• Tidak ada hasil yang ditemukan

rDfKE Of nbl(W

N/A
N/A
Protected

Academic year: 2023

Membagikan "rDfKE Of nbl(W"

Copied!
1
0
0

Teks penuh

(1)

W

Republic of the Philippines

IGLINGA gTATE

U

NIYERgITY OFFICE OF THE UN'YERSIW PRESIDENT

Nationol Highwoy, Purok 5, Bulonao, Tabuk City, Kolingo

Websrte; http://k_u.edu.ph Emil: [email protected] c,,ntrtNo.: 0917{22{145

rDfKE Of nbl(W

April 3,2017

ARSENIO S. LUA Proprietor

MCPC BUILDERS AND DEVELOPERS

Provi ncla I Road, Magsaysay, Ta bu k City, Ka I i nga

Dear Sir:

We are happy

to

notifl/ you

that the

'Construction

of Colap

Dayeare Center

Building"

is her,eby awarded to you as the Bidder with the Single Lowest Calculated Responsive Bid at a Contract Price equivalent

to

Four Hundred Sixty-two Thousand, Nine Hundred Fifty-eight Philippine Pesos and Thirteen Centavos (Php 462,958. I 3).

You are therefore required

within

ten (10)calendar days from

the

receipt of this Notice,

to

formally enter

into

contract

with

us, and

to

submit

the

Performance Security in the form and

the

amount stipulated

in the

lnstructions

to

Bidders. Failure

to enter into the

said contract

or

provide the Performance Security shall constitute a sufficient ground for cancellation of this award and forfeiture of your Bid Security.

Please affix your signature in space provided below as an indication of your acceptance of the award.

CPA, DBM

Conforme:

Referensi

Dokumen terkait

A bidder may opt to submit their bid envelope before the bid opening at the BAC Office, Administration Building, KSU-Main Campus, National Highway, Purok 6, Bulanao, Tabuk City, Kalinga