• Tidak ada hasil yang ditemukan

CAGAYAN DE ORO CITY

N/A
N/A
Protected

Academic year: 2023

Membagikan "CAGAYAN DE ORO CITY "

Copied!
8
0
0

Teks penuh

(1)

CHALLENGE ON MUNICIPAL SOLID WASTE MANAGEMENT IN CAGAYAN DE

ORO CITY

(focus on landfill)‏

Tessie M. Machado June 27, 2012

Mulberry Suites, Cagayan de Oro City

   

PCIEERD-DOST

      DOST 10

(2)

CAGAYAN DE ORO CITY

l  1ST Class City - Highly Urbanized City

l  Area – 488.86 square kilometers

l  Composed of eighty (80) barangays

l  = 40 urban barangays

l  = 40 urban barangays

l  Total household- 120,418 as of Dec. 2011

PCIEERD-DOST

DOST 10

(3)

SOLID WASTE MANAGEMENT PRACTICES

l  Using a controlled dump site

l  Located at Upper Dagong, Carmen, Cagayan de oro City

l  Approximately 3.5 kilometers from city proper

l  Covers 17 hectares

l  = total landfill bed- more or less 8 hectares

l  = estimated capacity of 1.9 million cubic meters

l  = life span is 12-25 years

PCIEERD-DOST

DOST 10

(4)

Total volume collected -700 cubic meters/day

l  Barangay being served – 80% of the total barangays of CdeO city

l  = 40 urban barangay

l  = all coastal brgys- Bugo to Iponan

l  = hinterland brgys – Indahag & Lumbia

l  3 big markets - Cogon, Puerto & Carmen

l  Malls – Gaisano, (Cogon, Carmen & Bulua)

Ororama , Savemore/Market city, Limketkai, SM

l  Various colleges, universities & other private / public schools

PCIEERD-DOST

DOST 10

(5)

Solid Waste Management practices

l  Collection services/facilities

l  = Barangay collection

l  = Private establishment (for malls)‏

l  = City Collection

l  = Basura at iba Pa (contract)‏

PCIEERD-DOST

DOST 10

(6)

Waste segregation in the city is not 100 percent practiced

l  Out of 700 cubic meters “basura”

l  = 30% recyclable

l  = 45% biodegrable

l  = 25 % residual

l  Waste segration is undertaken by the

organized waste segregators on site (as livelihood)‏

l  So, per record, since CY 1993 to December

2011, the total volume of garbage disposed at the city dumpsite was 3,562,491 cu.m. (19 yrs

PCIEERD-DOST

DOST 10

(7)

Plan of the City/challenges

l  Establish Sanitary landfill at Pagatpat,

Cagayan de Oro City (upper portion) for residual only

l  Continous information drive on the

implementation of waste segregation by barangay

l  Establish Material Recovery Facility (MRF) by barangay

l  To reduce the collected wastes by 25 % yearly

l  To minimize emission of methane, if not zero

PCIEERD-DOST

DOST 10

(8)

Thank you !

“God bless Us All”

l 

PCIEERD-DOST

DOST 10

Referensi

Dokumen terkait

Figure 2: Tasman District Council Organisation Structure Engineering Manager Infrastructure Asset Management Water Supplies Wastewater Systems Refuse/Solid Waste Stormwater