Ka‖nga State University
BIDS AND AWARDS COMMIT‐ 「EE BAC Resolulon
C
A RESOLUT:ON RECOMMEND:NG ALTERNA‐
THROUGH NEGOTlATED PROCUREMENT UNI AND RECOMMENDING FOR AV
ffOr ABCS Wた わ
>PおP5θ ′ θ
Oθ。 00 an(
BAC Resdutbn No.里 り ̲̲
Series of2019
ControlNo.:
WHEREAtthe Kalinga State University (KSU)seekstoattain economyand efticiency in allaspects of its procurementoperations
by
resortingto
the above-mentioned Alternative l',/ethodof
Procurement consistentwith
Rule XVIof
the lmplementing Rules and Regulations of Republk- Am No. 9l 84;WHEREAS,
the
KSU Bids and Awatds-Cpmmittee was taskedto
evaluatethe
Purchase Request No./Requestfor euotation No. !41-)b-OtLb .for
the procurement ofl4goods
not covered by Shopping under Secrion 52 of the IRR of RA 9'184,[
] infrastructure projects, or[
] consutting services;WHEREAS, said items are included and
conformed to the
approvedbudget of the end-use/s
Project Procurement Management Plan (PPMP), and KSU Annual Procurernent Plan (APP) for CY 2019;WHEREAS, the following are the justifications, as applicable, for purchase of said goods:
L
-f
1.
That theamount
involved is above Php50,000.oo and/or equalsto but
below Phpl ,000,000.oo, which isan small amount to qualify lor the corrduct of public bidding, and within the thresholds prescribed in Annex
'H' ofthe
201 6 IRR of RA 91 84 for SUCs)1
2. That the BAC, through its Secrerariat, shall post the RFQ/Canvass for 3 calendar days and Notice of Award/'
P't(chase Order in the PhilGEPS, KSU websites and at any conspicuous place reserve for this purpose in the-/
p;remises of the University for information and transparency purposes.(l
3. The goo<Js are not available/offered,/or.rt of stock at the DBM Procurement Service.t I
4. That procurernent of these goods does not fall under the prohibitionon'splitting
of Government Contracts."t I
5. KSU has ensured that the obrjectives and purpose of the contract do not constitute an unnecessary, excessive, extravagant, or unconscionable expendituret I
6. there are 3 price quotations/canvasses sent to prospective qualified suppliers, contmctors or consultantsto
obtain the most possible lowest offer that is advantageousto
the government: however, receipt of at least one (1) quotation is suffrcient to proceed with the evaluation;t I
7. Thatthe
BAC has determinedwhether
KSU isentering into a contract with technically,
legally and financially capablesupplie(s) or contracto(s) by
requiringthe
submissionof
relevantdocuments
or through other rneans prior to recornrnendatbn of the awarcj of contract.NOW THEREFORE, rve the Members of the BAC, hereby RESOLVE AS lT HEREBY RESOLVED:
to recommend Alternative Method of Procurement Negotiated Procurement under Small
Value Procurement as providedin
Section 53.9 and its Guidelines ofthe
Revised lRRof
R.A. 9184 for the above- cited goods/services; andto recommend the award and approva! by the KSU President of this Resolution through issuance of Purchase Order
to the bonafide suppliii/s, contiactor/s or
consultanVsas indicated in the Abstract of
SealedQuotation/Canvas'
Approved by HEAD OFttHE PROC∪ RING[
:AM.解 ヽ YmGAN
Member
The o日y contrdled∞py ofthにd∝u nent S the orl」nd Slgned copy maintahed h the BAC Sよ は anat s∝ lon The reader mlst ensure thatthに or any dher copy of a coarOl:ed documeは is cured and●ompiete prlorto use The duplicate cttned cOpy ofthis docurlettis wnh the Records CX喘 ce The user should
secure the latest re燻31on ofths d∝ullert fЮm the BAC Secretaiat Secton Ttt d∝ umentis UNCONTROLLED when downioaded and pinted
Campus, National Highway, Purok6, Bulanao,Tabuk
Concurred
bythe
BIDSAQnWnnOS
COMMITTEE:U。