Page 1 of 1
Annex A: Bill of Quantities
ITEM NO.
DESCRIPTION QTY UNIT
Unit Price(in Pesos) Total Cost (in Pesos) 101 (1) Removal of Structures and Obstruction 1.00 Ls
803(1) Structure Excavation (Common Soil and Footing) 0.57 cu.m
900(1) Structural Concrete 1.07 cu.m
404 Reinforcing Steel Bars 174.24 kgs
1002(8) Plumbing Fixtures 1.00 Ls
1002 (28) Cold Water Lines 1.00 Ls
1005(6) Steel Window (Awning Type) 1.28 sq.m
1013(1) Corrugated Metal Roofing 4.68 sq.m
1018 (2) Unglazed tiles 4.53 sq.m
1018 (7) Glazed tiles 19.79 sq.m
1027 (1) Cement Plaster Finish 36.15 sq.m
1032 (1)a Painting Works (Masonry/Concrete) 36.15 sq.m
1046 (1) a1 Masonry Works 15.12 sq.m
1047(1) Metal Structures 1.00 Ls
SPL I Letterings 1.00 Ls
TOTAL BID AMOUNT (in figures): Php TOTAL BID AMOUNT (in words): Pesos
Note: The Bill of Quantities (BOQ) contains the following parts:
a. BOQ for each Part of the Contract.
b. Summary of Bid Prices for all Parts of the Contract.
Project Duration: 27 calendar days