ALL JOINTS SHALL BE CONNECTED BY 6-mm GUSSET PLATE AND EACH

N/A
N/A
Protected

Academic year: 2023

Membagikan "ALL JOINTS SHALL BE CONNECTED BY 6-mm GUSSET PLATE AND EACH"

Copied!
1
0
0

Teks penuh

(1)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

A

B

C

D

T - 1 T - 1 T - 1 T - 4 T - 4 T - 1 T - 1 T - 1T - 2

T - 3 T - 3

T - 2 T - 2 T - 2 T - 2 T - 2 T - 2

USE 2" x 4" x 1.5mm C- PURLINS SPACED @ 600mm O.C.

NOTE:

1. PROVIDE 10mm SAG ROD AT MIDPOINT EACH SPAN

2. PROVIDE TURN BUCKLE

CONNECTING TOP CHORD OF TRUSS TO TOP OF COLUMN (BOTH SIDES) UNDER GRID LINE B.

3. ALL JOINTS SHALL BE CONNECTED BY 6-mm GUSSET PLATE AND

EACH.

4. MEMBER SHALL BE WELDED ON THE PLATE WITH 4-mm WELD THROAT USING E70XX

ELECTRODE WITH A MINIMUM WELD LENGTH OF 100mm FOR EACH ANGLE.

WP

16mm Ø A.Bolt Plate Washer for 16mm Bolt

1

4" (6mm) Thick A36 Gusset Plate

5

8" (16mm) Thick A 36 Base Plate (Attached also with Structual Grout)

16mm Ø Anchor Bolt with Washer

6mm Thick Gusset Plate 16mm Thick

A36 B.PL.

CONCRETE COLUMN

CONCRETE COLUMN

ELEVATION

SECTION

Apply Structural Grout

(Beneath the Base Plate and in all edges)

WP

TOP CHORD

WEB MEMBER 6mm THICK

A36 G. PL.

BATAAN PENINSULA STATE UNIVERSITY

TECHNICAL WORKING GROUP FOR INFRASTRUCTURE

DINALUPIHAN CAMPUS

UNIVERSITY PRESIDENT

DR. GREGORIO J. RODIS

VICE PRESIDENT ADMIN. & FINANCE

DR. EDMUNDO C. TUNGOL

APPROVED BY:

RECOMMENDED BY:

REVISION

NO.

2

DESCRIPTION DATE

SHEET CONTENT:

LOCATION:

AR. ROXETTE S. UMEREZ

PREPARED BY:

REVIEWED BY:

PROJECT TITLE:

DIRECTOR OF PPES

ENGR. ALFREDO D. VALENTOS

NOTED BY:

SHEET NUMBER:

BATAAN PENINSULA STATE UNIVERSITY,

REPAIR & REHABILITATION OF ACADEMIC BLDG. II AT DINA-

LUPIHAN CAMPUS

CAMPUS DIRECTOR

MR. BILLY ALIPIO

1

S-DC-05 ROOF FRAMING PLAN

TRUSS CONNECTION DETAIL

Referensi

Dokumen terkait

Gambar 3.1 menunjukkan produk jelly drink kelor dengan berbagai perlakuan, sedangkan skoring untuk menentukan perlakuan terbaik berdasarkan parameter fisik dan sensoris dapat dilihat

 A 100mm ferricrete layer shall be placed on top of prepared hardstand and compacted with a smooth drum roller..  0.5m high ferricrete bunds shall be placed around the perimeter of