• Tidak ada hasil yang ditemukan

TOTAL CONSTRUCTION COST:

N/A
N/A
Protected

Academic year: 2023

Membagikan "TOTAL CONSTRUCTION COST:"

Copied!
1
0
0

Teks penuh

(1)

I.

pcs.

kg cu.m

days days

days

Foreman days

Skilled days

Labor days

II.

O.C.M (6%) =

Profit (8%) =

VAT (7%) =

Total Indirect Cost:

TOTAL CONSTRUCTION COST:

VAT Component – shall be 7% of the sum of the EDC, OCM and Profit. The following items shall not be subjected to OCM and Profit mark-up:

a.1. Mobilization and demobilization a.2. Provision of Service Vehicle

0.00 0.00

TOTAL COST 0.00

Indirect Cost

0.00 0.00

Total Direct Cost:

Project Engineer/ Architect

sub-total sub-total

c. Labor Cost:

sub-total

b. Equipments A. WORK ITEM

Direct Cost a. Materials:

Project Name: Completion of Road Network and Drainage System at BPSU Main Campus Location : Bataan Peninsula State University, Main Campus

DETAILED ESTIMATES

ITEM OF WORK UNIT QNTY. UNIT COST AMOUNT

BATAAN PENINSULA STATE UNIVERSITY

Technical Working Group for Infrastructure Projects

BPSU Main Campus, Capitol Compound City of Balanga 2100 Bataan, PHILIPPINES

PREPARED BY:

Page 1 of 1

Referensi

Dokumen terkait

BATAAN PENINSULA STATE UNIVERSITY City of Balanga 2100 Bataan PHILIPPINES CHECK DISBURSEMENT RECORD LBP-RETAINED INCOME Disbursemen March 1-31, 2015 MARIELLE

BATAAN PENINSULA STATE UNIVERSITY City of Balanga 2100 Bataan PHILIPPINES CHECK DISBURSEMENT RECORD Sheet: Bank Name: LandBank of the Phils.. TANEGA Cashier III