• Tidak ada hasil yang ditemukan

Citizen's Charter No. SSB/ESD-03 Name of Office - NAMRIA

N/A
N/A
Protected

Academic year: 2023

Membagikan "Citizen's Charter No. SSB/ESD-03 Name of Office - NAMRIA"

Copied!
3
0
0

Teks penuh

(1)

Citizen’s Charter No. SSB/ESD-03

Name of Office : Instrumentation and Communication Section, Engineering Services Division, Support Services Branch (SSB) National Mapping and Resource Information Authority

Frontline Service : Repair of Instrumentation and Communication Equipment Schedule of Availability of Service : Monday – Friday, 8:00 AM – 5:00 PM

Who May Avail of the Service : Internal Clients How to Avail of the Service : Walk In, Phone In

No.

[A]

CUSTOMER ACTIVTY [B]

NAMRIA ACTION [C]

OFFICE/PERSON RESPONSIBLE/

LOCATION [D]

DURATION [E]

DOCUMENTARY REQUIREMENTS

[F]

AMOUNT OF FEES

[G]

1 Request repair

Fill out and submit the Client Request Form (CRF) to the receiving clerk

Receive and endorse the filled- out CRF to the concerned unit

VANESSA C. BOOL Data Processor II

1 minute

Client Request Form

Perform inspection and diagnostic procedure of the instrumentation and communication equipment Prepare pre-TIR

LORETO GEALONE ENGR. III

1 hour

Equipment Warranty Certificate, Operations

Manual

Technical Inspection Report (TIR)

Approve pre-TIR

VIRGILIO N. PANGA Engineer V

1 minute

TIR

(2)

Notify the end user if the equipment is under warranty, need to be repaired outside, or need to replaced

LORETO G. GEALONE Engineer III

1 minute

Prepare PR and cost estimate of the parts of the

instrumentation and

communication equipment 2 hours

Purchase Request (PR)

Review the specifications of the equipment listed in the PR and endorse the document to the SSB Director

VIRGILIO N. PANGA Engineer V

5 minutes

PR TIR

Record and release the PR to the Office of the SSB Director

VANESSA C. BOOL Data Processor II

10 minutes

Repair the instrumentation and communication equipment Prepare post-TIR

DELIO P. RADAM Electronics and Communication Equipment

Technician III

16 hours

TIR

(3)

Certify that the equipment is in good running condition

RAMON R. VILLANUEVA Engineer IV

10 minutes

Equipment Operations Manual

TIR

Approve post-TIR

VIRGILIO N. PANGA Engineer V

1 minute

TIR

2 Acknowledge/sign the TIR and fill out the client feedback portion of the TIR and the Client Acceptance portion of the CRF

Record client feedback

VANESSA C. BOOL Data Processor II

1 minute

TIR CRF

Total Duration:

2 days, 3 hours &

30 minutes

Referensi

Dokumen terkait

Question: 3 Senator Kristina Keneally: In addition to the Assistance and Access Act, what additional, specific FTE requirements does the Ombudsman have in relation to the oversight

MATERIALS AND METHODS The effects of temperature on the duration and survival of egg, larval and pupal stages, adult female weight and fecundity, and reproductive potential were