• Tidak ada hasil yang ditemukan

Gert Sibande District Municipality 2011/12 Final Annual Report

N/A
N/A
Protected

Academic year: 2025

Membagikan "Gert Sibande District Municipality 2011/12 Final Annual Report"

Copied!
261
0
0

Teks penuh

(1)

Gert Sibande

District Municipality

2011/12 Final Annual Report

“A District Municipality Striving to Excel in Good Governance and

Quality Infrastructure”

(2)

CON

CHAP CO CO 1 1 1 1 1 CHAP

CO 2 2 CO 2 CO 2 2 CO 2 2 2 2 2 CHAP

TENTS

PTER 1 – MA OMPONENT A OMPONENT B .1. MUNI .2. MUNI .3. SERV .4. FINA .5. AUDI PTER 2 – GO OMPONENT A 2.1 POLIT 2.2 ADMI OMPONENT B

2.3 INTER OMPONENT C 2.4 PUBL 2.5 IDP P OMPONENT D

2.6 RISK 2.7 SUPP 2.8 BY-LA 2.9 WEBS 2.10 PUBL

PTER 3 – SE

Gert Siband AYOR’S FOR A: MAYOR’S B: EXECUTI ICIPAL MAN ICIPAL FUN VICE DELIVE

NCIAL HEA ITOR GENER OVERNANCE A: POLITICA TICAL GOV INISTRATIV B: INTERGO RGOVERNM C: PUBLIC A LIC MEETING PARTICIPAT

D: CORPOR K MANAGEM PLY CHAIN M

AWS ...

SITES ...

LIC SATISFA ERVICE DEL

de District Mu REWORD AN S FOREWOR VE SUMMAR NAGER’S OV

CTIONS, PO ERY OVERV

LTH OVERV RAL REPOR E ...

AL AND ADM ERNANCE ..

VE GOVERNA OVERNMENT MENTAL REL ACCOUNTAB GS ...

TION AND AL RATE GOVER MENT ...

MANAGEME ...

...

ACTION ON IVERY PERF

unicipality – 2 ND EXECUT RD ...

RY ...

VERVIEW ....

OPULATION VIEW ...

VIEW ...

RT ...

...

MINISTRATIV ...

ANCE ...

TAL RELATIO LATIONS ....

BILITY AND ...

LIGNMENT . RNANCE ...

...

ENT ...

...

...

MUNICIPAL FORMANCE

011/12 Draft IVE SUMMA ...

...

...

AND ENVIR ...

...

...

...

VE GOVERN ...

...

ONS ...

...

PARTICIPAT ...

...

...

...

...

...

...

L SERVICES E (PERFORM

Annual Repo ARY ...

...

...

...

RONMENTA ...

...

...

...

NANCE ...

...

...

...

...

TION ...

...

...

...

...

...

...

...

S ...

MANCE REPO

rt CONTENTS ...

...

...

...

L OVERVIEW ...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

ORT PART I

2

... 11

... 11

... 16

... 16

W... 19

... 25

... 26

... 28

... 29

... 29

... 29

... 32

... 34

... 34

... 35

... 39

... 41

... 42

... 42

... 45

... 46

... 46

... 47

I) ... 48

(3)

CO 3 3 3 3 W 3 3 3 CO 3 CO 3 3 P CO 3 3 3 3 CO 3 3 CO 3 3 3

OMPONENT A 3.1 WATE 3.2 WAST 3.3 ELEC 3.4 WAST WASTE DISP 3.5 HOUS 3.6 FREE 3.7 ROAD OMPONENT B 3.8 TRAN OMPONENT C

3.9 PLAN 3.10 LOCA PLACES) ...

OMPONENT D 3.11 LIBRA 3.12 CEME 3.13 CHIL 3.14 OTHE OMPONENT E 3.15 POLL 3.16 BIO-D OMPONENT F 3.17 MUNI 3.18 THUS 3.19 AMBU

Gert Siband A: BASIC SE ER PROVISI TE WATER CTRICITY ...

TE MANAGE POSAL, STR

SING ...

E BASIC SER DS ...

B: ROAD TR NSPORT ...

C: PLANNIN NNING ...

AL ECONOM ...

D: COMMUN ARIES; COM ETERIES AN D CARE; AG ER TRANSV

E: ENVIRON LUTION CON DIVERSITY ..

F: HEALTH ..

ICIPAL HEA SONG SERV ULANCE SE

de District Mu ERVICES ...

ION ...

(SANITATIO ...

EMENT (THI REET CLEAN

...

RVICES AND ...

RANSPORT ..

...

G AND DEV ...

MIC DEVELO ...

NITY & SOCI MMUNITY FA ND CREMAT GED CARE;

VERSAL PRO NMENTAL PR NTROL ...

...

...

ALTH AND E VICE CENTR ERVICES ...

unicipality – 2 ...

...

ON) PROVISI ...

IS SECTION NING AND R ...

D INDIGENT ...

...

...

VELOPMENT ...

OPMENT (IN ...

IAL SERVICE ACILITIES ...

TORIUMS ....

SOCIAL PR OGRAMMES ROTECTION ...

...

...

NVIRONMEN RES (TSC’s)

...

011/12 Draft ...

...

ION ...

...

TO INCLUD RECYCLING) ...

T SUPPORT . ...

...

...

T ...

...

CLUDING TO ...

ES ...

...

...

ROGRAMMES S ...

N ...

...

...

...

NTAL SERV ...

...

Annual Repo ...

...

...

...

DE: REFUSE ) ...

...

...

...

...

...

...

...

OURISM AN ...

...

...

...

S ...

...

...

...

...

...

VICES ...

...

...

rt CONTENTS ...

...

...

...

E COLLECTI ...

...

...

...

...

...

...

...

ND MARKET ...

...

...

...

...

...

...

...

...

...

...

...

...

3

... 48

... 48

... 63

... 67

ONS, ... 67

... 68

... 70

... 70

... 73

... 73

... 74

... 74

... 75

... 79

... 79

... 79

... 80

... 80

... 89

... 89

... 91

... 92

... 92

... 94

... 97

(4)

3 CO 3 3 CO 3 CO 3 3 CO CO CHAP

CO 4 CO 4 4 CO 4 CO 4 CHAP

CO 5 5 5

3.20 HEAL OMPONENT G

3.21 FIRE 3.22 DISA OMPONENT H

3.23 SPOR OMPONENT

3.24 ANAL 3.25 HUMA OMPONENT J OMPONENT K PTER 4 – OR OMPONENT A

4.1 EMPL OMPONENT B 4.2 POLI 4.3 INJUR OMPONENT C 4.4 SKILL OMPONENT D 4.5 EMPL

PTER 5 – FIN OMPONENT A 5.1. STAT 5.2. GRAN 5.3. ASSE

Gert Siband LTH INSPEC G: SECURIT SERVICES . ASTER MANA

H: SPORT A RT AND REC

I: CORPORA LYSIS OF TH AN RESOUR J: MISCELLA K: ORGANIS RGANISATIO A: INTRODU LOYEE TOT

B: MANAGIN CIES ...

RIES, SICKN C: CAPACIT LS DEVELO D: MANAGIN LOYEE EXP NANCIAL PE

A: STATEME TEMENTS O

NTS ...

ET MANAGE

de District Mu CTION; FOO TY AND SAF ...

AGEMENT ...

AND RECREA CREATION ..

ATE POLICY HE DEPART RCE SERVIC ANEOUS ...

SATIONAL P ONAL DEVEL UCTION TO T ALS, TURNO NG THE MUN

...

NESS AND S TATING THE OPMENT AND

NG THE WO ENDITURE ..

ERFORMANC ENTS OF FIN F FINANCIA ...

EMENT ...

unicipality – 2 D AND ABB ETY...

...

...

ATION ...

...

Y OFFICES A TMENTS BY CES ...

...

PERFOMANC LOPMENT P THE MUNIC OVER AND V NICIPAL WO

...

SUSPENSIO MUNICIPAL D TRAINING RKFORCE E ...

CE ...

NANCIAL PE AL PERFORM

...

...

011/12 Draft BATOIR LICE

...

...

...

...

...

AND OTHER POST GRAD ...

...

CE SCOREC PERFORMAN

IPAL PERSO VACANCIES ORKFORCE .

...

ONS ...

L WORKFOR G...

EXPENDITU ...

...

ERFORMANC MANCE ...

...

...

Annual Repo ENSING AND

...

...

...

...

...

SERVICES . DING CATEG ...

...

CARD ...

NCE ...

ONNEL ...

S ...

...

...

...

RCE ...

...

RE...

...

...

CE ...

...

...

...

rt CONTENTS D INSPECTIO

...

...

...

...

...

...

GORY ...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

4

ON ... 97

... 99

... 99

... 99

... 104

... 104

... 106

... 106

... 106

... 108

... 109

... 165

... 165

... 166

... 167

... 167

... 168

... 169

... 169

... 170

... 170

... 172

... 172

... 172

... 174

... 175

(5)

5 CO 5 5 CO 5 5 5 CO 5 5 CHAP

CO 6 CO GLOS APPE APP APP APP APP APP APP APP APP APP

5.4. FINA OMPONENT B

5.5. CAPI 5.6. SOUR OMPONENT C 5.7. CASH 5.8. BORR 5.9. PUBL OMPONENT D

5.10. SUPP 5.11. GRAP PTER 6 – AU OMPONENT A

6.1 AUDITOR OMPONENT B

SSARY ...

ENDICES ...

PENDIX C – PENDIX D – PENDIX K:

PENDIX K (i PENDIX K (i PENDIX M:

PENDIX M (i PENDIX M (i PENDIX N –

Gert Siband NCIAL RATI B: SPENDIN TAL EXPEN RCES OF FI

C: CASH FLO H FLOW ...

ROWING AN LIC PRIVATE D: OTHER F PLY CHAIN M

P COMPLIA UDITOR GEN

A: AUDITOR R GENERAL B: AUDITOR ...

...

–THIRD TIER – FUNCTION REVENUE C ): REVENUE i): REVENUE

CAPITAL EX i): CAPITAL ii): CAPITAL – CAPITAL P

de District Mu IOS BASED NG AGAINST NDITURE ...

NANCE ...

OW MANAG ...

ND INVESTM E PARTNER FINANCIAL M

MANAGEME NCE ...

NERAL AUDI R-GENERAL L REPORTS R-GENERAL ...

...

R ADMINISTR S OF MUNIC COLLECTION E COLLECTIO E COLLECTI XPENDITUR EXPENDITU EXPENDITU ROGRAMME

unicipality – 2 ON KEY PE T CAPITAL B ...

...

GEMENT AND ...

MENTS ...

RSHIPS ...

MATTERS ....

ENT ...

...

IT FINDINGS OPINION OF 2011/12 ...

OPINION 20 ...

...

RATIVE STR CIPALITY / E N PERFORM ON PERFOR ION PERFOR RE – NEW &

URE - NEW A URE – UPGR E BY PROJE

011/12 Draft ERFORMANC

UDGET ...

...

...

D INVESTME ...

...

...

...

...

...

S ...

F FINANCIA ...

011/12 ...

...

...

RUCTURE ....

ENTITY ...

MANCE BY V RMANCE BY RMANCE BY UPGRADE/R ASSETS PRO RADE/RENE ECT 2011/12

Annual Repo CE INDICAT ...

...

...

ENTS ...

...

...

...

...

...

...

...

AL STATEME ...

...

...

...

...

...

VOTE AND B Y VOTE ...

Y SOURCE ..

RENEWAL P OGRAMME . EWAL PROG

...

rt CONTENTS TORS ...

...

...

...

...

...

...

...

...

...

...

...

ENTS 2011/1 ...

...

...

...

...

...

BY SOURCE ...

...

PROGRAMM ...

RAMME ...

...

5

... 176

... 178

... 178

... 179

... 181

... 181

... 182

... 183

... 183

... 183

... 183

... 185

2 ... 185

... 185

... 185

... 186

... 189

... 189

... 190

... 192

... 192

... 193

ES ... 194

... 194

... 197

... 200

(6)

APP APP APP AN APP APP ADDEN ADDEN PERFO

OFF OFF BUD BUD INF COR COR COM COM ADDEN ADDEN VOLUM

PENDIX O – PENDIX P – PENDIX Q – OTHER SPH PENDIX S – PENDIX U – NDUM A: IDP NDUM B: SDB ORMANCE IND FICE OF THE M FICE OF THE M DGET AND TRE DGET AND TRE RASTRUCTUR RPORATE SERV RPORATE SERV MMUNITY AN MMUNITY AN NDUM C: DEF NDUM D: SCO ME II: ANNUA

Gert Siband – CAPITAL P

SERVICE C – SERVICE B HERE OF GO

DECLARAT – PERFORMA

SCORECARD . BIP COMPONE DICATORS ...

MUNICIPAL MA MUNICIPAL MA EASURY – KEY EASURY – PRO E AND TECHN VICES – KEY PE VICES – PROJE

D SOCIAL SER D SOCIAL SER INITIONS ...

ORING METHO AL FINANCIAL S

de District Mu ROGRAMME CONNECTIO BACKLOGS E

OVERNMEN TION OF RET

ANCE REPO ...

NTS – ANNUA ...

ANAGER – KEY ANAGER – PRO Y PERFORMAN OJECTS ...

ICAL SERVICES ERFORMANCE ECTS ...

VICES – KEY P VICES – PROJE ...

OD ...

STATEMENTS .

unicipality – 2 E BY PROJE N BACKLOG EXPERIENC T IS RESPO TURNS NOT ORT ADDEND

...

AL SERVICE DE ...

Y PERFORMAN OJECTS ...

NCE INDICATOR ...

S – KEY PERFO E INDICATORS

...

ERFORMANCE ECTS ...

...

...

...

011/12 Draft ECT BY WAR GS AT SCHO CED BY THE ONSIBLE FOR

T MADE IN D DUMS ...

...

LIVERY TARGE ...

NCE INDICATO ...

RS ...

...

ORMANCE IND ...

...

E INDICATORS ...

...

...

...

Annual Repo RD 2011/12 ..

OOLS AND C COMMUNIT R SERVICE DUE TIME UN

...

...

ETS AND NON- ...

RS ...

...

...

...

DICATORS ...

...

...

S ...

...

...

...

...

rt CONTENTS ...

CLINICS ...

TY WHERE PROVISION NDER MFMA ...

...

-FINANCIAL ...

...

...

...

...

...

...

...

...

...

...

...

...

6

... 203

... 206

N ... 207

A S71 . 208 ... 209

... 209

... 219

... 219

... 226

... 226

... 235

... 237

... 240

... 247

... 248

... 258

... 259

... 260

... 261

(7)

LIST Table Table Table Table Table Table Table Table Table Table Table Table Table Table Table Table Table Table Table Table Table Table Table Table Table

T OF TABLES 1 Local munic 2 GSDM Popu 3 Population G 4 Socio Econo 5 Financial Ov 6 Operating R 7 Total Capita 8 Community 9 IDP Particip 10 By-laws ....

11 Water Prov 12 RBIG Capit 13 ACIP Capit 14 Planning a 15 Total Capit 16 Total Use o 17 Water Loss 18 Water serv 19 Water Serv 20 Residentia 21 Residentia 22 Sanitation 23 Capital Exp 24 Capital Exp 25 Electrical p

Gert Siband S

cipalities main ulation ...

Gender Distrib omic Status ....

verview 2011/

Ratios ...

al Expenditure y Meeting Sche

ation and Alig ...

vision - Roles tal Expenditur al Expenditure nd support pr tal Expenditur of Water by Se ses ...

vices provision vices Provision l Consumer U l Consumer U Projects ...

penditure - Bo penditure – VI projects ...

de District Mu administratio ...

bution ...

...

/2012 ...

...

e ...

edule ...

gnment Criteri ...

and Responsi e ...

e ...

rojects ...

re ...

ector (cubic m ...

n ...

n – Detailed S Units for Sanita Units - Service

...

oreholes ...

IP Toilets ...

...

unicipality – 2 on offices ...

...

...

...

...

...

...

...

ia ...

...

bilities ...

...

...

...

...

meters) ...

...

...

ervice Level S ation ...

Level Detailed ...

...

...

...

011/12 Draft ...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

ummary of W ...

d Summary fo ...

...

...

...

Annual Repo ...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

Water ...

...

r Sanitation ...

...

...

...

...

rt CONTENTS ...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

7

... 19

... 20

... 21

... 24

... 27

... 27

... 28

... 40

... 41

... 46

... 49

... 53

... 54

... 56

... 59

... 60

... 60

... 61

... 62

... 64

... 64

... 65

... 66

... 66

... 67

(8)

Table Table Table Table Table Table Table Table Table Table Table Table Table Table Table Table Table Table Table Table Table Table Table Table Table Table

26 Local mun 27 Roads proj 28 Roads proj 29 Economic A 30 EPWP Job 31 GSDM HIV 32 Outcome I 33 Capital Exp 34 Overall sta 35 Corporate 36 Corporate 37: Overall Pe 38: Departme 39 Office of th 40 Office of th 41: Summary 42 Budget and 43 Budget and 44 Budget and 45 Tender Tu 46 BEE Procur 47 Surplus Fu 48 Matured In 49 Corporate 50 Corporate 51: Summary

Gert Siband icipality Housi jects Region 1 jects Region 2 Activity ...

Creation ...

V/ AIDS prevale ndicators for penditure Rec affing complem

Services staff Services Oper erformance ....

ental Performa he Municipal M he Municipal M Performance d Treasury KP d Treasury Pro d Treasury - S rn Around Tim rement ...

nds ...

nvestments ...

Services KPI ..

Services Proje Performance

de District Mu ing by type of 1...

2...

...

...

ence rate stat TB/HIV ...

reation ...

ment ...

fing compleme rational Expen ...

ance Overall S Manager KPI ..

Manager Proje - Office of the I ...

ojects ...

ummary Perfo me - Projects...

...

...

...

...

ects ...

– Corporate S

unicipality – 2 f dwelling ...

...

...

...

...

istics (STATS S ...

...

...

ent ...

nditure ...

...

Scores ...

...

ects ...

e Municipal M ...

...

ormance ...

...

...

...

...

...

...

Services ...

011/12 Draft ...

...

...

...

...

SA 2010) ...

...

...

...

...

...

...

...

...

...

Manager ...

...

...

...

...

...

...

...

...

...

...

Annual Repo ...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

rt CONTENTS ...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

8

... 68

... 71

... 72

... 77

... 78

... 83

... 83

... 104

... 106

... 106

... 107

... 110

... 113

... 114

... 114

... 115

... 123

... 124

... 124

... 127

... 128

... 130

... 130

... 135

... 136

... 136

(9)

Table Table Table Table Table Table Table Table Table Table Table Table Table Table Table Table Table Table Table Table Table Table Table Table Table Table

52 Staff turno 53 Communit 54 Communit 55: Summary 56 Quarterly C 57 Monthly w 58 Atmosphe 59 Infrastruct 60: Summary 61 Employme 62 Turn-over 63 HR Policie 64 IOD’s...

65 Disciplinar 66 Skills deve 67 Employee 68 Financial P 69Financial Po 70 Governme 71 Capital Exp 72 Sources of 73 Capital Spe 74 Cash flow . 75 Actual Bor 76 Investmen 77 Grap Comp

Gert Siband over rate ...

ty and Social S ty and Social S Performance Council Meeti water samples ric emission li ture and Techn

Performance ent Status ...

Rate ...

es and Plans ...

ry Outcomes ..

lopment and t Related Costs Performance ..

osition ...

ent Grants and penditure...

f Finance ...

ending on Cap ...

rrowing ...

nts ...

pliance ...

de District Mu ...

Services KPI ....

Services Projec –Community ings ...

taken ...

cense applica nical Services – Infrastructu ...

...

s 2011/12 ...

...

...

training...

s ...

...

...

d Subsidies ...

...

...

pital Projects ..

...

...

...

...

unicipality – 2 ...

...

cts ...

and Social Se ...

...

tions ...

KPI ...

ure and Techn ...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

011/12 Draft ...

...

...

rvices ...

...

...

...

...

nical Services ..

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

Annual Repo ...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

rt CONTENTS ...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

9

... 140

... 143

... 143

... 144

... 145

... 148

... 150

... 156

... 156

... 166

... 166

... 167

... 168

... 168

... 169

... 170

... 172

... 173

... 174

... 178

... 179

... 180

... 181

... 182

... 182

... 184

(10)

LIST O Figure Figure Figure Figure Figure Figure Figure Figure Figure

OF FIGURES e 1 Distribution e 2 Gini-coeffic e 3 Poverty rat e 4 GSDM: Pol e 5 Administra e 6 KPA Perfor e 7 KPA Perfor e 8 KPA Perfor e 9 KPA Perfor

Gert Siband n Table ...

cient in Gert S tes in Mpuma itical Organisa

tive Organogr mance Septem mance Decem mance March mance June 2

de District Mu ...

Sibande and its langa and Ger ational Structu ram ...

mber 2011 ...

mber 2011 ...

h 2012 ...

2012 ...

unicipality – 2 ...

s local munici rt Sibande, 199 ure ...

...

...

...

...

...

011/12 Draft ...

palities, 1996 96 – 2010 ...

...

...

...

...

...

...

Annual Repo ...

– 2010 ...

...

...

...

...

...

...

...

rt CONTENTS ...

...

...

...

...

...

...

...

...

10

... 22

... 23

... 24

... 30

... 32

... 111

... 111

... 112

... 112

(11)

CHA

COM It is a 2011/

depar Organ the in others Gove Takin availa Vision pursu

• Throu detail Distric Office Gert S On se Luthu menti have and o additi comm servic The G CALM with th The D Munic Comm

Gert Siband APTER 1 –

MPONENT a great hono /2012. The G rtments such nization and nitiative by N

s, the Outco rnment.

g cognisanc ability of fun n and Missio ued in the sho

KPA 1: Mun KPA 2: Bas KPA 3: Loca KPA 4: Mun KPA5: Inter KPA 6: Spa ugh the chall s with the re ct with lesse e of the Audi Sibande Dist ervice delive uli Local Mun

oned in term given a wate other places

onal suppor munity the GS

ce the remain GSDM has f M already pos

hat are in line District Muni cipality, Actin munity Servic

de District Mu – MAYOR’S

A: MAYO our that I ha Gert Sibande h as Comm

Traditional L National Gov ome Approac

ce of the dev ds allocated on, the Distri ort- to mediu nicipal Transf sic Service De

al Economica nicipal Financ rgovernmenta atial Rationale lenges the D eport, the Aud r matters of e itor General trict Municipa ery and infras

nicipality and ms of water c

er cart that w s that fall un rt to CALM

SDM has ma ning tanks un further procu ssess for the e with Servic icipality have ng Chief Fina ces to Dr. Pix

unicipality – 2 S FOREW

R’S FORE ve to presen e District Mun munity Memb Leaders duri vernment to

ch and took

velopmental c d to support ict has set fo m term. The formation an elivery and In al Developm cial Viability a al Relations, e and Munici District is fac ditor Genera emphasis. It

will come to ality have bee

structure dev d Msukaligwa crisis and ot will be workin nder Msukal

as a matter ade an effort ntil such time ured some 1 e provision of ce Delivery an

e deployed ancial Officer xley Ka Isaka

2011/12 Draft F WORD AND

EWORD nt the Gert S nicipality ack bers, Gover ng this proce

intensify it m into conside

challenges th these initiat or itself the Developmen d Organizati nfrastructure ment

and Manage Good Gover ipal Planning cing, it is imp al in year 201 is my belief o the same c en well mana velopment, t a Local Mun ther problem ng stand by t igwa Local r of urgency to support th e as it is no lo

0,000 litre ta f water. There nd Infrastruc

an Acting M r in Chief Alb a Seme Loca

Annual Repo FOREWORD A D EXECUT

Sibande Dist knowledge th rnment Para ess. The Dis mandate of eration all th

hat the Distr tive and ulti Developmen ntal Objective onal Develop Developmen ement

rnance and P g Alignment

portant to me 11/2012 decla that even fo conclusion th aged and utili he District h nicipality and ms they were to assist with

Municipality and to circ he CALM wit onger require anks that wi e are lots of cture Develop Municipal Ma bert Luthuli a al Municipality

rt | CHAPTER AND EXECUTIV TIVE SUMM

trict Municipa he positive p astatals, NG strict Municip service deliv hese initiativ

rict is faced w mately realis ntal Objective es and Strate pment nt

Public Partici

ention that e ared unquali or the 2012/2 hat the public

ised.

has managed d the other s facing. In M h water to the and Due to cumvent any

th the provis ed.

ll add to the project that t pment.

anager to as and as well a y.

1 – MAYOR’S VE SUMMARY MARY

ality Annual articipation f O, Commun pality also ac

very through e and progr

with, compile se the afore e and Strate egies are:

pating

even before fied audit rep 2013 annual r

c funds in th

d to assist C sister municip Msukaligwa,

e community o the need y inconvenie sion of a tank

e quantity of the District is

ssist Dipales as Corporate

S Y

11 Report for from sector nity Based cknowledge h, amongst rammes by

ed with the ementioned egies to be

we go into port for the report, the e hands of

Chief Albert palities not the District y of Ermelo to provide nce to the ker that will

tanks that in process

seng Local e Services,

(12)

Furthe Local Mkho Town toilets The D Munic partne Key P The G respe IDP o proce the re const

Key S PROJ Phys The Engin Comp certifi

Gert Siban ermore, a ne Municipality ondo Local M planning De s and water s District remai cipalities. On erships with a Policy Devel

Gert Sibande ective operat of the District ess. Some of elevant Dist ituent munici Summary o Organisatio Spatial Dev Skill Develo District LED Integrated W Integrated T District HIV/

Community Disaster Ma Integrated W Financial M Employmen Integrated E Air Quality M Integrated T

Service Deliv JECT IMPLE

ical Progres physical pro neers’ estima pletion of a p cate for each

nde District M ew township y). The town Municipality. T epartment to supply to ass

ined committ e way we ha all our stakeh lopments e District Mu ional strateg

Municipality f these plans trict wide de

ipality.

of the sector p onal Performa velopment Fra opment Plan D Strategy

Waste Manag Transport Pla

/AIDS Plan y plan

anagement P Water Servic Management P

nt Equity Plan Environment

Management Tourism Plan

very EMENTATIO

ss

ogress/constr ate of progres project for the

h project.

Municipality – 2 is establishe nship will be The Gert Sib o assist the sist the comm

ted in ensuri ave done this holders, as w

unicipality ha gies (Sector

as per Secti s will be prep

evelopment

plans herein ance Manage

amework 200

gement Plan an

Plan

ce Developme Plan

n

managemen t Plan n

N

ruction statu ss on the tas e purpose of

2011/12 Draft F ed in Dirkies e a joint proj bande Distric

building of r munity of Dirk ng that the b s has been th well as with a

ave complied Plan). The s ion 26 of MF pared or dev initiative an

included the ement System 09

2006

ent Plan

nt Plan

us on an in sk (including this report is

t Annual Repo FOREWORD A

dorp in the a ject for Gert ct have reque reservoir, con kiesdorp.

best of servic hrough ensur all our Local M

d and prepa sector plan c MA and play veloped and nd direct inf

e following:

ms

ndividual pro planning rela s based on t

ort CHAPTER ND EXECUTIV area between

t Sibande D ested its Tec nnect pipes,

ce delivery is ring that we e Municipalities

ared an exec constitutes co ys a significan others review form and al

oject is bas ated activitie he issuing of

1 – MAYOR’S VE SUMMARY n Piet Retief District Munic chnical Depa give them p

s provided to engage and f s.

cutive summ ore compone nt role in the wed in consi

ign with tho

ed on the s and mater f a practical

12 f (Mkhondo cipality and

rtment and proper VIP

o our Local form strong

mary of the ents of the integration deration of ose of the

Consulting ial on site).

completion

(13)

Wate Profe GSDM maste inform study infras to me 2011/

Sectio of bu provis budge infras To da and c work sanita Inform procu The p comp Spec There

Stake The d comm comp month Imple Fundi assoc would for th

Gert Siban r Master Pla ssional Serv M by way of er plan that i mation that is

, the match structure with eet the future

/12 and previ ons 6 to 9 of lk water and sion of prelim ets to be imp structure and

ate the proje costing of bu performed u ation services mation that is ure it.

project is curr letion of the ial Intervent e are two proj Installation identificatio formal train Installation each LM on eholder Sup division conti menting on liance to DW h on the RBIG ementation o

ing has bee ciated fundin d like to procu he operation

nde District M anning vice Provider

f BAC 45/201 ncludes for a s available to hing of reso RBIG projec e demands.

ious financia f the project w d reticulation

minary draft plemented in

the phasing ct has begun lk infrastruct nder section s into Wadis s known to e

rently on trac immediate ta tion Projects jects being im

of Bulk Wate n of leaks at ing and prac

of Managem n operational

port

nues to supp planning do WA systems.

G Projects.

of Water and n allocated t g will be spe ure stock for ns of treatm

Municipality – 2 rs were appo 10 and have a Strategic P o master pla ources with cts and looki

All the abov l year.

were awarde augmentatio designs for n order of pr out of infrast n with the ve ture for secti

7 has been so and Sews exist with oth

ck with regar asks.

s

mplemented er meters at domestic me ctical experien ment Informa

issues.

port internal ocumentation . Support h

d Sanitation to each of t ent in each r their operati ment plants

2011/12 Draft F ointed to dev e completed Planning Ove anning, has c

demands ng at this op ve work has

ed in July 201 on plans for r the propos

iority for the tructure base erification of

ion 6 for whi the capturing san modeling her consultan

rd to time and

in this progra t abstraction

eters and in nce.

ation Systems

and externa n, completion has been pro

Maintenanc the seven lo

municipality.

ions and mai and to res

t Annual Repo FOREWORD A

velop the Int the first pha erview – Stat concluded th per zone o ption and Det been comple

12. These se the short, m sed work and progressive ed on their re actual dema ich a final dr g of all availa g software pa nts is being s

d budgets an

amme name points and r the infrastruc s with the LM

l stakeholde n of questio ovided to the

ce projects ocal municipa

Some mun intenance sto tore reticula

ort CHAPTER ND EXECUTIV tegrated Wat ase and seco tus Quo, the he comprehe of supply, O termining the eted in the f

ections inclu medium and d a list of p phasing in emaining use ands, setting raft report ha able as built ackages for sought and a

nd no problem

ly the reservoirs. U

cture and the Ms water se

rs with the p onnaires, as e infrastructu

alities for the nicipalities ha ores, others ation system

1 – MAYOR’S VE SUMMARY ter Master P ond phase of receipt of al ensive Settle Overlaying th e infrastructu

unding alloca

de for the de long term h projects with of bulk and eful life.

up of netwo as been rece drawings for the entire G attempts bein

ms are fores

Utilisation of T e repair there ervices and r

provision of in ssisting the ure division i

e planning o ave indicated are utilising t ms. The op

13 Plan for the

f the water l additional ement Data he current re capacity ated in the

evelopment orizon; the estimated distribution

ork models, eived. The r water and SDM area.

ng made to

een for the

Trainees in eof through reporting to

nformation, LM’s with in the past

on how the d that they the funding ptions and

(14)

mech munic WATE Accre The L Syste Labor GSDM Curre labora LM a Enviro Samp minim impro forwa Forum Publi The G Mand hando Cllr M held a Home Futur The G the L Munic is fac that th Urgen The G Septe provis proce receiv

Gert Siban anisms by w cipalities and ER QUALITY editation Pro Laboratory Q em (SANAS)

ratory is curre M Water Qua ently Four (4 atory for sam and Govan M

onmental He pling capacity mum required ovement note

rded to the m Meeting he c Participat Gert Siband dela Day, Ha

over of a hou MPP Nhlabats

a Budget an e Affairs.

re Actions Gert Sibande Local Comm cipality a wat ing. The Dist hey need ass nt support r GSDM suppo ember 2012 sion for wate ess controller ved from CAL

nde District M which this pr d the GSDM h Y LABORAT ogram Quality Syste

for evaluatio ently implem ality Cooper 4) Local Mu mpling and w Mbeki LM an ealth Section

y and acces d coverage f

ed from the LMs’ monthl eld in August

ing

e District ha andover of H use to Gogo M si and other nd IDP consu

e District Mun unity of Msu ter cart that w trict will ensu sistance of.

requirement orted CALM w

on the requ r and sanitat r was only fo LM so as to c

Municipality – 2 roject is to b has started th TORY

em Documen on in Februa menting action ration Agree unicipalities h water testing s nd Mkhondo

(MHS).

ssibility of sa for the three e previous m ly and the m t.

as been eng High School Mbhele by th delegates. L ultation and

nicipality hav ukaligwa Loc will be work s ure that all th

to the Chief with the prov uest by the tion maintena or the period continue with

2011/12 Draft F be implemen he procurem

nts were su ary 2012. Fe n plans to ad ement

have signed services. The o LM. The M

ampling poin LM’s with th month for a matter was a

gage in man l in Mkhond he Premier ac Last year in 2

also have a

ve join hands cal Municipa standby in a c e Local Mun

f Albert Luth ision of a pro Chief Albert ance. As the d ending Sep h this support

t Annual Repo FOREWORD A nted has bee

ent / implem

bmitted to S eedback was dress the ide

d the Water e municipalit Monthly Sam

nts continue he exception ll the affect lso highlight

ny public ga do (Inqubeko ccompany by 2011/2012 th

joint meetin

with Msukal ality with the case of wate icipality are a

huli Municip ofessional pro

t Luthuli Mu e written requ ptember 2012

t.

ort CHAPTER ND EXECUTIV en discussed

entation proc

South Africa s received a entified gaps.

Cooperation ties are Msu mpling progra

as challeng n of Govan M ted LM’s. Th

ed in the qu

athering suc o High Scho

y the Executi e Gert Siban ng with the S

ligwa Local M e water cris er problem tha

assisted acco

pality ocess contro

nicipality wit uest for CAL 2, a further r

1 – MAYOR’S VE SUMMARY d and agree cess.

National Ac t the end of .

n Agreemen kaligwa LM, am continue

ges in order Mbeki LM. T he coverage uarterly HOD

h as Wome ool), and as

ive Mayor of nde District M Stakeholder F

Municipality i is by giving at the local m ordingly in an

oller during th th the direct M for the pro request will

14 ed with the

ccreditation f April. The

nt with the Dipaliseng es with the

reach the There is no e report is D Technical

en Summit, well as a the District Municipality Forum and

in assisting the Local municipality

ny problem

he month of t allocation ovision of a

have to be

(15)

I am peopl On th Cultur Decem that w The G this ye in due Conc In con given excel

(Sign Mayo

Gert Siban sure we sha e who will be he 2012/201

re and Pasto mber 2012. F will take place Gert Sibande ear of 2013 a e time require clusion

nclusion, Ge and availab in good gove

ned by:) ___

or/Executiv

nde District M all appoint s e in position o

3 financial y oral Forum h Furthermore e on the 19th e District Mu and all New C ed by the Dis

rt Sibande D ble to its peo ernance and

__________

ve Mayor

Municipality – 2 uitable quali of the suitabl year Gert Sib have a Mora

, Gert Siband h of January 2 nicipality will Capital proje strict.

District will en ople. To assi

quality infras

__________

2011/12 Draft F fied staff in le degree or bande Distri al Regenerat de District M 2013 at Emp l make sure cts and as w

nsure that se ist its Local

structure.

________

t Annual Repo FOREWORD A

the Laborato qualifications ct Municipal ion at Wess Municipality w puluzi, in Chie

that all the o well as Small

ervice deliver Municipalitie

ort CHAPTER ND EXECUTIV ory Departm s.

ity, Departm elton Stadiu will have a Dis

ef Albert Luth outstanding

project will b

ry and infrast s according,

1 – MAYOR’S VE SUMMARY ment before J

ment of Sport m, Ermelo o strict Traditio huli Local Mu projects are be as well be

tructure deve that means

15 June 2013,

t, Arts and on the 31st onal Imbizo unicipality.

completed completed

elopment is s striving to

(16)

COM 1.1.

The D streng good aligne summ past t Gert S main ensur public their n of the Econo this D more Munic In 20 not an Gert S Metro West, the so

Gert Siban MPONENT MUNICIP

District has gth to streng governance ed to the pro marise the re

twelve month Sibande Dis

plan which ring equitable c participatio

needs and c e people are omic Develo Department, a

are well mo cipalities and

11, the Gert n easy exerc Sibande. The o of Gauteng

, Ehlanzeni D outh east of K

nde District M B: EXECU PAL MANA

come a long gth. Our visio

and quality ovincial grow eport on the i hs, which is th

trict Municip informs our e distribution

n and involv concerns thro e. For the pment was e all forums re onitored and d our stakeho Sibande Dis cise but was e GSDM Off g to the west District Munic

KwaZulu-Nat

Municipality – 2 UTIVE SU

GER’S OVE

g way since on has no do infrastructure wth and deve improvement he financial y ality continu

quest to im of resources vement. Our ough these m IDP to be w established to elating to plan d well functio olders.

strict Municip a strategic m fices are loca t, Sedibeng D cipality to the

tal and Swaz

2011/12 Draft F MMARY ERVIEW

e the era of oubt been re

e. We have b elopment pla

ts in terms o year 2011/20 es to utilize mprove servic s. IDP Consu

communities mechanisms.

well impleme o focus on a nning such a oning, and th

pality officiall move which ated on the District Munic e north east o ziland to the e

t Annual Repo FOREWORD A

F

democracy.

ealized day a been sensitiv ans. This An of service de 012.

the Integrate ce delivery, b ultative meet s are given It assures th ented, a Dis all matters rel as IDP Forum

hese are co

ly relocated f would bring N17 corridor cipality of the of Mpumalan

east. The ce

ort CHAPTER ND EXECUTIV

FORE

Mun

We have w after day, tha

ve in making nnual Report elivery made

ed Developm better our p tings are high

platforms an he District of strict Depart lating to regi m, LED Foru mposed of b

from Secund government r in Ermelo b e Northern F nga, Amajuba ntrality of the

1 – MAYOR’S VE SUMMARY

EWO

C.A.

icipal Ma

witnessed it at of striving g sure that th document a during the c

ment Plan (ID lanning proc hly prioritized nd channels f what the ex ment of Pla onal plannin m, Tourism both the Dis

da to Ermelo closer to the bounded by Free State to a District Mun ese offices en

16

ORD

Habile anager

grow from to excel in his vision is attempts to cycle of the

DP) as the cesses and d to ensure to express xpectations anning and

g. Through Forum and strict, Local

o. This was e people of Ekurhuleni o the South nicipality to nsures that

(17)

the re the fru We c peopl workin Gert S then.

able appre Leade resou Unfor audit obtain imple that t curren are a which critica On a unwav Plan install Servic Accel includ Seme sixty n been The D impro but al users

Gert Siban esiding comm uitfulness of continually wo

e in the Ger ng relationsh Sibande host Also, Gert S to establish eciated throu

ers which al urces are aim rtunately, due

report, Gert ned in the p ment audit a he audit out ntly is the ful ble to perfor h will help us al issue of se

drive to impr vering suppo (IWMP) and lation of Bul ces in the

erated Com ded in this re e and Msuka nine (69) Pro possible with District is al oving water q lso other org s and all othe

nde District M munities and the decision ork hand in rt Sibande R hips with our ted a Busine Sibande prom

a partnersh ughout the P lso participa med at improv e to certain m

Sibande Dis previous year ction plans to tcomes for th ly functioning rm in an effe s improve no

rvice delivery rove service ort to the Lo d there are o k Water and Local Muni mmunity Infra

eport. The D aligwa Munic ocess Contro hout help from lso able to quality. A wat ans of state, er consumer

Municipality – 2 the District i to relocate. T hand with o Region. We h stakeholders ess Networkin motes Tradit hip with our Province and tes in Coun ving their info matters of em strict Municip

r to an Unq o enhance th he following g Section 79 ctive and eff ot only in ter

y.

delivery in te ocal Municip other special d the installa cipalities. Th astructure P District Munic cipalities. In t ollers within L m our sister

give suppor ter quality tes

non-govern rs. Furthermo

2011/12 Draft F interact at ea The offices a our seven sis ave also gon s, our partne ng Dinner an tional Leade

Traditional d beyond. T ncil Affairs w ormation and mphasis issu pality regress ualified Audi he internal co year vastly and 80 Com ficient manne rms of the m

erms of wate alities. The l intervention ation of Mana

he District rogramme ( cipality comp terms of loca LM’s to an N

Department rt to Local M

sting laborato mental organ ore, our sup

t Annual Repo FOREWORD A

ase. The pas are far easier ster municipa ne beyond a ers in the deli nd this has se

rship, culture Leaders in The Gert Sib was provided

communicat es raised by sed from its g

it Report tha ontrols and co

improves. O mmittees and

er. This is an management

r provision, t District deve n programme agement info is also prov ACIP). Deta leted Water al skills deve QF 2 Level o of Water Affa Municipalities ory is servicin nizations, co

port extends

ort CHAPTER ND EXECUTIV st twelve mo r to access.

alities in imp and ensured ivery of impro een substant e and our he

a manner t bande Loca d with laptop tion services y the Auditor great achieve at was obtai

ompliance is One of the s because of nticipated to of municipal

he District M eloped an In es being imp ormation Sys viding signif ailed informa Safety Plan elopment, G of competenc airs in our Pr s experiencin

ng, not only mmercial, ag s to electricit

1 – MAYOR’S VE SUMMARY nths have pr

proving the l that we stre oved service tial developm eritage. We that is recog

l House of ps and printe

.

General in h ement of a C ned. Gert S ssues in orde strengths of t their establis have a posi l funds but a

Municipality ha tegrated Wa plemented su stems within ficant suppo ation in this

s for the Dr.

SDM was ab ce. This coul rovince.

ng water pr the local mu gricultural an ty, basic san

17 roven to us

ives of the ngthen our es. In 2011, ments since have been gnized and Traditional ers. These

his 2011/12 Clean Audit ibande will er to ensure the District shment, we tive impact also on the

as ensured ater Master uch as the the Water ort through

regard is . Pixley Ka ble to train ld not have

roblems by nicipalities, d industrial nitation and

(18)

rudim pump All of also a sadde infect in th imple are re I hope strive I wish their u lives

Team accom uncom I also for the us pu

HABI MUNI GERT

Gert Siban mentary wate

ps is being pr us have to b as a District.

ening that a ion rate. Let e fight aga mentation of esponsible fo e that as yo to improve s h to express unwavering s

of the Gert mwork is the mplishments mmon results o appreciate t eir strong de rsue our goa

LE, C.A (MR ICIPAL MAN T SIBANDE

nde District M r supply for rovided contin be concerned Mpumalanga mongst the

us partake in ainst HIV/AI f District HIV/

or creating an u peruse this service delive my sincere support and Sibande peo e ability to w

towards org s.

the Executiv ecision makin al which is to

R) NAGER

DISTRICT M

Municipality – 2 the rural an nuously.

d about the p a is one of th three Distric n the program IDS, progra

/AIDS strateg nd securing a

s document, ery and there

gratitude to ensuring tha ople. Let us work together ganization ob

e Mayor, the ng by which t

excel in goo

MUNICIPALIT

2011/12 Draft F nd farm area

prevalent HIV he three (3) P cts in the Pr mmes that th mmes such gy and imple a healthy env all your exp efore welcom the Heads o at we combin remember t r towards a bjectives. It is

e Mayoral Co he lives of o od governanc

TY

t Annual Repo FOREWORD A as. Infrastruc

V/AIDS infec Provinces wi rovince, our he governmen

h as the v ementation p vironment for

pectations w me your inputs

of Departmen ne all our effo

the words of common vis s the fuel th

ommittee and ur people in ce and quality

ort CHAPTER ND EXECUTIV cture such a

ction rate not ith the highes District has nt and its par voluntary co plan and awa our future ge ill be met. W s.

nts and the e orts on a dai f an anonym sion. The ab at allows co

d the Gert Si the District c y infrastructu

1 – MAYOR’S VE SUMMARY as VIP toilets

only as a Pr st infection ra

the highest rtners have p ounseling an areness camp enerations.

We, as the D

entire admini ily basis to im mous author

bility to direc ommon peop

ibande Coun can be made

re!

18 s, borehole

rovince but ate but it is t HIV/AIDS put in place nd testing, paigns. We

istrict, also

stration for mprove the which said t individual le to attain

ncil at large better. Let

(19)

1.2.

INTRO The D munic Mofut Distric in Mp the so Spatia provin The d admin Table

Local

Albert

Dipale

Lekwa

Msuka

Mkhon

Pixley

Govan

TOTA

Sourc From munic

Gert Siban MUNICIPA ODUCTION District mun cipality to the tsanyane Dis ct municipalit pumalanga p outh east, an ally Gert Siba nce at 31 846 district is ma nistration offi 1 Local munic

l Municipality

Luthuli

eseng

a

aligwa

ndo

Ka Seme

n Mbeki

AL

ce: Municipal the above cipalities.

nde District M AL FUNCTIO

TO BACKGR icipality is b e south west

strict municip ty to the nor province, Am nd Swaziland ande District 6 km2, coveri ade of seven ces of these cipalities main

y Main A Loca

Caro

Balf

Stand

Erm

Piet R

Volk

Secu

l Demarcatio table it is e

Municipality – 2 ONS, POPUL ROUND DAT bordered by t respectively palities to th rth east and

ajuba and Z to the east.

t municipality ing 40% of th (7) constitu

municipalitie n administrat

Admin ation

olina

four

derton

melo

Retief

srust

unda

n Board: Mu evident that

2011/12 Draft F LATION AND TA

the Ekurhu y both in Gau he south eas Nkangala Di Zululand Dist

y (GSDM) is he Mpumalan

ent local mu es are depicte

ion offices

Central Pla Index

1.03

1.20

2.98

3.60

2.15

1.29

3.08

unicipalities o Msukaligwa

t Annual Repo FOREWORD A

D ENVIRON

leni Metro t uteng provinc

st both in th strict munici rict municipa

the largest o nga province unicipalities, ed in table 1 b

ace Are

5

2

4

6

4

5

2

31 8

f South Africa a is the cen

ort CHAPTER ND EXECUTIV MENTAL OV

to the west ce, Northern he Free Sta pality to the alities in Kwa

of the three D

’s land mass their names below.

a ( km²)

5559

2616

4585

6017

4 882

5227

2 955

845, 87

a

ntral of all t

1 – MAYOR’S VE SUMMARY

VERVIEW

and Sedibe Free State te province, north respec azulu-Natal p

Districts in Mp s.

, spatial size

Average Den (Persons/km

34.91

20.99

19.88

20.99

21.8

12.61

91.03

27.97

the 7 consti

19 eng District

and Thabo Ehlanzeni ctively both province to

pumalanga

e and main

nsity m²)

tuent local

(20)

POPU Accor just f popul comp munic munic Gova the pr Table

Mun Gert

Alber

Msuk

Mkho

Pixle

Lekw

Dipa

Gova

Source The t than m revers indust

Gert Siban ULATION

rding to the 2 fewer than 3 ation has gro ared to the M cipalities like cipal populat n Mbeki (2.8 rovincial aver

2 GSDM Popu

nicipalities Sibande

rt Luthuli

kaligwa

ondo

ey Ka Seme

wa

leseng

an Mbeki

e: GSDM IDP rend with reg males in all t sed. The re tries, which l

nde District M 2009 populat 30% of the own by almo Mpumalanga e Mkhondo g tion followed 8%). Dipalese rage which is ulation

GSDM 2001 926,540 9

189,276 1

129,086 1

125,371 1

82,696

107,163 1

39,722

253,226 2

2011/12 direc gards the ge the municipa easons partic

argely emplo

Municipality – 2 tion estimate

Mpumalang ost over 2%

a and Nationa grew at an a d by Pixley eng (0.2%) a s understand

M population 2007 983,343 1,0

191,035 19

148,249 15

146,694 15

93,593 9

120,578 12

39,829 3

292,256 30

ctorate (region ender distribu alities with th

cularly in G oys more as

2011/12 Draft F es Gert Siban ga populatio

between 199 al rates of 1.

annual avera Ka Seme (2 and Albert Lu dable conside

P

2009 1

054,543 3

91,413 1

52,443 3

51,222 4

95,910 3

23,486 3

39,893 0

00,177 4

nal explorer 52 ution within t he exception Govan Mbeki per dictate o

t Annual Repo FOREWORD A

nde is home on. As depic

96 and 2009 .3% and 1.2%

age rate of 3 2.4%), Msuk thuli (0.3%) ering their rur

Population gro rates 997 1996 .3% 2.

.0% 0.3

.9% 2.6

.9% 3.

.8% 2.4

.5% 2.3

.8% 0.2

.3% 2.8

24 (2.3e) 2010) the District re of Lekwa an i may be d

f the nature o

ort CHAPTER ND EXECUTIV e to 1,054,54 cted in the

at an avera

% respective 3.1% making kaligwa (2.6%

population g ral nature.

owth M

6-2009 200

1% 1

3% 0.

6% 0.1

1% 0.1

4% 0.0

3% 0.1

2% 0.0

8% 0.2

)

eflects that t nd Govan Mb

ue economi of work that m

1 – MAYOR’S VE SUMMARY 3 people acc

table below ge annual ra ely. In the sa g it the faste

%), Lekwa ( rowth rates w

unicipal popu contributio 01 2007 1 1

2 0.19

14 0.15

14 0.15

09 0.10

12 0.12

04 0.04

27 0.30

here are mo beki where th

c opportunit must be done

20 counting to w, GSDM’s

ate of 2.1%

ame period, est growing (2.3%) and were below

ulation on

2009 1

0.18

0.15

0.14

0.09

0.12

0.04

0.28

ore females his trend is ties at the e.

(21)

Table

Source From devel buildin preva AGE / The a dynam educa such provis Figure 69.8%

29 ye 0 to 0 popul

Gert Siban 3 Population

e: GSDM IDP the above opment initia ng a non-ra alent in the D / GENDER D age and gen mic. The sha ational provis as the elderl sion of social e 1 below pr

% per cent of ears, 23.7% w

04 years repr ation in the D

nde District M Gender Distr

Gert Sib Albert L Msukali Mkhond Pixley K Lekwa L Dipales Govan M 2011/12 direc

table it can atives within cial and non istrict toward DISTRIBUTIO nder distribut ape of the ag sion for youn ly and childre l security ser rovides evide f the district p were between resents the m District.

Municipality – 2 ibution

P

Area

bande DM Luthuli LM

igwa LM do LM Ka Seme LM

LM eng LM Mbeki LM ctorate (region n be deduce

the District m n-sexist soci ds ensuring a

ON

tion of the p ge distribution ger children, en, employm rvices such a ence that the population. In n 30 and 49 most populou

2011/12 Draft F Population D Population

Male 517766 90882 74524 73756 45956 62609 19783 150257 nal explorer 52 ed that 51%

must continu iety, and ad a transformed

population is n is an indica , health care ment opportun as pension an e youth coho n 2010, 61.6

years and 14 us age group

t Annual Repo FOREWORD A Details

'000 2009/10 Female 6 536777

1005311 77918 77466 49954 60877 20110 7 149920 24 (2.3e) 2010)

% of the Dis ue to be inclu dress the is d and an inte

s a key dete ation of both for the whol nities for thos nd assistance ort (0-34 yea 6% of the GS 4.7% was 50 p with 127 29

ort CHAPTER ND EXECUTIV 0

Total 1054543 1 191413

152442 151222 95910 123486 39893 300177 )

stricts popula usive and be ssue of gend grated socie

erminant of p current and e population se in the eco e to those in ars) constitute SDM populati 0 years and o 97 individuals

1 – MAYOR’S VE SUMMARY ation is fem e based on t der inequalit

ty.

population ch future needs and vulnera onomic age g

need.

ed the large ion was betw older. The ag

s or some 11

21 male, whilst

the spirit of ty currently

hange and s regarding able groups groups, and

st share of ween 0 and ge cohort of 1.9% of the

(22)

Figure

Sourc GSDM the m relate

• A d d

• T

s t

• T

s

• T

a i

GINI C Gini-c acros house house

Gert Siban e 1 Distributio

ce: GERT SIB M population majority and t ed implication

A relatively h development developing th The concent services ena owards youth The youth, in social and ec The future siz ability of the mportantly, t

Co-EFFICIEN coefficient is ss the popula

eholds earn eholds earn n

nde District M on Table

BANDE SEP n exhibits ma there is a rel ns for socio-e

igh number o , basic educ he communiti tration of the

bling ease o h which may n particular conomic defic

ze and quali GSDM to d o retain thes

NT

summary sta ation. The G equal incom nothing).

Municipality – 2 P 2011

any of the na atively high economic dev

of people be cation, sport ies within GS e economica f access to e y include inten young wome cit and most o ty of the eco develop and e skills within

atistic of inco Gini-coefficien me) to 1 (in t

2011/12 Draft F ational popu

population d velopment w

low age 14 d s developme SDM;

ally active p employment nsive skills d en are cons often at risk o onomically ac

advocate fo n the District

ome inequalit nt varies fro the case whe

t Annual Repo FOREWORD A

lation charac dependency.

hich include:

denotes that ent and recr

population be and econom evelopment, idered to be of contracting ctive populat

r the approp municipality

ty and is use m 0 (in the ere one hou

ort CHAPTER ND EXECUTIV cteristics. Wo

These chara

provision for reation must

elow age 35 mic opportuni

on the job tr e more vulne

g HIV/AID’s.

tion will depe priate and re where pract

ed to show th case of per usehold earn

1 – MAYOR’S VE SUMMARY omen and yo acteristics ha

r health, early t be given a

5 implies tha ities must ref raining etc;

erable leadin

end in large equisite skills

tically possib

he skewness rfect equality s all income

22 outh are in ave several

y childhood a priority in

at life skill flect a bias

ng them to

part on the s and most

le.

s of income y where all e and other

(23)

Figure

Sourc Figure Of the distrib Dipale POVE Pover the po house incom

Gert Siban e 2 Gini-coeffic

ce: Global Ins e 2 illustrates e seven loca bution follow

eseng (0.611 ERTY

rty rate is de overty incom ehold and it me would be r

nde District M cient in Gert S

sight – ReX, s that Gini-co al municipal wed by Dr P

1) had better

escribed as t me. Poverty in

varies accor required to k

Municipality – 2 Sibande and i

August 2011 oefficient in t

ities in the D Pixley ka Isa

equal incom

the percenta ncome is de rding to the keep its mem

2011/12 Draft F ts local munic

1

the GSDM de District, Msu aka Seme (0 me distribution

ge of people efined as the household s bers out of p

t Annual Repo FOREWORD A

cipalities, 199

eteriorated fr kaligwa (0.6 0.648) whils ns in 2010.

e living in ho minimum m size, i.e the l poverty.

ort CHAPTER ND EXECUTIV 6 – 2010

rom 0.606 in 650) had the t Chief Albe

ouseholds wit monthly incom larger the ho

1 – MAYOR’S VE SUMMARY 1996 to 0.65 e most skew

ert Luthuli (0

th an income me needed to ousehold the

23 50 in 2010.

wed income 0.589) and

e less than o sustain a e larger the

(24)

Figure

Sourc Accor requir month same With r

% in seven follow the hi Table

Y

2006 2007 2008

Gert Siban e 3 Poverty rat

ce: Global Ins rding to the re a monthly hly poverty in

as the provi reference to 2010. This n Local mun wed by Lekwa

ghest povert 4 Socio Econo

Year H

Ba pro

d 6/07

7/08 8/09

nde District M tes in Mpuma

sight – ReX, Bureau for M y poverty inc

ncome of R3 ncial average the same sta is higher tha nicipalities in

a (46.7%) wh ty rates omic Status

Housing acklog as oportion of

current demand

19%

20%

21%

Municipality – 2 alanga and Ge

August 2011 Market Rese come of R2,5 3,538. GSDM

e (3.7) but sl atistics pover an the provin

the District hilst Mkhond

Unemployme Rate

2 2 2 Soc

2011/12 Draft F ert Sibande, 19

1

earch (BMR), 544 whilst a M recorded a ightly higher rty levels in th ncial poverty t, Govan Mb o (69.7%) an

ent Propor House with Inco 22%

23%

24%

cio Econom

t Annual Repo FOREWORD A

996 – 2010

, in 2010, a household o an average s r than the nat he GSDM inc y rate of 45.8 beki (34.8%)

nd Dr Pixley

tion of eholds h no ome

Pro Pop

Low Em 26%

26%

26%

ic Status

ort CHAPTER ND EXECUTIV household o of seven me

ize of house tional averag creased from 8 % recorde ) recorded th

Ka Isaka Se

portion of pulation in w-skilled ployment 44%

48%

52%

1 – MAYOR’S VE SUMMARY of four memb

mbers would hold of 3.7 w ge (3.6).

m 43.6% in 19 ed in 2010. A

he lowest po eme (54.3%)

HIV/AIDS Prevalence

10%

15%

20%

24 bers would d require a which is the

996 to 48.6 Among the overty rate ) registered

Illiterate people older than

14 years 27%

37%

44%

T1.2.4

(25)

1.3.

SERV 1.3.1 The G to co- servic opera GSDM The G suppo Imple Bulk a suppo Fundi Water GSDM Accel Regio An av Finan the bu 1.3.2 The W and w munic In ter maste Plann plann zone determ years devel mediu list of phasi remai the 20

Gert Siban SERVICE VICE DELIVE

Capital Dev Gert Sibande -ordinate an ces. In addit ation on vario

M, DWA and GSDM suppo ort, Capital mentation of and Reticula ort with Bulk ing was alloc r & Sanitation M Direct Alloc erated Infras onal Bulk Infr

verage expe ncial Year. Th ulk of these p Water Serv Water Service water quality

cipalities with ms of Planni er plan. The ning Overview

ing, the com of supply, O mining the in s. Sections 6 opment of b um and long

f projects w ng in of bulk ining useful l 012/13 financ

nde District M E DELIVERY ERY INTROD velopment In e District Mun d integrates ion to that G ous issues in

CoGTA.

orts the LM’

project im f the Regiona

tion, Upgrad Electrificatio cated as follo n Support cations structure Prog rastructure

enditure of he balance o projects will b vice Suppor es Support d testing divisi h these servic

ing the GSD e firs

Referensi

Dokumen terkait