• Tidak ada hasil yang ditemukan

http://www.jatit.org/volumes/Vol70No1/13Vol70No1.

N/A
N/A
Protected

Academic year: 2017

Membagikan "http://www.jatit.org/volumes/Vol70No1/13Vol70No1."

Copied!
11
0
0

Teks penuh

Loading

Gambar

Figure 1: Stages of SI Performance Evaluation Researc Logistics SWCU
Table 1. RACI Chart based on Respondent
Figure 2: Organizational Structure of the Office of the Vice Rector II SWCU Salatiga
Table 4. Mapping IT Processes, IT Objectives and
+2

Referensi

Dokumen terkait

ESB is one of SOA pillars besides WS and BPEL. ESB is an infrastructure for SOA service connection and message exchange. The main function of ESB is routing, protocol and

Novita [7] analyzes variables that explain acceptance level of open-source object-oriented programming language (Java language). She demonstrates that the easier IT,

optimal level of provision for public goods The level at which resources are drawn from the production of other goods and services only to the extent that people want the

The objectives of this study are to examine the relationship between provision of adequate fund, facilities and infrastructures, appointment of educational expert and management of

The challenges of Cloud Computing Adoption for SMEs Challenges Description Data management • Issues relating to the protection, confidentiality, laws and enforcement of data in

Table 1.Results of qualitative content analysis, the concerns of women with epilepsy about pregnancy: Theme Categories Subcategories Concerns about unbridled pregnancy Resilience

공공재의 공급효율성과 정치적 참여를 고려한 지방정부의 적정규모 도출: 자치구에 대한 적용* 최병호**․이근재***․정종필****8 The Optimal Size of Local Government Which Considers an Efficiency in Public Service Provision and Political

Assessment of indicators S2 of Productive Skills Training 1 Productive skills training is considered slightly more important than the provision of business facilities, where the