• Tidak ada hasil yang ditemukan

SUPPLEMENTAL BID BULLETIN No. 001-2021 SUBJECT

N/A
N/A
Protected

Academic year: 2023

Membagikan "SUPPLEMENTAL BID BULLETIN No. 001-2021 SUBJECT"

Copied!
1
0
0

Teks penuh

(1)

PHILIPPINE HEART CENTER East Avenue, Quezon City

SU PPLEM EN TA L BID BU LLETIN No. 001-2021 SUBJECT : Revisión in the Bidding Document

PROJECT/S : 1 Lot 20 units 12 Channel ECG with ECG Management System - ITB No, 008-21

To ensure that the transactions are comparatively advantageous to the interests o f the PHC, the originally pre- issued bidding documents as mentioned above, revisions are hereby introduced:

Item No./

Page No.

PHC - Technical Specifícations FROM

Clarifications/Modifications (Shouid be read as) TO

Seheduleof Opening of Bids on February 16, 2021 Re-set on February 23,2021,9:00 Am, 5F, Amphitheater P ag e10 Invitation toB id

Item 2- Delivery Period - 30 c.d. Item 2- Delivery Period - 90 c.d.

Page 22 Bid Data Sheet

ITB Clause 5.3 - For this purpose, Contract similar toheProject shallbe:

a. 1 irnit Video Conferencing System (Virtual OR Mobile System)

ITB Clause 5.3 - For this purpose, Contract similar to he Project shall be: any hospital or /medical equipment

Page 38

3.2. ECG Management System

3.2. a Compatihlc with existing PHC ECG machines (Philips Page WriterTC20)

3.2.a Compatible with existing PHC ECG machines

Page 39 Standard, Safety and Training For Inclusión:

7.6. Quarterly preventive maintenance and calibration for 3 yrs.

Page 41 Checklist of Technical & Financial Documents Class "A’’ Document

1. Legal Documents

2. Technical Documents _____í_____________________________________________

3. Financial Documents Page 42 Class “B” Documents

m. Joint Venture Agreement (JVA)

Note: For those compames who availed the pre-screening of the eligibility and technical requirements (pages 41 and 42) and satisfactorily complied all the requirements, BAC will issue a Certifícate of Simplified Supplier's Registration (CSSR). These requirements need not have to submit on the Bid Opening Date.

Henee, the issued CSSR will be submitted during the Opening of the Bids in lieu of the requirements on Pages 41 and 42.

This Supplemental Bid Bulletin is hereby issued to modify the original parameters as stated therein. All other requirements previously stated on the bid documents must be complied.

Please be guided accordingly.

Approved. Done this 8* day crf>February 2021, BAC Office, PHC.

MARIETTÁ

A/\4Msg

O, RN, MAN

Chairman, BAC for Pharma Supplies and Med Equipment

Referensi

Dokumen terkait

Article ID: OJED-17-01-027 Article Info: Received 20 February, 2017; Revised 9 February, 2021; Accepted 9 February, 2021 ผลการสอนรายวิชาปรับพื้นฐานการอ่านภาษาอังกฤษด้วยหลักการสอนแบบ 5

Also, the advantages of energy monitoring in a commercial building is explained by introducing the calculations of some of the factors like load factor, current unbalance factor, rise