:TEMS N0 :TEMS OF WORK QTY UNIT SCOPE OF WORKS
1003(6)
FL00R FRAMlNG
37600
bd Ft‐Covers replacement of a‖ non‐sliff framing of the structure and placement of vertical framing to the rear
side ofthe building
‐Covers app‖ cation or sOFgnum to the whole framing of the structure
801
REMOVAL OF
OBSTRUCT10NS 37600
bd Ft‐Covers removal of non stiff■ oor framing ofthe structure
1002(5)
WATER SupPLY PIPES AND
FITTINGS 3600
im -Covers items of piping system from the deepr/ell lo the poullry slructure to be supplied r,vith water.1201(1)
WATER PUMPING SYSTEM 100
lump sum―Covers nems Of submersible pump′ pumping system to be instaned in the deepwe‖
SPL RENOVAT10N OF EXISTING
DEEPWELL 100
lump sum -Covers the exisling deepwell, excavalion untilwater sippage is found.B5
PRO」
ECT BILLBOARD 100
pc -Covers proiect sign board of the building construction.ヽ
Page/1of 1
Prepared by:
KSu:NFRA
Checked by: Recommending
dodlt
Firro 4. rh. d'idiot 6ffi.d copy of tnk dqrntn k,r,r'.r,."-r*
at-.,r,ta-.*n
r,ucom,aro.r-'a".,"i-jt
-arr**.
だ
Engr.
Chairman