Work Duration: 60 Calendar Days Location: URS Taytay Campus, Taytay Rizal ABC Php 254,430.56
Unit Item Description Quantity
Materials Labor Materials Labor
pc(s) Coco lumber 20 P
cubic meter(m
³) White Sand 2
pc(s) PVC Pipe #4 2
bag(s) Tile Grout 5
pc(s) 30x60 Tiles Glazed 150
pc(s) Plywood Ordinary 1/4 3
cubic meter(m
³) Gravel 3/4 2
lot(s) Excavation of Septictank 1
set(s) Water Closets w/ Fittings 1
pc(s) 30x30 Tiles Unglazed 50
kilo(s) C.W Nail #2 1
pc(s) PVC Pipe #2 2
pc(s) Corr.Bar 10mm 35
pc(s) CHB #4 400
set(s) Lavatory w/ Fittings 1
bag(s) Tile Adhesive 5
bag(s) Cement 30
pc(s) PPR Tee 1/2 2
pc(s) Baby Roller #4 2
gallon(s
) Flat Latex 1
pc(s) Pin Light 9watts 2
pc(s) Door Knob 1
pc(s) PVC Tee #4 4
pc(s) PPR Coupling 2
pc(s) PPR Pipe 1/2 2
box(es)
Wire THHN # 12 1
gallon(s
) Gloss Latex 3
pc(s) Door Hinges 3x3 3
pc(s) PVC Clean out #4 4
pc(s) PPR Elbow 1/2 4
pc(s) Paint Brush #2 2
bag(s) Skimcoat 5
set(s) CR Divider Aluminum w/smoke glass 1
set(s) Door Jamb and Flush Door 1
pc(s) PVC P Trap#2 2
pc(s) Hardiflex 1/4 3
pc(s) Junction Box 3
gallon(s
) Flatwall Enamel 1
pc(s) Metal Purring 10
pc(s) Single Switch 2
gallon(s
) Boysen QDE 1
pc(s) C Chanel 5
roll(s) Electrical Tape (Big) 2
pc(s) Utility Box 3
box(es) Blind Rivets 1
*** nothing follows ***
Direct Cost PROFIT OCM VAT
UNIVERSITY OF RIZAL SYSTEM Project Title: Construction of Comfort Rooms at Director's Office
BILL OF QUANTITIES
(Agency)
Total Cost
Unit Cost Cost
TOTAL