The study of barriers and bridges in supply chain management to improve procurement process in Bangkok chain hospital plc.

N/A
N/A
Nguyễn Gia Hào

Academic year: 2023

Membagikan "The study of barriers and bridges in supply chain management to improve procurement process in Bangkok chain hospital plc."

Copied!
143
0
0

Teks penuh

STUDY OF BARRIERS AND BRIDGES IN SUPPLY CHAIN ​​MANAGEMENT FOR PROCUREMENT PROCESS IMPROVEMENT IN. STUDY OF BARRIERS AND BRIDGES IN SUPPLY CHAIN ​​MANAGEMENT FOR PROCUREMENT PROCESS IMPROVEMENT IN BANGKOK CHAIN ​​HOSPITAL PLC.

Table              Page
Table Page

INTRODUCTION

  • Introduction
  • Supply chain management
  • Advantage of supply chain management
  • Statement of problem
  • Research Question
  • Objective of the study
  • Scope of the Research
  • Benefit
  • Definition
  • Limitation in this research

Some benefits of supply chain management can be divided into two categories; profit maximization and efficiency improvement. Therefore, it is important to understand the barriers and bridges to effective supply chain management implementation.

Figure 1.2 Health care logistic process  Source : Muangshoo, et al. (2012).
Figure 1.2 Health care logistic process Source : Muangshoo, et al. (2012).

LITERATURE REVIEW

  • Supply Chain and Supply Chain Management
    • Definition of Supply Chain and Supply Chain Management Supply Chain
  • SCM strategic adoption within organization
    • Organization structure and culture
    • Strong organizational network building and maintaining
  • Healthcare Organization and supply Chain management
    • Nodes & Links management
    • Material Management
    • Information Management
  • Barrier of supply chain collaboration
    • Barrier at Problem in SCM framework
    • Barrier at top management and organization level
    • Barrier at Misalignment among SCM member
    • Barrier from organizational control
    • Lack of support from an organization
  • Conceptual Theory of Bridge of supply chain collaboration
    • Level of trust
    • Information system
    • People management(communication)
    • Information Transparency
    • Perception management
    • Leadership at all level
    • Alliance design
    • Performance Measurement
    • Customer (Patient) management
    • Collaborative Planning
  • Conceptual Framework of Supply Chain Implementation within an Organization
  • Research Hypotheses
  • Leadership
  • People Management (Communication)
  • Performance Measurement 5. Information Transparency
  • People Management (Communiton)

The corporate culture and its compatibility with the supply chain also facilitates the implementation of supply chain management. An obstacle may lie in the complexity of the supply chain management system, which leads to difficulties in implementing a framework.

Figure  2.1  Conceptual  frameworks  of  understanding  supply  chain  implementation within an organization
Figure 2.1 Conceptual frameworks of understanding supply chain implementation within an organization

RESEARCH METHODOLOGY

Research design

Sample Selection

Therefore, the size of the sample, according to the total of sample size, is 100 people which is equal to the total population size of this study.

Instrument & Measurement

  • Research Questionnaire

Part I: Personal factors which include information about demographic age, gender, status, education level, position, average income and work experience

  • Measurement
  • Reliability Analysis
  • Data Collection
  • Data analysis

This research study aims to find perspective on the preference that facilitates a supply chain collaboration and perspective on the preference that hinders the implementation of supply chain implementation in Bangkok Hospital Chain Public Limited Company. Paired T-test model to study the differences in the means between the different factors in this research paper, which are the perception of the current and desired level towards each of the implementation of the bridge components from the perspective of the administrators in the procurement department in the Hospital Chain of Bangkok, PCL.

DATA ANALYSIS AND RESULTS

Respondent Profiles for all procurement staffs in Bangkok Chain Hospital PCL

Respondent Profiles

Descriptive Statistic

  • Barriers of supply chain management implementation in procurement process
  • Current level of implementation of bridge to improve supply chain collaboration

The first is leadership, which has an average score of 3.12 points out of 5 points, which is a neutral level. In second place is people management (communication), which has an average score of 3.1 points out of 5 points, which is a neutral level.

Table 4.9 Summary of current level of implementation of bridge Descriptive Statistics
Table 4.9 Summary of current level of implementation of bridge Descriptive Statistics

The quantitative analysis

  • Reliability and validity testing
  • Hypotheses testing

The mean difference was 0.76 points between the two 5-point Likert ratings for current and desired level of establishing a long-term relationship with supplier. The mean difference was 0.85 points between the two 5-point Likert ratings for current and desired level of establishing a long-term relationship with supplier. The mean difference was 0.64 points between the two 5-point Likert ratings for current and desired level of Information exchange between BCH and trading partners should be timely.

The mean difference was 0.65 points between the two 5-point Likert ratings for current and desired level of Information exchange between BCH and trading partners should be accurate. The average difference was 0.65 points between the two 5-point Likert ratings for current and desired level of Information exchange between BCH and trading partners should be complete. The mean difference was 0.64 points between the two 5-point Likert ratings for current and desired level of Information exchange between BCH and trading partners should be sufficient.

The average difference was 0.62 points between the two 5-point Likert ratings for the current and desired level of information exchange between BCH and trading partners should be reliable. The average difference was 0.65 points between the two 5-point Likert ratings for the current and desired level of perception about the complexity of the supply chain implementation to be created. The average difference was 0.69 points between the two 5-point Likert ratings for current and desired performance levels within the supplier organization.

The mean difference was 0.67 points between the two 5-point Likert ratings for current and desired level of determination future customer expectation. The mean difference was 0.65 points between the two 5-point Likert ratings for current and desired level of customer profile should be computerized in database.

Table 4.10 Reliability testing
Table 4.10 Reliability testing

Discussions, Conclusion and Recommendation

Conclusions and Discussion

  • Barrier in Supply Chain Management
  • Bridges in Supply Chain Management
  • Perception of the desired and current level of implemented SCM bridges

All the above information are the three main bridges that BCH should focus on to improve the SCM process and system in the company based on the opinion of the staff working in the purchasing department. A reference to a trading partner must keep us informed of events or changes that may affect BCH, and the exchange of information between BCH and trading partners must be timely, accurate, complete, adequate and reliable. Refer to the level of a long-term relationship with the supplier and long-term contracts should be used for the main main products.

Refer to a perception on the relative advantage of the supply chain practice to be established, on the value compatibility of the supply chain to be established, and on the complexity of the supply chain implementation. There should be performance tracking within the supplier's organization, for example, receipt time, cycle time and lost time. Ranking from the largest gap to the smallest gap, the result shows that the average between the current level of implementation and the desired level of implementation of the bridge information system has the highest gap with 0.81 points which have the current level at 2.92 points, but all staff felt that the desired level should be 3.73 points out of 5 points.

As mentioned earlier for internal collaboration, BCH wants to be successful in SCM means that the waste in the internal process in BCH must be minimized and the waste comes from all departments and to improve SCM other departments must be involved and educated for the benefit from SCM. The sixth bridge that needs to be improved is performance measurement, to get the best outcome, the key indicator must first be clear, because all staff must understand what is the thing they need to achieve that they can focus without clear key indicator, they will don't know which aspect they need to improve. The perception of all personnel in the department of BCH procurement about the advantages and benefits of SCM must be created and observed.

Table 5.1 Summary of top 5 barriers
Table 5.1 Summary of top 5 barriers

Recommendation

  • Recommendation to overcome the current barrier in BCH’s Procurement Department
  • Recommendation to improve the current bridge in BCH’s Procurement Department

To get support for information technology resources, they need to determine the budget and seek approval from the director showing the importance of SCM, then all staffs will definitely get support. This helps a lot for a faster process, the researcher suggests to improve this only that the criteria should be reviewed every year for the appropriate of the responsibility of the staff. Monday to update all subjects for all staffs, but now the Line app comes to help and improve this bride a lot.

If any updates come, all staff will be updated timely and effectively and also all meeting minutes will be summarized by line for a clear communication system, then all staff will not be confused what to do after the meeting. BCH should have clear KPI of SCM to give to all staff but not just a clear KPI. Fifth bridge is information transparency; because BCH is a listed company, all information must be audited with a third-party company, but to improve this factor.

Eighth, level of trust, to improve the relationship with key supplier for key product is quite important. More about getting the trust of supplier, BCH should pay attention to the timely payment and order system should be adjusted to suit BCH and supplier. The last recommendation for alliance design, in this bridge, in order to improve the performance tracking within supplier organization, for example lead time, cycle time and time wastage and the evaluation, the formal and informal complaints of customers should be implemented and should be a regular evaluation.

Bibliography

34;An Empirical Comparison of Predictive and Response-Based Supply Chain Strategies." International Journal of Logistics Management. 34;Analysis of Barriers to Implementation of Green Supply Chain Management in Indian Industries Using Analytic Hierarchy Process ." International Journal of Production Economics 555-568. 34; The Relationship between Supply Chain Performance and the Degree of Supplier Linkage, Internal Integration, and Customer.” Supply Chain Management: An International Journal.

34;The Impact of Supply Chain Management Practices on Competitive Advantage and Organizational Performance." The International Journal of Management Science 107-124. 34;Effectively Managing Vertical Supply Relationships: A Risk Assessment Model for Outsourcing." Supply Chain Management: An International Journal. 34; The Distressed Healthcare Supply Chain: A Recipe for Change." The Journal of Supply Chain Management Winter: 4-17.

34;Analysis of interactions between reverse logistics barriers." International Journal of Technological Forecasting &. 34;Supply Chain Management: Supplier Performance and Firm Performance." International Journal of Purchasing and Materials Management Summer: 2-9. 34;'HEBBAN OLLA VOGALA NESTAS HAGUNNAN HINASE..': A CASE STUDY OF THE DYNAMICS OF A SUPPLY CHAIN ​​COLLABORATION SYSTEM IN THE PROCESS INDUSTRY." Operations Management as a Change Agent 619-628.

APPENDICES

To what extent do the following items act as current barriers in supply chain practice in procurement department in Bangkok Chain Hospital Plc

Please circle the appropriate number to indicate the level of importance of barriers to implementing supply chain practices in the ordering process at Bangkok Chain Hospital Plc. These item scales are five-point scales with 1 = very low level of importance, 2 = low level of importance, 3 = moderate level of importance, 4 = high level of importance, 5 = very high level of importance.

Employees' view of the current and desired level of bridging implementation to improve supply chain collaboration within Bangkok Chain Hospital Plc. Circle the appropriate number to indicate the extent to which the current level of supply chain management implementation links supply chain management and also the desired future level of implementation for the most useful bridge to facilitate the supply chain management system. For current level of implementation, item ratings are five-point scales with 1 = very low level of implementation, 2 = low level of implementation, 3 = moderate level of implementation, 4 = high level of implementation, 5 = very high level of implementation.

For desired level of future implementation, item ratings are five-point scales with 1 = very low level of facilitation, 2 = low level of facilitation, 3 = moderate level of facilitation, 4 = high level of facilitation, 5 = very high level of facilitation.

Appendix C

There should be an exchange of information that helps the establishment of business planning between trading partners and us. Real) Information exchange between BCH and trading partners must be accurate. exchange between BCH and trading partners must be completed.

Gambar

Figure 1.1 Number of hospital business and private hospital in 2012  Source: National Statistical Office (2003)
Figure 1.2 Health care logistic process  Source : Muangshoo, et al. (2012).
Figure  2.1  Conceptual  frameworks  of  understanding  supply  chain  implementation within an organization
Figure 2.2 Conceptual frameworks for studying a perception current and desired  bridges  in  supply  chain  management  to  improve  procurement  process  in  Bangkok Chain Hospital Plc (BCH)
+7

Referensi

Dokumen terkait

The Effect of Supply Chain Management Practices on Supply Chain Quality Integration Supply chain quality integration refers to the degree to which company synchronized and