• Tidak ada hasil yang ditemukan

1.20.09.21 KECAMATAN AMPELGADING

N/A
N/A
Protected

Academic year: 2017

Membagikan "1.20.09.21 KECAMATAN AMPELGADING"

Copied!
1
0
0

Teks penuh

Loading

Referensi

Dokumen terkait

[r]

(1988) we develop a rationale for the use of factors, such as the election Õ s timing and outcome, the country Õ s economic performance and the degree of political, economic, and

Following the ap- proach suggested in Mester (1996) we show that if risk and quality factors are not taken into account optimal bank size tends to be overstated. That is, optimal

One reason why the number of simulations for the Monte Carlo method must be so high is that in order to determine the VaR, only the 1% level is important. As a consequence, only a

1,376,200,000.00,- (Satu Milyar Tiga Ratus Tujuh Puluh Enam Juta Dua Ratus Ribu Rupiah).. Demikian untuk diketahui dan

Tujuan penelitian ini untuk menjelaskan bagaimana efektivitas sistem informasi pelayanan yang sudah diaplikasikan pada instalasi rawat jalan rumah sakit umum daerah

Hasil Uji koefisien determinasi ( Adjusted R Square ) menunjukkan bahwa IHSG dipengaruhi oleh tingkat bunga, nilai kurs, harga emas dan harga minyak dunia

Hasil penelitian ini tidak sejalan dengan penelitian Susanty (2011) bahwa sangat menguntungkan bagi sebuah perusahaan yang mempunyai produk dengan merek yang memiliki