• Tidak ada hasil yang ditemukan

Total Direct Cost AS SUBMITTED - - 2

N/A
N/A
Protected

Academic year: 2023

Membagikan "Total Direct Cost AS SUBMITTED - - 2"

Copied!
1
0
0

Teks penuh

(1)

Republic of the Philippines

: Appropriation :

Source of Fund :

: Target Start Date :

: Total Project Duration :

Project Description :

MOBILIZATION/DEMOBILIZATION

SQ.M -

LOT -

BREAKDOWN OF EXPENDITURES:

LEYTE NORMAL UNIVERSITY Tacloban City

PROGRAM OF WORKS/BUDGET COST

Project MINOR REPAIR OF THE COLLEGE BUILDING -

Project ID

AS SUBMITTED AS EVALUATED

Location Leyte Normal University, Paterno St., Youngfield Area, Tacloban City 35 C.D.

MINOR REPAIR OF THE COLLEGE BUILDING

DESCRIPTION OF WORKS TO BE DONE QUANTITY UNIT

Project Component ID PROJECT COMPONENT DESCRIPTION

% TOTAL TOTAL DIRECT COST % TOTAL TOTAL DIRECT COST

-

I 1.00 LOT -

III

PAINTING WORKS

1.00 LOT -

II CEILING WORKS 1.00 LOT

IV

V Safety

AS EVALUATED AS SUBMITTED

Total - EQUIPMENT:

DESCRIPTION REQUIRED AS EVALUATED

1. Labor - A. Total Direct Cost

AS SUBMITTED - -

2. Materials - B. OCM and Profit -

4. Provisional Sum / Daywork D. Total Construction Cost

3. Rental of Equipment - C. Value Added Tax (5%)

F. RROW Acquisition

(PLS. SEE FORM POW-2015-01B-00) 5. OCM and Profit E. Eng'g & Administrative Overhead, 1%

7. EAO, 1% G. Physical Reserved (Contingency)

- 8. RROW Acquisition

10.TOTAL ESTIMATED COST - H. TOTAL ESTIMATED COST 9. Physical Reserved (Contingency)

SCAFFOLDING

1790.5 1

6. Value Added Tax (5%)

Referensi

Dokumen terkait

4~ THE ANTE‑NICENE ground of mercy and grace, " heavenly grace, " and the like, to the child, while on the other hand he speaks of the refusal of baptism to infants as that which

February 27, 2015 Venue: Ascot Hall, B2F South Wing, Hotel Okura Tokyo PartⅠ: “Challenges Facing the Liberal International Order and Japan’s Role” 09:30- Registration