Printed in USA Nov 2020 P/N 164886 Rev. D

Step 2: Wire the Node and Gateway

Wire the power, discrete I/O, and analog I/O on the Node and Gateway according to the wiring diagram shown.

Gateway Model DX80G2M6S-PB2 Node Model

DX80N2X6S-PB2

Quick Start Guide for -PB2 Point-to-Point Networks

This Quick Start Guide describes how to replace discrete and analog signal wires using one Node and one Gateway when using the DX80G2M6S-PB2 Gateway’s DIP switch-based mapping.

I/O Mapping

Node Inputs Gateway Output

Analog IN 1 Analog OUT 1

Analog IN 2 Analog OUT 2

Discrete IN 1 Discrete OUT 1

Discrete IN 2 Discrete OUT 2

Gateway

Inputs Node Outputs

Analog IN 1 Analog OUT 1

Analog IN 2 Analog OUT 2

Discrete IN 1 Discrete OUT 1

Discrete IN 2 Discrete OUT 2

Step 1: Set the Gateway’s DIP Switches

In the example network shown, the Node and Gateway are a mapped pair. To configure this I/O mapping, set the Gateway’s DIP switch 2 and switch 8 ON. Refer to the Gateway’s datasheet for other mapping options and the link loss settings.

1

1 8

ON

DIP switches LED

2 3 4 5 6

AI1

DO2

Not used AI2 DI1 DI2 GND DO1

AO1 AO2 485+

485−

GND 10–30 V dc PWR

+

Load Load

RS-485 + RS-485 −

+

7

14 6

8 9 10 11 12 13 1 2 3 4 5

Node and Gateway Wiring

1

1 8

ON

DIP switches LED

2 3 4 5 6

ON OFF

(2)

Banner Engineering Corp. • Minneapolis, MN U.S.A www.bannerengineering.com • Tel: 763.544.3164

2

   P/N 164886 Rev. D

Quick Start Guide for -PB2 Point-to-Point Networks

Step 4: Verify Radio Communication

To verify the Gateway and Nodes are communicating:

• Gateway's LED 1 is solid green.

• Until communication is established with the Gateway, the Node's red LED flashes.

• After communication is established, the Node’s green LED flashes.

Step 5: Conduct a Site Survey

To test the radio signal strength between the Gateway and the Node, conduct a site survey.

1. On the Gateway, set the rotary dials to 00 to first turn the site survey off.

2. On the Gateway, set the rotary dials to the Node’s address. In this example, set the rotary dials to 01.

3. The Gateway’s amber LED blinks to indicate the signal strength.

The LED blinks faster to indicate a stronger signal. For the definition of the blink speed and how it corresponds to the signal strength, refer to the -PB2 Gateway datasheet (p/n 163211).

4. To end the site survey, change the Gateway’s rotary dials back to 00.

5. If there is no radio signal between the Gateway and Node, the LED turns a solid amber.

Step 3: Bind the Node to the Gateway

Binding Nodes to their Gateway ensures the Nodes only exchange data with the Gateway they are bound to. To create your network, bind the Nodes to the Gateway and assign them a unique Node address.

1. On the Gateway, enter binding mode by triple-clicking the button.

2. On the Node, use both rotary dials to assign the Node address. Set the left dial to 0 and the right dial to 1.

After the Node is bound, the LED flashes four times. The Node automatically exits binding mode.

3. On the Node, enter binding mode by triple-clicking the button.

4. On the Gateway, single-click button the button to exit binding mode.

1

Tens unit Ones unit 1 8

30.48 [1.2”]

45.72 [1.8”]

60.96 [2.4”]

Hole for #6 screw (3)

53.34 [2.1”]

ON

7

14

Binding button

Antenna connection DIP switches

Rotary dials LED 2

3 4 5 6

8 9 10 11 12 13

Referensi

Dokumen terkait

The results of fragmentation analysis of compound 7 (Table 5) found that the compound was likely to tert-butyl- 2-aminophenylcarbamol, as a result of the reduction of

Robotic maze pathfinding problems deal with detecting the correct route from the start point to the end-point in a virtual maze environment consisting of walls.