Electricity Demand Side Management Grant

Total EDSM

80333125 Shedule 6

Allocation 14 000 5 000 144 000 45 000 12 000 - 20 000 - 40 000 280 000 Check - - - - - - - - - 0

R'000 R'000 R'000 R'000 R'000 R'000 R'000 R'000 R'000 R'000

Date Day EC FS GT KZ LP MP NC NW WC Total per province

05 September 2011 Monday - - - - 06 September 2011 Tuesday - - - - 07 September 2011 Wednesday - - - - 08 September 2011 Thursday - - - - 09 September 2011 Friday - - - - TOTAL TOTAL - - - - - - - - - - 06 October 2011 Thursday - - - - 07 October 2011 Friday - - - - 28 October 2011 Friday - - - - 31 October 2011 Monday - - - - TOTAL TOTAL - - - - - - - - - - 07 November 2011 Monday - - - - 08 November 2011 Tuesday - - - - 09 November 2011 Wednesday - - - - 29 November 2011 Tuesday 3 000 3 000 27 000 9 000 3 000 - 10 000 - - 55 000 30 November 2011 Wednesday - - - - TOTAL TOTAL 3 000 3 000 27 000 9 000 3 000 - 10 000 - - 55 000 01 December 2011 Thursday - - - - 3 000 3 000 30 December 2011 Friday - - - - 31 December 2011 Saturday - - - - TOTAL TOTAL - - - - - - - - 3 000 3 000 01 February 2012 Wednesday - - - - 02 February 2012 Thursday - - - - 21 February 2012 Tuesday - - - - TOTAL TOTAL 1 000 2 000 60 000 16 000 6 000 - 10 000 - 20 000 115 000 12 March 2012 Monday - - - - 13 March 2012 Tuesday - - - - 14 March 2012 Wednesday 10 000 - 57 000 20 000 3 000 - - - 17 000 107 000 TOTAL 10 000 - 57 000 20 000 3 000 - - - 17 000 107 000

-

- - - -

GRAND TOTAL 14 000 5 000 144 000 45 000 12 000 - 20 000 - 40 000 280 000

Intergrated National Electrification Programme (Municipal) Grant

(2)

Summary: Local Government Payment Schedule for the 2011/12 financial year Electricity Demand Side Management Grant

Eastern Cape

Allocation 4 000 10 000 14 000

Check - - - - - - - - -

R'000 R'000 R'000 R'000 R'000 R'000 R'000 R'000 R'000

Date Day (BUF) Buffalo

City

(NMA) Nelson Mandela Bay

(DC 15) O.R.

Tambo District Municipality

(EC 441) Matatiele (EC 442)

Umzimvubu

(EC 443) Mbizana

(EC 152) Ntabankulu

(DC 44) Alfred Nzo District Municipality

Total per province

07 September 2011 Wednesday -

08 September 2011 Thursday -

TOTAL TOTAL - - - - - - - - -

06 October 2011 Thursday -

07 October 2011 Friday -

31 October 2011 Monday -

TOTAL TOTAL - - - - - - - - -

07 November 2011 Monday -

29 November 2011 Tuesday 3 000 3 000

30 November 2011 Wednesday -

TOTAL TOTAL 3 000 - - - - - - - 3 000

01 February 2012 Wednesday -

02 February 2012 Thursday -

21 February 2012 Tuesday -

22 February 2012 Wednesday 1 000 1 000

TOTAL TOTAL 1 000 - - - - - - - 1 000

12 March 2012 Monday -

13 March 2012 Tuesday -

14 March 2012 Wednesday 10 000 10 000

TOTAL - 10 000 - - - - - - 10 000 - GRAND TOTAL 4 000 10 000 - - - - - - 14 000

Intergrated National Electrification Programme (Municipal) Grant

(3)

Free State

Allocation 5 000 5 000

Check - - - - - - - - - - -

R'000 R'000 R'000 R'000 R'000 R'000 R'000 R'000 R'000 R'000

Date Day (MAN) Mangaung (FS 194) Maluti-a-

Phofung (FS 195) Phumelela (FS 196) Mantsopa

(DC 19) Thabo Mofutsanyana District

Municipality

(FS 201) Moqhaka (FS 203) Ngwathe (FS204) Metsimaholo (FS 205) Mafube (DC 20) Fezile Dabi

District Municipality Total per province

06 September 2011 Tuesday -

07 September 2011 Wednesday -

TOTAL TOTAL - - - - - - - - - - -

06 October 2011 Thursday -

07 October 2011 Friday -

31 October 2011 Monday -

TOTAL TOTAL - - - - - - - - - - -

07 November 2011 Monday -

08 November 2011 Tuesday -

29 November 2011 Tuesday 3 000 3 000

TOTAL TOTAL 3 000 - - - - - - - - - 3 000

01 February 2012 Wednesday -

02 February 2012 Thursday -

21 February 2012 Tuesday -

22 February 2012 Wednesday 2 000 2 000

TOTAL TOTAL 2 000 - - - - - - - - - 2 000

12 March 2012 Monday -

13 March 2012 Tuesday -

14 March 2012 Wednesday -

TOTAL - - - - - - - - - - - - GRAND TOTAL 5 000 - - - - - - - - - 5 000

Intergrated National Electrification Programme (Municipal) Grant

(4)

Summary: Local Government Payment Schedule for the 2011/12 financial year

Electricity Demand Side Management Grant

Gauteng

80333125 Shedule 6

Allocation 47 000 47 000 44 000 6 000 144 000

Check - - - - - - - - - -

R'000 R'000 R'000 R'000 R'000 R'000 R'000 R'000 R'000

Date Day (EKU)

Ekurhuleni

(JHB) City of Johannesburg

(TSH) City of

Tshwane (GT 421) Emfuleni (GT 422) Midvaal (GT 423) Lesedi (DC 42) Sedibeng

District Municipality

(GT 481) Mogale

City (GT 482) Randfontein Total per province

05 September 2011 Monday -

06 September 2011 Tuesday -

07 September 2011 Wednesday -

TOTAL TOTAL - - - - - - - - - -

06 October 2011 Thursday -

07 October 2011 Friday -

31 October 2011 Monday -

TOTAL TOTAL - - - - - - - - - -

07 November 2011 Monday -

08 November 2011 Tuesday -

29 November 2011 Tuesday 9 000 9 000 9 000 27 000

TOTAL TOTAL 9 000 9 000 9 000 - - - - - - 27 000

01 February 2012 Wednesday -

02 February 2012 Thursday -

21 February 2012 Tuesday -

22 February 2012 Wednesday 19 000 19 000 19 000 3 000 60 000

TOTAL TOTAL 19 000 19 000 19 000 3 000 - - - - - 60 000

12 March 2012 Monday -

13 March 2012 Tuesday -

14 March 2012 Wednesday 19 000 19 000 16 000 3 000 57 000

TOTAL 19 000 19 000 16 000 3 000 - - - - - 57 000 - GRAND TOTAL 47 000 47 000 44 000 6 000 - - - - - 144 000

Intergrated National Electrification Programme (Municipal) Grant

(5)

Electricity Demand Side Management Grant KwaZulu Natal

Allocation 45 000 - - 45 000

Check - - - - - - - - - -

R'000 R'000 R'000 R'000 R'000 R'000 R'000 R'000 R'000 R'000

Date Day (ETH) eThekwini (KZN 225) Msunduzi (KZN 232) Emnambithi

or Ladysmith (KZN 273) The

Big Five False Bay (KZN 274) Hlabisa (KZN 275) Mtubatuba (DC 27) Umkhanyakude

District Municipality (KZN 281) Mfolozi (KZN 282) uMhlathuze Total per province

07 September 2011 Wednesday -

08 September 2011 Thursday -

TOTAL TOTAL - - - - - - - - - -

06 October 2011 Thursday -

07 October 2011 Friday -

31 October 2011 Monday -

TOTAL TOTAL - - - - - - - - - -

07 November 2011 Monday -

29 November 2011 Tuesday 9 000 9 000

TOTAL TOTAL 9 000 - - - - - - - - 9 000

01 February 2012 Wednesday -

02 February 2012 Thursday -

21 February 2012 Tuesday -

22 February 2012 Wednesday 16 000 16 000

TOTAL TOTAL 16 000 - - - - - - - - 16 000

12 March 2012 Monday -

13 March 2012 Tuesday -

14 March 2012 Wednesday 20 000 20 000

TOTAL 20 000 - - - - - - - - 20 000 - GRAND TOTAL 45 000 - - - - - - - - 45 000

Intergrated National Electrification Programme (Municipal) Grant

(6)

Summary: Local Government Payment Schedule for the 2011/12 financial year Electricity Demand Side Management Grant

Limpopo

Allocation 12 000 12 000

Check - - - - - - - - -

R'000 R'000 R'000 R'000 R'000 R'000 R'000 R'001 R'000

Date Day (LIM 352)

Aganang (LIM 353) Molemole (LIM 354)

Polokwane

(LIM 355) Lepelle- Nkumpi

(DC 35) Capricorn District Municipality

(LIM 361) Thabazimbi

(LIM 475) Greater Tubatse

(DC 47) Greater Sekhukhune District Municipality

Total per province

06 September 2011 Tuesday -

07 September 2011 Wednesday -

TOTAL TOTAL - - - - - - - - -

07 October 2011 Friday -

31 October 2011 Monday -

TOTAL TOTAL - - - - - - - - -

07 November 2011 Monday -

29 November 2011 Tuesday 3 000 3 000

30 November 2011 Wednesday -

TOTAL TOTAL - - 3 000 - - - - - 3 000

01 February 2012 Wednesday -

02 February 2012 Thursday -

21 February 2012 Tuesday -

22 February 2012 Wednesday 6 000 6 000

TOTAL TOTAL - - 6 000 - - - - - 6 000

12 March 2012 Monday -

13 March 2012 Tuesday -

14 March 2012 Wednesday 3 000 3 000

TOTAL - - 3 000 - - - - - 3 000 - GRAND TOTAL - - 12 000 - - - - - 12 000

Intergrated National Electrification Programme (Municipal) Grant

(7)

Electricity Demand Side Management Grant Mpumalanga

Allocation - -

Check - - - - - - -

R'000 R'000 R'000 R'000 R'000 R'000 R'000

Date Day (MP 321) Thaba

Chweu (MP 322) Mbombela (MP 323) Umjindi (MP 324) Nkomazi (MP 325) Bushbuckridge(DC 32) Ehlanzeni

District Municipality Total per province

06 September 2011 Tuesday -

07 September 2011 Wednesday -

08 September 2011 Thursday -

TOTAL TOTAL - - - - - - -

06 October 2011 Thursday -

07 October 2011 Friday -

28 October 2011 Friday -

31 October 2011 Monday -

TOTAL TOTAL - - - - - - -

07 November 2011 Monday -

08 November 2011 Tuesday -

09 November 2011 Wednesday -

29 November 2011 Tuesday -

30 November 2011 Wednesday -

TOTAL TOTAL - - - - - - -

05 December 2011 Monday -

06 December 2011 Tuesday -

07 December 2011 Wednesday -

08 December 2011 Thursday -

TOTAL TOTAL - - - - - - -

25 January 2012 Wednesday -

26 January 2012 Thursday -

27 January 2012 Friday -

31 January 2012 Tuesday -

TOTAL TOTAL - - - - - - -

01 February 2012 Wednesday -

02 February 2012 Thursday -

03 February 2012 Friday -

29 February 2012 Wednesday -

TOTAL TOTAL - - - - - - -

12 March 2012 Monday -

13 March 2012 Tuesday -

14 March 2012 Wednesday -

TOTAL - - - - - - - - GRAND TOTAL - - - - - - -

Intergrated National Electrification Programme (Municipal) Grant

(8)

Electricity Demand Side Management Grant Northern Cape

Allocation 20 000 20 000

Check - - - - - - - - - - -

R'000 R'000 R'000 R'000 R'000 R'000 R'000 R'000 R'000 R'000 R'000

Date Day (NC 072)

Umsobomvu

(NC 091) Sol

Plaatjie (NC 092) Dikgatlong (NC 093) Magareng (NC 094) Phokwane

(DC 9) Frances Baard District

Municipality

(NC 451) Moshaweng (NC 452) Ga-

Segonyana (NC 453) Gamagara

(DC 45) John Taolo Gaetsewe District

Municipality

Total per province

06 September 2011 Tuesday -

07 September 2011 Wednesday -

08 September 2011 Thursday -

09 September 2011 Friday -

TOTAL TOTAL - - - - - - - - - - -

06 October 2011 Thursday -

07 October 2011 Friday -

28 October 2011 Friday -

31 October 2011 Monday -

TOTAL TOTAL - - - - - - - - - - -

07 November 2011 Monday -

08 November 2011 Tuesday -

09 November 2011 Wednesday -

29 November 2011 Tuesday 10 000 10 000

30 November 2011 Wednesday -

TOTAL TOTAL 10 000 - - - - - - - - - 10 000

01 February 2012 Wednesday -

02 February 2012 Thursday -

20 February 2012 Monday -

21 February 2012 Tuesday -

22 February 2012 Wednesday 10 000 10 000

TOTAL TOTAL 10 000 - - - - - - - - - 10 000

12 March 2012 Monday -

13 March 2012 Tuesday -

14 March 2012 Wednesday -

TOTAL - - - - - - - - - - - - GRAND TOTAL 20 000 - - - - - - - - - -

Intergrated National Electrification Programme (Municipal) Grant

(9)

Electricity Demand Side Management Grant

North West 80333125

Allocation - -

Check - - - - - - - - - -

R'000 R'000 R'000 R'000 R'000 R'000 R'000 R'000 R'000

Date Day (NW 373) Rustenburg (NW 396)

Lekwa-Teemane (NW 397)

(DC 39) Dr Ruth Segomotsi Mompati

District Municipality (NW 401) Ventersdorp (NW 402) Tlokwe (NW 403) City

of Matlosana (NW 404) Maquassi Hills

(DC 40) Dr Kenneth Kaunda

District Municipality Total per province

06 September 2011 Tuesday -

07 September 2011 Wednesday - -

08 September 2011 Thursday -

09 September 2011 Friday -

TOTAL TOTAL - - - - - - - - - -

07 November 2011 Monday - -

08 November 2011 Tuesday -

09 November 2011 Wednesday -

29 November 2011 Tuesday -

30 November 2011 Wednesday -

TOTAL TOTAL - - - - - - - - - -

01 February 2012 Wednesday -

02 February 2012 Thursday - -

03 February 2012 Friday -

29 February 2012 Wednesday -

TOTAL TOTAL - - - - - - - - - -

12 March 2012 Monday -

13 March 2012 Tuesday -

14 March 2012 Wednesday - -

TOTAL - - - - - - - - - - - GRAND TOTAL - - - - - - - - - -

Intergrated National Electrification Programme (Municipal) Grant

(10)

Summary: Local Government Payment Schedule for the 2011/12 financial year Electricity Demand Side Management Grant

Western Cape

Allocation 40 000 40 000

Check - - - - - - - - -

R'000 R'000 R'000 R'000 R'000 R'000 R'000 R'000 R'000

Date Day (CPT) City of

Cape Town (WC 041) Kannaland (WC 042) Hessequa (WC 043) Mossel

bay (WC 044) George (WC 047) Bitou (DC 4) Eden

District Municipality (WC 051) Laingsburg Total per province

06 September 2011 Tuesday -

07 September 2011 Wednesday -

08 September 2011 Thursday -

09 September 2011 Friday -

TOTAL TOTAL - - - - - - - - -

06 October 2011 Thursday -

07 October 2011 Friday -

28 October 2011 Friday -

31 October 2011 Monday -

TOTAL TOTAL - - - - - - - - -

07 November 2011 Monday -

08 November 2011 Tuesday -

09 November 2011 Wednesday -

29 November 2011 Tuesday -

30 November 2011 Wednesday -

TOTAL TOTAL - - - - - - - - -

01 December 2011 Thursday 3 000 3 000

07 December 2011 Wednesday -

08 December 2011 Thursday -

TOTAL TOTAL 3 000 - - - - - - - 3 000

25 January 2012 Wednesday -

26 January 2012 Thursday -

27 January 2012 Friday -

31 January 2012 Tuesday -

TOTAL TOTAL - - - - - - - - -

01 February 2012 Wednesday -

02 February 2012 Thursday -

21 February 2012 Tuesday -

22 February 2012 Wednesday 20 000 20 000

TOTAL TOTAL 20 000 - - - - - - - 20 000

12 March 2012 Monday -

13 March 2012 Tuesday -

14 March 2012 Wednesday 17 000 17 000

TOTAL 17 000 - - - - - - - 17 000 - GRAND TOTAL 40 000 - - - - - - - 40 000

Intergrated National Electrification Programme (Municipal) Grant

Referensi

Dokumen terkait

This management strategy could have particular value with fisheries (1) that are multispecies, (2) where reducing overcapitaliza- tion is the principal management objective and

Pada bagian ini akan diperlihatkan bagaimana penerapan Demand Side Management (DSM) menggunakan strategi peak clipping (sub. bagian c) pada beban harian IPA PDAM Mulia Baru seperti

The research indicates that a lack of attention to the human element of change, especially inconsistent senior management support, a lack of involvement of supervisors and

DSM adalah salah satu metoda yang dapat digunakan oleh perusahaan pembangkit listrik dalam merencanakan kebutuhan konsumsi listrik di masa mendatang berdasarkan pertimbangan

Jadi dengan penerapan metode DSM, yaitu berupa load shifting dan koreksi faktor daya, pemakaian daya listrik dapat direduksi, sehingga permasalahan yang berkaitan

Although national weather forecasts are carried out nowadays in developing countries, it is seldom that reliable local weather data and their correlation with load demand are readily

Jurnal Pendidikan Tambusai 8092 Teknologi Smart Grid Untuk Penerapan Demand Side Management: Prospek Masa Depan di Indonesia Bona Hamonangan Lubis Kementerian Energi dan Sumber

3 OPTIMIZATION MODEL AND PROPOSED OPTIMAL CONTROL METHOD 3.1 DSM model of the grid connected PV-WT- Battery hybrid system As stated in the introduction, the optimization problem