09 0.13 - 0.25 0.03 - 0.09 - 0.68 - - 0.03 - 0.25

0.33 0.11 0.56 0.22 0.68