NOTES:
1. ALL DIMENSION ARE IN METERS AND MILLIMETERS UNLESS SHOWN OTHERWISE.
2. DRAWINGS ARE NOT TO BE SCALED, THE STATED DIMENSIONS ONLY ARE TO BE TAKEN.
3. ANY INCONSISTENCY OR DISCREPANCY IS TO BE BROUGHT TO THE ATTENTION OF & RESOLVED BY THE ENGINEER BEFORE THE WORK IS PUT IN HAND.
4. DRAWINGS ARE TO BE READ IN CONJUNCTION WITH THE RELEVANT ARCHITECTURAL AND SERVICES DRAWINGS.
PREPARED BY PROJECT TITLE DESIGNED FOR:
LOCATION: TACLOBAN CITY, LEYTE
SHEET CONTENTS: SHEET NO./
TIN No.:
REG DATE:
ISSUED:
REG No.: PTR No.:
REG VALID:
IAPOA No.:
CONSTRUCTION OF MEN'S FOUR (4) STOREY DORMITORY BUILDING
PHASE 1 (AS-BUILT) REPUBLIC ACT 9266
DRAWINGS AND SPECIFICATIONS AND OTHER CONTRACT DOCUMENTS DULY SIGNED, STAMPED OR SEALED, AS INSTRUMENTS OF SERVICE, ARE THE INTELLECTUAL PROPERTY AND DOCUMENT OF THE ARCHITECT, WHETHER THE OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR ANY PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE REPETITION OF AND FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTY OR IN WHOLE, WITHOUT THE WRITTEN CONSENT OF ARCHITECT OR AUTHOR OF SAID DOCUMENT.
A
16
CHECKED BY: RECOMMENDING APPROVAL:
DR. EVELYN B. AGUIRRE
APPROVED BY:
UNIVERSITY PRESIDENT
JUDE A. DUARTE, DPA
VP for ADMINISTRATION & FINANCEPROJECT ENGINEER
ENGR. CARLITO A. ELLAZAR
PROJECT CONTROL ENGINEERENGR. CLINTON VAL BRIGOLA
REVIEWED BY:
CAO, ADMINISTRATION
REYNALDO B. GARNACE, DA CONFORMED BY:
15
TOILET DETAILS
3RD FIN. FLR. LINE
2ND FIN. FLR. LINE
GROUND FIN. FLR. LINE
STREET LEVEL
2ND FIN. FLR. LINE
GROUND FIN. FLR. LINE
STREET LEVEL
NOTES:
1. ALL DIMENSION ARE IN METERS AND MILLIMETERS UNLESS SHOWN OTHERWISE.
2. DRAWINGS ARE NOT TO BE SCALED, THE STATED DIMENSIONS ONLY ARE TO BE TAKEN.
3. ANY INCONSISTENCY OR DISCREPANCY IS TO BE BROUGHT TO THE ATTENTION OF & RESOLVED BY THE ENGINEER BEFORE THE WORK IS PUT IN HAND.
4. DRAWINGS ARE TO BE READ IN CONJUNCTION WITH THE RELEVANT ARCHITECTURAL AND SERVICES DRAWINGS.
PREPARED BY PROJECT TITLE DESIGNED FOR: SHEET CONTENTS: SHEET NO./
REG No.: PTR No.:
IAPOA No.:
CONSTRUCTION OF MEN'S FOUR (4) STOREY DORMITORY BUILDING
PHASE 1 (AS-BUILT) REPUBLIC ACT 9266
DRAWINGS AND SPECIFICATIONS AND OTHER CONTRACT DOCUMENTS DULY SIGNED, STAMPED OR SEALED, AS INSTRUMENTS OF SERVICE, ARE THE INTELLECTUAL PROPERTY AND DOCUMENT OF THE ARCHITECT, WHETHER THE OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR ANY PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE REPETITION OF AND FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED
A
16
CHECKED BY: RECOMMENDING APPROVAL:
DR. EVELYN B. AGUIRRE
APPROVED BY:
UNIVERSITY PRESIDENT
JUDE A. DUARTE, DPA
VP for ADMINISTRATION & FINANCEPROJECT ENGINEER
ENGR. CARLITO A. ELLAZAR
PROJECT CONTROL ENGINEERENGR. CLINTON VAL BRIGOLA
REVIEWED BY:
CAO, ADMINISTRATION
REYNALDO B. GARNACE, DA CONFORMED BY:
BAY SECTION
16
SHEET CONTENTS: SHEET NO./
S
12
LOCATION: TACLOBAN CITY, LEYTE
PLACE: TIN:
PRC No.: VALIDITY:
CIVIL ENGINEER
DATE:
ENGR. JOMAR S. ESTREBELLO, ME1, CE
REPUBLIC ACT 9266
DRAWINGS AND SPECIFICATIONS AND OTHER CONTRACT DOCUMENTS DULY SIGNED, STAMPED OR SEALED, AS
INSTRUMENTS OF SERVICE, ARE THE INTELLECTUAL PROPERTY AND DOCUMENT OF THE ARCHITECT, WHETHER THE OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR ANY PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE REPETITION OF AND FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTY OR IN WHOLE, WITHOUT THE WRITTEN CONSENT OF ARCHITECT OR AUTHOR OF SAID DOCUMENT.
DESIGNED FOR:
PROJECT NAME: NOTED BY:
CONSTRUCTION OF MEN'S FOUR (4) STOREY DORMITORY BUILDING
PHASE 01 (AS-BUILT)
RECOMMENDING APPROVAL:
DR. EVELYN B. AGUIRRE
CHECKED BY: APPROVED BY:
UNIVERSITY PRESIDENT
JUDE A. DUARTE, DPA
VP for ADMINISTRATION & FINANCEPROJECT CONTROL ENGINEER
ENGR. CLINTON VAL BRIGOLA SEAL
SIGNATURE
SURIGAO CITY 0117516 1231880
3-31-22 1-23-20 444-404-384-000 PTR No.:
CONFORMED BY:
CAO, ADMINISTRATION
REYNALDO B. GARNACE, DA
PROJECT ENGINEERENGR. CARLITO A. ELLAZAR GENERAL NOTES
01
REPUBLIC OF THE PHILIPPINES OFFICE OF THE BUILDING OFFICIAL TACLOBAN CITY
RECOMMENDING APPROVAL :
HEAD STR'L SEC. DATE APPROVED :
BUILDING OFFICIAL DATE
400
OFFICE OF THE BUILDING OFFICIAL
RECOMMENDING APPROVAL :
HEAD STR'L SEC. DATE APPROVED :
BUILDING OFFICIAL DATE TACLOBAN CITY
SHEET CONTENTS: SHEET NO./
S
12
CIVIL ENGINEER
ENGR. JOMAR S. ESTREBELLO, ME1, CE
REPUBLIC ACT 9266
DRAWINGS AND SPECIFICATIONS AND OTHER CONTRACT DOCUMENTS DULY SIGNED, STAMPED OR SEALED, AS
INSTRUMENTS OF SERVICE, ARE THE INTELLECTUAL PROPERTY AND DOCUMENT OF THE ARCHITECT, WHETHER THE OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR ANY PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE REPETITION OF AND FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED
DESIGNED FOR:
PROJECT NAME: NOTED BY:
CONSTRUCTION OF MEN'S FOUR (4) STOREY DORMITORY BUILDING
PHASE 01 (AS-BUILT)
RECOMMENDING APPROVAL:
DR. EVELYN B. AGUIRRE
CHECKED BY: APPROVED BY:
UNIVERSITY PRESIDENT
JUDE A. DUARTE, DPA
VP for ADMINISTRATION & FINANCEPROJECT CONTROL ENGINEER
ENGR. CLINTON VAL BRIGOLA SEAL
SIGNATURE
CONFORMED BY:
CAO, ADMINISTRATION
REYNALDO B. GARNACE, DA
PROJECT ENGINEERENGR. CARLITO A. ELLAZAR
02
GENERAL NOTES
REPUBLIC OF THE PHILIPPINES OFFICE OF THE BUILDING OFFICIAL
RECOMMENDING APPROVAL :
HEAD STR'L SEC. DATE APPROVED :
BUILDING OFFICIAL DATE TACLOBAN CITY
FTB-1
FTB-1 FTB-1 FTB-1
FTB-1
FTB-1 FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1 FTB-1
FTB-1 FTB-1
FTB-1 FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
FTB-1 FTB-1
FTB-1 FTB-1
FTB-1 FTB-1
FTB-1 FTB-1
FTB-1 FTB-1
FTB-1 FTB-1
FTB-1 FTB-1
FTB-1
FTB-1
FTB-1
FTB-1 FTB-1
FTB-1 FTB-1
FTB-1 FTB-1
FTB-1 FTB-1
FTB-1
FTB-1 FTB-1 FTB-1 FTB-1 FTB-1 FTB-1 FTB-1 FTB-1
FTB-1 FTB-1
3100 5050
4950 4950
4950 4950
4950 4950
5050 3100
3200 3500 2600 6700 16000 46000
SCALE 1:100 MTS.
FOUNDATION PLAN (AS-BUILT)
03
SHEET CONTENTS: SHEET NO./
S
12
LOCATION: TACLOBAN CITY, LEYTE
PLACE: TIN:
PRC No.: VALIDITY:
CIVIL ENGINEER
DATE:
ENGR. JOMAR S. ESTREBELLO, ME1, CE
REPUBLIC ACT 9266
DRAWINGS AND SPECIFICATIONS AND OTHER CONTRACT DOCUMENTS DULY SIGNED, STAMPED OR SEALED, AS
INSTRUMENTS OF SERVICE, ARE THE INTELLECTUAL PROPERTY AND DOCUMENT OF THE ARCHITECT, WHETHER THE OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR ANY PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE REPETITION OF AND FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTY OR IN WHOLE, WITHOUT THE WRITTEN CONSENT OF ARCHITECT OR AUTHOR OF SAID DOCUMENT.
DESIGNED FOR:
PROJECT NAME: NOTED BY:
CONSTRUCTION OF MEN'S FOUR (4) STOREY DORMITORY BUILDING
PHASE 01 (AS-BUILT)
RECOMMENDING APPROVAL:
DR. EVELYN B. AGUIRRE
CHECKED BY: APPROVED BY:
UNIVERSITY PRESIDENT
JUDE A. DUARTE, DPA
VP for ADMINISTRATION & FINANCEPROJECT CONTROL ENGINEER
ENGR. CLINTON VAL BRIGOLA SEAL
SIGNATURE
SURIGAO CITY 0117516 1231880
3-31-22 1-23-20 444-404-384-000 PTR No.:
CONFORMED BY:
CAO, ADMINISTRATION
REYNALDO B. GARNACE, DA
PROJECT ENGINEERENGR. CARLITO A. ELLAZAR FOUNDATION PLAN
OFFICE OF THE BUILDING OFFICIAL
RECOMMENDING APPROVAL :
HEAD STR'L SEC. DATE APPROVED :
BUILDING OFFICIAL DATE TACLOBAN CITY
WF - 1 WF - 1
WF - 1 WF - 1
WF - 1
WF - 1
WF - 1 WF - 1 WF - 1
WF - 1 WF - 1
WF - 1 WF - 1
WF - 1 WF - 1
WF - 1 WF - 1
WF - 1
WF - 1
WF - 1 WF - 1 WF - 1
WF - 2
WF - 1 WF - 1 WF - 1
WF - 1 WF - 1 WF - 1
WF - 2
WF - 2 WF - 2
WF - 2 WF - 2
WF - 2 WF - 2
WF - 2 WF - 2
WF - 2 WF - 2
WF - 2 WF - 2 WF - 2
WF - 2
WF - 2 WF - 2
WF - 2 WF - 2
WF - 2
WF - 2 WF - 2 WF - 2 WF - 2 WF - 2
WF - 2 WF - 2
WF - 2
WF - 2
WF - 2
WF - 1
WF - 1
WF - 1 WF - 1 WF - 1 WF - 1 WF - 1
WF - 1
O . 1 2 5 T H K . @ D I A . 1 2 M M REINFORCEMENT BARS @ 300MM S P A C I N G O . C . BOTHWAYS WITH 1 0 0 M M T H K . GRAVEL BEDDING O N 9 5 % M I N . C O M P A C T I O N
O . 1 2 5 T H K . @ D I A . 1 2 M M REINFORCEMENT BARS @ 300MM S P A C I N G O . C . BOTHWAYS WITH 1 0 0 M M T H K . GRAVEL BEDDING O N 9 5 % M I N . C O M P A C T I O N
O . 1 2 5 T H K . @ D I A . 1 2 M M REINFORCEMENT BARS @ 300MM S P A C I N G O . C . BOTHWAYS WITH 1 0 0 M M T H K . GRAVEL BEDDING O N 9 5 % M I N . C O M P A C T I O N
3100 5050
4950 4950
4950 4950
4950 4950
5050 3100
3200 3500 2600 6700 16000 46000
SCALE 1:100 MTS.
GROUND FLOOR PLAN (AS-BUILT)
04
GROUND FLOOR PLAN
SHEET CONTENTS: SHEET NO./
S
12
CIVIL ENGINEER
ENGR. JOMAR S. ESTREBELLO, ME1, CE
REPUBLIC ACT 9266
DRAWINGS AND SPECIFICATIONS AND OTHER CONTRACT DOCUMENTS DULY SIGNED, STAMPED OR SEALED, AS
INSTRUMENTS OF SERVICE, ARE THE INTELLECTUAL PROPERTY AND DOCUMENT OF THE ARCHITECT, WHETHER THE OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR ANY PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE REPETITION OF AND FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED
DESIGNED FOR:
PROJECT NAME: NOTED BY:
CONSTRUCTION OF MEN'S FOUR (4) STOREY DORMITORY BUILDING
PHASE 01 (AS-BUILT)
RECOMMENDING APPROVAL:
DR. EVELYN B. AGUIRRE
CHECKED BY: APPROVED BY:
UNIVERSITY PRESIDENT
JUDE A. DUARTE, DPA
VP for ADMINISTRATION & FINANCEPROJECT CONTROL ENGINEER
ENGR. CLINTON VAL BRIGOLA SEAL
SIGNATURE
CONFORMED BY:
CAO, ADMINISTRATION
REYNALDO B. GARNACE, DA
PROJECT ENGINEERENGR. CARLITO A. ELLAZAR
REPUBLIC OF THE PHILIPPINES OFFICE OF THE BUILDING OFFICIAL
RECOMMENDING APPROVAL :
HEAD STR'L SEC. DATE APPROVED :
BUILDING OFFICIAL DATE TACLOBAN CITY
SCALE 1:100 MTS.
2ND & 3RD FLOOR FRAMING PLAN
2G-4A
2G-4A
SEE RAMP DETAIL
2G-4A 2G-4A
2G-3
2G-1
S1
S1 S1
S2 S1
S1
S1 S1 S1
S1
S1 S1 S1
S1 S3
3100 5050
4950 4950
4950 4950
4950 4950
5050 3100
S2 S2
S2 S2
2G-3A S2 S2 S2
3200 3500 2600 6700 16000 46000
S1 S1
2G-1
2G-1A
2B-1
2B-1
2G-2
2G-2 S2
S3
2G-4A 2G-4
2G-4 2G-4
2G-4 2G-4
2G-4 2G-4
2G-4 2G-4
2G-4 2G-4
2G-4A
2G-2
2G-2 2G-2
2G-2 2G-2
2G-2 2G-2
2G-2 2G-2
2G-2 2G-2
2G-2 2G-2
2G-2
2G-1
2G-1
2G-4A 2G-4A
2G-4 2G-1 2G-1
2G-3 2G-1B 2G-1B
2G-3 2G-1 2G-1
2G-3 2G-3 2G-1 2G-1
2G-3
2G-3 2G-1B 2G-1B
2G-1B 2G-1B
2G-1B
05
2ND & 3RD FLOOR FRAMING PLAN
SHEET CONTENTS: SHEET NO./
S
12
LOCATION: TACLOBAN CITY, LEYTE
PLACE: TIN:
PRC No.: VALIDITY:
CIVIL ENGINEER
DATE:
ENGR. JOMAR S. ESTREBELLO, ME1, CE
REPUBLIC ACT 9266
DRAWINGS AND SPECIFICATIONS AND OTHER CONTRACT DOCUMENTS DULY SIGNED, STAMPED OR SEALED, AS
INSTRUMENTS OF SERVICE, ARE THE INTELLECTUAL PROPERTY AND DOCUMENT OF THE ARCHITECT, WHETHER THE OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR ANY PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE REPETITION OF AND FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTY OR IN WHOLE, WITHOUT THE WRITTEN CONSENT OF ARCHITECT OR AUTHOR OF SAID DOCUMENT.
DESIGNED FOR:
PROJECT NAME: NOTED BY:
CONSTRUCTION OF MEN'S FOUR (4) STOREY DORMITORY BUILDING
PHASE 01 (AS-BUILT)
RECOMMENDING APPROVAL:
DR. EVELYN B. AGUIRRE
CHECKED BY: APPROVED BY:
UNIVERSITY PRESIDENT
JUDE A. DUARTE, DPA
VP for ADMINISTRATION & FINANCEPROJECT CONTROL ENGINEER
ENGR. CLINTON VAL BRIGOLA SEAL
SIGNATURE
SURIGAO CITY 0117516 1231880
3-31-22 1-23-20 444-404-384-000 PTR No.:
CONFORMED BY:
CAO, ADMINISTRATION