,
Date: 05 September 2022 Reference: HD 439/22 Subject: NAVPHIL.INFORMATION No. of Pages: 1
NAVPHIL 256/22 LUZON, W. COAST
MANILA BAY AND LUZON SEA CHART 1501
1. DREDGING AND LAND RECLAMATION WORKS IN PROGRESS UNTIL 10 MAR 2023 IN AREAS BOUNDED BY:
A 14-44-46N 120-50-14E B 14-42-49N 120-53-52E C 14-42-28N 120-53-44E D 14-37-22N 120-45-41E E 14-37-34N 120-45-25E F 14-45-03N 120-48-06E A 14-27-09N 120-43-23E B 14-29-06N 120-52-13E C 14-26-52N 120-51-47E D 14-20-38N 120-45-40E E 14-20-47N 120-43-28E F 14-20-46N 120-41-03E G 14-26-42N 120-46-07E H 14-26-39N 120-43-23E
A 14-20-00N 120-00-00E DISPOSAL AREA 2. THIS CANCELS NAVPHIL 225/22.
3. CANCEL THIS MSG 11 MAR 2023.
Please e-mail [email protected] if any part of this message is not received
ALL SHIPS/WATERCRAFTS TRANSITING THE VICINITY OF THE ABOVE- MENTIONED AREAS ARE ADVISED TO TAKE NOTE OF THE INFORMATION AND TAKE NECESSARY PRECAUTIONARY MEASURES AT ALL TIMES.
ANTONIO G VALENZUELA JR Captain, NAMRIA
Officer-in-Charge, Hydrography Branch Republic of the Philippines
Department of Environment and Natural Resources
NATIONAL MAPPING AND RESOURCE INFORMATION AUTHORITY www.namria.gov.ph