• Tidak ada hasil yang ditemukan

-7"-

N/A
N/A
Protected

Academic year: 2023

Membagikan "-7"-"

Copied!
1
0
0

Teks penuh

(1)

,Arury -7"- 90?E ol t\)opry

PROJECT:RepJrfor pOutt F:● or Framing=Deepwe‖

LOCAT10N:KSu Bu:anao campus,Tabuk City,Kalinga KALINGA STATE UNiVERSITY

OFFICE OF THE PLANNINO ANO STRATECY

OPSC●H■2

[ o ive Date:

:TEMS N0 :TEMS OF WORK QTY UNIT SCOPE OF WORKS

1003(6)

FL00R FRAMlNG

37600

bd Ft

‐Covers replacement of a‖ non‐sliff framing of the structure and placement of vertical framing to the rear

side ofthe building

‐Covers app‖ cation or sOFgnum to the whole framing of the structure

801

REMOVAL OF

OBSTRUCT10NS 37600

bd Ft

Covers removal of non stiff■ oor framing ofthe structure

1002(5)

WATER SupPLY PIPES AND

FITTINGS 3600

im -Covers items of piping system from the deepr/ell lo the poullry slructure to be supplied r,vith water.

1201(1)

WATER PUMPING SYSTEM 100

lump sum

―Covers nems Of submersible pump′ pumping system to be instaned in the deepwe‖

SPL RENOVAT10N OF EXISTING

DEEPWELL 100

lump sum -Covers the exisling deepwell, excavalion untilwater sippage is found.

B5

PRO」

ECT BILLBOARD 100

pc -Covers proiect sign board of the building construction.

Page/1of 1

Prepared by:

KSu:NFRA

Checked by: Recommending

dodlt

Firro 4. rh. d'idiot 6ffi.d copy of tnk dqrntn k,r,r'.r,.

"-r*

at-.,r,t

a-.*n

r,

ucom,aro.r-'a".,"i-jt

-a

rr**.

Engr.

Chairman

CPA,DBM

Referensi

Dokumen terkait

A bidder may opt to submit their bid envelope before the bid opening at the BAC Office, Administration Building, KSU-Main Campus, National Highway, Purok 6, Bulanao, Tabuk City, Kalinga

Trias City, Cavite, 4107 Philippines T: +63464246869 M: +639399301875 E: urs.philippines@gmail.com LETTER OF CONFIRMATION This is to confirm that Kalinga State University KSU