• Tidak ada hasil yang ditemukan

Capstone Design Project Proposal Form (PPF)

N/A
N/A
Protected

Academic year: 2025

Membagikan "Capstone Design Project Proposal Form (PPF)"

Copied!
2
0
0

Teks penuh

(1)

Capstone_Design_PPF -16 Sep2013 16-09-2013

Capstone Design Project Proposal Form (PPF)

To be filled in by the main Supervisor of the project.

The project must be of a Capstone Design Project (CDP) involving at least three specialization of our civil engineering program in accordance with ABET requirements. At least three students will be assigned to the main supervisor to form a team work to accomplish the CDP. The main supervisor is totally responsible about supervising, monitoring and evaluating the students during their work in the project. Each team will be assigned two Associate supervisors who will help and guide the students in their respective specialization in separate meetings with the students. Capstone must be a designed based project, while research based and lab based projects will not be accepted.

The form content of the (PPF) is as follow:

1. Project Title:

title for the project (make it as short as possible)

2. Supervisor:

The name of main Supervisor. If the project is for a company please include that information.

3. Related Civil Engineering Specialties to the project:

mention the main and related specialties in the project.

Main Specialty

( the main supervisor’s specialty)

Related specialty # 1

Related specialty # 2

4. Associate Supervisors: please suggest at least two names for each related specialty in the Project. (Names will be suggested by the main supervisor).

Related specialty Suggested Associate Supervisors names

First choice Second choice

1- 2-

5. Background:

Brief explanation of the project, the needs, and motivations for this effort.

(2)

Capstone_Design_PPF -16 Sep2013 16-09-2013

6. Objectives :

State briefly the main objectives to be accomplished in the project

7. Required work in each specialty:

Briefly state for each specialty related to the project, the main required work to be accomplished to attain the above objectives.

Related specialty to the Project Main work required Main Specialty:

Related specialty # 1:

Related specialty # 2:

8. Project Requirements:

List all requirements necessary to carry out project (such as: No. of students, material, instrument, software, etc.). A brief specific detail should also be given.

9. Deliverables:

Indicate the desired deliverables outcomes of the project.

10. Project Realistic Constraints:

Briefly state which realistic constraints will be addressed (social, economical, health and safety, manufacturability, sustainability, environmental, political and ethical constraints).

Main Supervisor Signature:

Date: ………

Note: the PPF can be emailed directly to Prof. Dr. Abdulrahman Al Suhaibani ([email protected])

Referensi

Dokumen terkait

The DREAM model and the HALP procedure will be used to detemine the levels of changes at each stage which will allow decision makers to attain the objectives while satisfying

a success and how exactly you intend to make it a success is touched upon in this section of the project report sample.. The objectives of the project, what you intend to achieve

 Cost budgeting involves allocating the project cost estimate to individual work items over time.  The WBS is a required input to the cost budgeting process since it defines

1.3 Objectives of the Study Related to the statements of the problems formulated above, the objectives of this research are: 1.3.1 To describe the types of error that occur in

Section 3: Specific Comments by the Reviewer for the author  The reviewer are required to identify and comment on strengths and weaknesses of the manuscript in terms of each of the 7

4.0 ECONOMIC PERFORMANCE OF THE MODEL SHIPS Considering 30 years life time, required freight rate RFR, that is, minimum freight charge required to attain 12% rate of return on

 The students are expected to discuss their progress of project work with their respective advisors during weekly scheduled meetings  Minutes of team meetings are required to be

Advantages and disadvantages of respiratory drug delivery Advantages ■ Respiratory drug delivery ensures that the required dose of drug is delivered to the site of action 181