• Tidak ada hasil yang ditemukan

Supply, Delivery and Installation of Psychology Laboratory Supplies, Materials and Equipment – 2nd Negotiated Procurement – Cavite State University

N/A
N/A
Protected

Academic year: 2023

Membagikan "Supply, Delivery and Installation of Psychology Laboratory Supplies, Materials and Equipment – 2nd Negotiated Procurement – Cavite State University"

Copied!
2
0
0

Teks penuh

(1)

V01-2018-06-14 ADMN-QF-09

Republic of the Philippines

CAVITE STATE UNIVERSITY

Don Severino delas Alas Campus Indang, Cavite

BILL OF QUANTITIES

NAME OF PROJECT: IMRPOVEMENT OF PSYCHOLOGY LABORATORY ROOMS

ABC: ₱385,124.58 Bill of Quantities

COLLEGE/UNIT/CAMPUS: CvSU-BACOOR CAMPUS Item

No. Description Unit Quantity Unit Price

(Pesos)

Amount (Pesos)

I

MOBILIZATION

(Pesos _______________________

_____________________________

_____________________________

and _________________ centavos)

II

DISMANTLING WORKS

(Pesos _______________________

_____________________________

_____________________________

and _________________ centavos)

III

IMRPROVEMENT OF

PSYCHOLOGY LAB ROOMS (Pesos _______________________

_____________________________

_____________________________

and _________________ centavos)

GRAND TOTAL ___________

Write grand total in words

________________________________________

________________________________________

________________________________________

Submitted by: Date: ______________

Name of Bidder/Bidder’s Representative: ____________________________________________

Position: ___________________________________________________________________

Construction Company/Contractor: __________________________________________________

(2)

V01-2018-06-14

A. IMRPOVEMENT OF PSYCHOLOGY LABORATORY ROOMS 1. The project must be finished in 25 working days.

2. Actual site inspection is a must.

3. The area should be cleared before and after the construction work at least twelve meters away from the job site. Unusable formworks, excessive soil fill and all other unwanted debris of installation works should be disposed properly.

B. TECHNICAL DESCRIPTION I. Mobilization

1. Provide the following:

- Billboard

- Bankhouse with office - Temporary comfort rooms - Site enclosure

II. Dismantling Works

1. This work includes dismantling of existing room materials.

2. The area should be cleared before and after the construction work at least six meters away from the building. Unusable used roofing materials should be disposed properly.

3. Consult the end-user or project inspector for the other scope and technical details of the project.

III. Improvement of Psychology Laboratory Rooms

1. This work includes the supply and installation of all necessary materials and components for the rehabilitation of Criminology Laboratory

2. Provide all the materials needed for the rehabilitation of Criminology Laboratory

3. Installation of other parts of Criminology Laboratory

4. Consult the end-user or project inspector for the other scope and technical details of the project.

Referensi

Dokumen terkait

Republic of the Philippines CAVITE STATE UNIVERSITY Don Severino de las Alas Campus Indang, Cavite, Philippines INVITATION TO SUBMIT QUOTATION Supply and Delivery of Aircondition

Republic of the Philippines CAVITE STATE UNIVERSITY Don Severino de las Alas Campus Indang, Cavite, Philippines INVITATION TO SUBMIT PROPOSAL Supply and Delivery of Furniture and