June 02, 2017 PT. Perentjana Djaja Kasatker PAP2PHLN Pengajuan Pengunduran Diri
Personnel Community
Development Officer (Drs.
Yakobus Julianus) dari Proyek CTC Winrip
June 05, 2017 SSE Package 15 GS Package 15 Penyampaian Ke 2x Temuan
TFAC yang belum ditindak lanjuti sampai saat ini
June 05, 2017 SSE Package 05 Kontraktor Paket 05 Suling Air Pada Pasangan
Batu/Saluran
June 05, 2017 SSE Package 05 Kontraktor Paket 05 Sistem Monitoring di AMP
June 05, 2017 Ketua Tim Teknis
Pengawasan Rock Excavation
Kasatker PJN II Sumatera Utara, et al
Undangan Rapat Pembahasan Evaluasi Hasil Blasting Paket 05
June 06, 2017 SSE Package 05 Team Leader DSC
WINRIP
Monthly Progress Report No. 23, Period of May 2017
June 06, 2017 Direktur Jenderal
Bina Marga
Kepala BBPJN II Medan
Persetujuan Penambahan Item Baru Paket 15 Sibolga Bts. Tapsel (WINRIP)
June 06, 2017 SSE Package 05 PPK Sibolga, Cs Test Case SCM IV
June 07, 2017 GS Package 14 SSE Package 14 Uji Laboratorium Sampel
Bitumen Aspal
June 07, 2017 Direktur Preservasi
Jalan
Direktur Pengembangan Jaringan Jalan
Permohonan Perubahan Nilai Kontrak Paket 17 Sp. G. Kemala Pugung Tampak di Provinsi Lampung; WINRIP IBRD Loan No. 8043-ID
June 07, 2017 Direktur Preservasi
Jalan
Direktur Pengembangan Jaringan Jalan
Penyampaian Rencana Kerja
Pengelolaan dan Pemantauan Lingkungan (RKPPL) pada Paket
16: Seblat Ipuh, Laporan
Pelaksanaan Monitoring UKL & UPL pada Paket 20: Lubuk Alung Sicincin dan Paket 21: Lubuk Alung Kuraitaji, dan Laporan Monitoring Pelaksanaan RKPPL (Quarterly) 05, 07, 08,11, 12, 13, 14, 15, 16 dan 17; WINRIP IBRD Loan No. 8043-ID
June 07, 2017 Direktur Preservasi
Jalan
Direktur Pengembangan
Penyampaian Laporan
! "#$% &$ ' ( ) *) +
Jaringan Jalan pada Paket 12: Kambang
-Indrapura dan Paket 07:
Indrapura Tapan di Provinsi Sumatera Barat; WINRIP IBRD Loan No. 8043-ID
June 07, 2017 Team Leader DSC
WINRIP
GS Package 05 Instruction of the Provisional
Sum Regarding the Geotechnical Investigation and the Design of Cutting Slope of Excavation of Package No. 05 June 08, 2017 Direktur Pengembangan Jaringan Jalan Direktur Preservasi Jalan
Percepatan Penyerapan Loan WINRIP; WINRIP IBRD Loan No. 8043-ID
June 08, 2017 Kasatker PAP2PHLN PT. Perentjana Djaja,
Yongma Engineering Co Ltd, PT. Epadascon Permata Engineering Consultants, JV/JO
Penyampaian Hasil CV Lut S.A
Sadaryo Sebagai Community
Development Officer
June 08, 2017 Direktur Preservasi
Jalan
Kepala BPJN III Padang
Penyampaian Persetujuan Bank
Dunia Tentang Laporan
Monitoring Pelaksanaan LARAP Paket No. 13: Sp. Rukis Tj. Kemuning di Provinsi Bengkulu; WINRIP IBRD Loan 8043-ID
June 08, 2017 Direktur Preservasi
Jalan
Kepala BBBPJN II Medan, BBPJN V Palembang dan BPJN III Padang
Percepatan Penyerapan Loan WINRIP; WINRIP IBRD Loan No. 8043-ID June 08, 2017 Direktur Pembangunan Jalan Direktur Pengembangan Jaringan Jalan
Penyampaian Revisi Hasil
Klarifikasi Kontrak serta Draft Kontrak Pekerjaan Technical Assistance for Development of Slope Stabilization, Design and Management, WINRIP Loan IBRD 8043-ID
June 09, 2017 SSE Package 15 Team Leader DSC
WINRIP
Monthly Progress Report No. 18, Period of May 2017
June 09, 2017 SSE Package 14 Team Leader DSC
WINRIP
Monthly Progress Report (MPR) No. 09, April 2017
June 09, 2017 SSE Package 14 Team Leader DSC
WINRIP
Monthly Progress Report (MPR) No. 10, May 2017
June 09, 2017 Director of Road
Network Development
World Bank Submission of LARAP
Implementation Monitoring
Report for Package No. 07: Indrapura - Tapan and Package No. 12: Kambang Indrapura in
West Sumatera Province;
WINRIP Loan IBRD 8043-ID
June 09, 2017 Director of Road
Network
World Bank Submission of RKPPL Document
, -./ 0123 42 5 6 .7 87 .9
Development Implementation Monitoring
Reports for Package No. 20 and No. 21, and RKPPL Quarterly
Implementation Monitoring
Report for Packages No. 05, 07, 08, 11, 12, 13, 14, 15, 16 and 17; WINRIP Loan IBRD 8043-ID
June 09, 2017 Direktur
Pengembangan Jaringan Jalan
Direktur Preservasi Jalan
Laporan Tindak Lanjut Hasil Temuan TFAC; WINRIP Loan IBRD 8043-ID
June 12, 2017 Ketua Pelaksana
Harian PMU WINRIP
Team Leader CTC WINRIP, et al
Undangan Rapat Koordinasi
Penyiapan DELH dan IPPKH Paket No. 05: Sp. Rampa Poriaha di Provinsi Sumatera Utara; Loan WINRIP 8043-ID
June 12, 2017 SSE Package 08 Team Leader DSC
WINRIP
Monthly Progress Report (MPR) No. 14, Period of May 2017
June 13, 2017 Direktur
Pengembangan Jaringan Jalan
Direktur Preservasi Jalan
Perubahan Nilai Kontrak Paket No. 17: Sp. Gunung Kemala Pg. Tampak di Provinsi Lampung; WINRIP Loan IBRD 8043-ID
June 13, 2017 Team Leader DSC
WINRIP
Team Leader CTC WINRIP
Re- Process Amendment of Time Extension For Several WINRIP Packages
June 13, 2017 SSE Package 21 Team Leader DSC
WINRIP
Laporan Bulanan No. 09, Periode Mei 2017
June 15, 2017 World Bank Director of Road
Network Development
Revised Minutes of Clarification and Draft Contract Negotiation for Technical Assistance for Development of Stabilization,
Design and Management;
WINRIP Loan IBRD 8043-ID
June 15, 2017 Direktur
Pengembangan Jaringan Jalan
Direktur Preservasi Jalan
Permintaan Dokumen Serah
Terima Sementara/Taking Over; WINRIP Loan IBRD 8043-ID
June 15, 2017 Direktur
Pengembangan Jaringan Jalan
Direktur Preservasi Jalan, et al
Undangan Rapat Koordinasi
Percepatan Penyelesaian Paket
Paket WINRIP; Loan WINRIP
8043-ID
June 15, 2017 SSE Paket 14 GS Paket 14 Hasil Inspection World Bank hari
Sabtu 25 Maret 2017
June 16, 2017 SSE Paket 05 Kontraktor Paket 05 Menyambut Hari Lebaran
June 16, 2017 World Bank Director of Road
Network Development
Revised Minutes of Clarification and Draft Contract Negotiation for Technical Assistance for Development of Stabilization,
: ;<= >?@A B@ C D <E FE <G
Design and Management
June 19, 2017 Kepala BPJN III
Padang
Direktur Jenderal Bina Marga
Persetujuan Prinsip
Perpanjangan Waktu Paket 13
Sp. Rukis Tj. Kemuning
(WINRIP)
June 19, 2017 Director of Road
Network Development
World Bank Submission of Interim Financial
Report (IFR) for January - March 2017; WINRIP Loan IBRD 8043-ID
June 19, 2017 Direktur
Pengembangan Jaringan Jalan
Direktur Preservasi Jalan
Loan Closing Date WINRIP; WINRIP Loan IBRD 8043-ID
June 20, 2017 Direktur
Pengembangan Jaringan Jalan
Direktur Preservasi Jalan
Percepatan Pengadaan Tanah pada 4 Paket WINRIP
June 20, 2017 Kasatker PJN Wil I
Sumatera Barat
PPK 1.5 Persetujuan Justifikasi Teknik
Paket 21 Lubuk Alung Kuraitaji WINRIP IBRD Loan 8043-ID
June 20, 2017 Kepala BBPJN II
Medan
Direktur Preservasi Jalan
Permohonan Persetujuan Usulan Perubahan Kontrak Paket 05. Sp.
Rampa Poriaha (WINRIP IBRD
Loan No. 8043-ID)
June 20, 2017 Direktur Preservasi
Jalan
Kepala BPJN III Padang
Laporan Tindak Lanjut Hasil Temuan TFAC pada Paket 02:
Padang Sawah Sp. Empat,
Paket 03: Manggopoh Padang
Sawah, dan Paket 20: Lubuk
Alung Sicincin di Provinsi
Sumatera Barat; WINRIP IBRD Loan 8043-ID
June 21, 2017 World Bank Director of Road
Network Development
Transmission of Quality (TFAC) Report for Package 5: Simpang Rampa-Poriaha June 21, 2017 Direktur Pengembangan Jaringan Jalan Direktur Pembangunan Jalan
Penyampaian Surat Bank Dunia Terkait Revisi Hasil Klarifikasi Kontrak serta Draft Kontrak Pekerjaan TA for Development of Stabilization, Design and Management; WINRIP Loan IBRD 8043-ID
June 21, 2017 World Bank Director of Road
Network Development
Transmission of Quality (TFAC) Report for Package 15: Sibolga Batas Tapsel June 22, 2017 Direktur Pengembangan Jaringan Jalan Direktur Preservasi Jalan
Penyampaian Notulen Rapat
Koordinasi Percepatan
Penyelesaian Paket-Paket
H IJK LMNO PN Q R JS TS JU
June 22, 2017 Ketua Pelaksana
Harian PIU WINRIP
Direktur Pengembangan Jaringan Jalan, et al
Undangan Rapat Pembahasan Perpanjangan Waktu pada Paket No. 13: Sp. Rukis Tj. Kemuning di Provinsi Bengkulu; WINRIP IBRD Loan No. 8043-ID
June 22, 2017 Ketua Pelaksana
Harian PIU WINRIP
Direktur Pengembangan Jaringan Jalan, et al
Undangan Rapat Pembahasan Usulan Perubahan Kontrak Paket
05: Sp. Rampa Poriaha di
Provinsi Sumatera Utara; WINRIP IBRD Loan No. 8043-ID
VKWN MJXYZO S[[SN\
H IJK LMNO PN Q RJS TSJU
June 06, 2017 SSE Package 05 Team Leader DSC
WINRIP
Monthly Progress Report No. 23, Period of May 2017
June 07, 2017 Direktur Preservasi
Jalan
Direktur Pengembangan Jaringan Jalan
Penyampaian Rencana Kerja
Pengelolaan dan Pemantauan Lingkungan (RKPPL) pada Paket
16: Seblat Ipuh, Laporan
Pelaksanaan Monitoring UKL & UPL pada Paket 20: Lubuk Alung Sicincin dan Paket 21: Lubuk Alung Kuraitaji, dan Laporan Monitoring Pelaksanaan RKPPL (Quarterly) 05, 07, 08,11, 12, 13, 14, 15, 16 dan 17; WINRIP IBRD Loan No. 8043-ID
June 07, 2017 Direktur Preservasi
Jalan
Direktur Pengembangan Jaringan Jalan
Penyampaian Laporan
Monitoring Pelaksanaan LARAP
pada Paket 12: Kambang
-Indrapura dan Paket 07:
Indrapura Tapan di Provinsi
Sumatera Barat; WINRIP IBRD Loan No. 8043-ID
June 09, 2017 SSE Package 15 Team Leader DSC
WINRIP
Monthly Progress Report No. 18, Period of May 2017
June 09, 2017 SSE Package 14 Team Leader DSC
WINRIP
Monthly Progress Report (MPR) No. 09, April 2017
June 09, 2017 SSE Package 14 Team Leader DSC
WINRIP
Monthly Progress Report (MPR) No. 10, May 2017
June 09, 2017 Director of Road
Network Development
World Bank Submission of LARAP
Implementation Monitoring
Report for Package No. 07: Indrapura - Tapan and Package No. 12: Kambang Indrapura in West Sumatera Province; WINRIP Loan IBRD 8043-ID
June 09, 2017 Director of Road
Network
World Bank Submission of RKPPL Document
] ^_` ab cd e c f g _h ih_j
Development Implementation Monitoring
Reports for Package No. 20 and No. 21, and RKPPL Quarterly
Implementation Monitoring
Report for Packages No. 05, 07, 08, 11, 12, 13, 14, 15, 16 and 17; WINRIP Loan IBRD 8043-ID
June 09, 2017 Direktur
Pengembangan Jaringan Jalan
Direktur Preservasi Jalan
Laporan Tindak Lanjut Hasil Temuan TFAC; WINRIP Loan IBRD 8043-ID
June 12, 2017 SSE Package 08 Team Leader DSC
WINRIP
Monthly Progress Report (MPR) No. 14, Period of May 2017
June 13, 2017 SSE Package 21 Team Leader DSC
WINRIP
Laporan Bulanan No. 09, Periode Mei 2017
June 19, 2017 Director of Road
Network Development
World Bank Submission of Interim Financial
Report (IFR) for January - March 2017; WINRIP Loan IBRD 8043-ID
June 20, 2017 Direktur Preservasi
Jalan
Kepala BPJN III Padang
Laporan Tindak Lanjut Hasil
Temuan TFAC pada Paket 02:
Padang Sawah Sp. Empat, Paket
03: Manggopoh Padang Sawah,
dan Paket 20: Lubuk Alung Sicincin di Provinsi Sumatera Barat; WINRIP IBRD Loan 8043-ID
June 21, 2017 World Bank Director of Road
Network Development
Transmission of Quality (TFAC) Report for Package 5: Simpang Rampa-Poriaha
June 21, 2017 World Bank Director of Road
Network Development
Transmission of Quality (TFAC) Report for Package 15: Sibolga Batas Tapsel
k``_hlm
] ^_` ab cd e c f g _h ih_j
June 05, 2017 Ketua Tim Teknis
Pengawasan Rock Excavation
Kasatker PJN II Sumatera Utara, et al
Undangan Rapat Pembahasan Evaluasi Hasil Blasting Paket 05
June 12, 2017 Ketua Pelaksana
Harian PMU WINRIP
Team Leader CTC WINRIP, et al
Undangan Rapat Koordinasi
Penyiapan DELH dan IPPKH Paket No. 05: Sp. Rampa Poriaha di Provinsi Sumatera Utara; Loan WINRIP 8043-ID June 15, 2017 Direktur Pengembangan Jaringan Jalan Direktur Preservasi Jalan, et al
Undangan Rapat Koordinasi
Percepatan Penyelesaian Paket
Paket WINRIP; Loan WINRIP
8043-ID
June 22, 2017 Ketua Pelaksana
Harian PIU WINRIP
Direktur Pengembangan Jaringan Jalan, et al
Undangan Rapat Pembahasan Perpanjangan Waktu pada Paket No. 13: Sp. Rukis Tj. Kemuning
n opq rs tu v t w x py zyp{
di Provinsi Bengkulu; WINRIP IBRD Loan No. 8043-ID
June 22, 2017 Ketua Pelaksana
Harian PIU WINRIP
Direktur Pengembangan Jaringan Jalan, et al
Undangan Rapat Pembahasan Usulan Perubahan Kontrak Paket
05: Sp. Rampa Poriaha di
Provinsi Sumatera Utara; WINRIP IBRD Loan No. 8043-ID
|} ~ ~ ~
June 02, 2017 Team Leader CTC
WINRIP
Team Leader DSC WINRIP
Process of Amendment of Time Extension for Several WINRIP Packages
June 02, 2017 Team Leader CTC
WINRIP
Officer in Charge PMU WINRIP
Submission of RKPPL Document for Package No. 16: Seblat Ipuh, UKL&UPL Implementation Monitoring Reports for Package No. 20: Lubuk Alung Sicincin and No. 21: Lubuk Alung Kuraitaji, and RKPPL Quarterly
Implementation Monitoring
Report for Packages 05, 07, 08, 11, 12, 13, 14, 15, 16 and 17; WINRIP
June 02, 2017 Team Leader CTC
WINRIP
Officer in Charge PMU WINRIP
Recommendation of Variation Order for Package No. 17: Sp.
Gunung Kemala Pugung
Tampak in Lampung Province; WINRIP
June 08, 2017 Team Leader CTC
WINRIP
Officer in Charge PMU WINRIP
Recommendation of Variation Order for Package No. 17: Sp.
Gunung Kemala Pugung
Tampak in Lampung Province; WINRIP
June 12, 2017 Team Leader CTC
WINRIP
Team Leader DSC WINRIP
Executive Summary Report
(ESR) June 2017 and Monthly Progress Meeting DSC and CTC; WINRIP
June 13, 2017 Team Leader CTC
WINRIP
Officer in Charge PMU WINRIP
Submission of Site Visit Report for Packages No. 05: Sp. Rampa
Poriaha and
No. 15: Sibolga Bts. Tapsel in
North Sumatera Province;
WINRIP
June 13, 2017 Team Leader CTC
WINRIP
Officer in Charge PMU WINRIP
Submission of HIV/AIDS
Socialization Implementation Report for Package No. 16:
Sebelat Ipuh; WINRIP IBRD
Loan 8043-ID
June 14, 2017 Team Leader CTC
WINRIP
Officer in Charge PMU WINRIP
Submission of Interim Financial Report (IFR) WINRIP Period of
January March 2017
June 14, 2017 Team Leader CTC
WINRIP
Director of Road Preservation
Submission of LARAP
Implementation Monitoring
Reports for Packages No. 14: Painan Kambang and No. 15:
¡ ¢ £¤ ¥¤ ¦
Sibolga Bts. Tapsel; WINRIP
Loan IBRD
No. 8043-ID
June 16, 2017 Team Leader CTC
WINRIP
Officer in Charge PMU WINRIP
Submission of Site Visit Report for Packages No. 08: Batas
Pariaman Manggopoh, No. 07:
Indrapura - Tapan and No. 12:
Kambang Indrapura in West
Sumatera Province; WINRIP
June 19, 2017 Team Leader CTC
WINRIP Officer in Charge PMU WINRIP Technical Justification of Contract Amendment of Package No. 05:
Simpang Rampa Poriaha in
North Sumatera Province;
WINRIP
June 20, 2017 Team Leader CTC
WINRIP
Officer in Charge PMU WINRIP
Recommendation for Contract Time Extension of Package
No.13 Sp.Rukis - Tanjung
Kemuning, WINRIP IBRD Loan No.8043-ID
June 20, 2017 Team Leader CTC
WINRIP
Officer in Charge PMU WINRIP
Submission of Site Visit Report for Packages No. 13: Sp. Rukis
Tj. Kemuning in Bengkulu
Province and No. 17: Sp. Gn.
Kemala Pg. Tampak in
Lampung Province; WINRIP
June 20, 2017 Team Leader CTC
WINRIP
Team Leader DSC WINRIP
Monthly Progress Meeting with
The Consultants and The
Contractors, July 2017; WINRIP
June 21, 2017 Team Leader CTC
WINRIP
Officer in Charge PMU WINRIP
Submission of Report of
Coordination Result Regarding Action Plan for Completion of DELH and IPPKH Package No. 05: Sp. Rampa Poriaha, and
Monitoring of Base Camp
Management Improvement
Package No. 15: Sibolga Bts. Tapsel; WINRIP IBRD Loan 8043-ID
§¨ ©ª« ¤ ¬¬¤
¡ ¢ £¤¥¤¦
June 02, 2017 Team Leader CTC
WINRIP
Officer in Charge PMU WINRIP
Submission of RKPPL Document for Package No. 16: Seblat Ipuh, UKL&UPL Implementation Monitoring Reports for Package No. 20: Lubuk Alung Sicincin and No. 21: Lubuk Alung Kuraitaji, and RKPPL Quarterly
® ¯°± ²³´µ ¶ ´ · ¸ °¹º¹ °»
Implementation Monitoring
Report for Packages 05, 07, 08, 11, 12, 13, 14, 15, 16 and 17; WINRIP
June 13, 2017 Team Leader CTC
WINRIP
Officer in Charge PMU WINRIP
Submission of Site Visit Report for Packages No. 05: Sp. Rampa
Poriaha and
No. 15: Sibolga Bts. Tapsel in
North Sumatera Province;
WINRIP
June 13, 2017 Team Leader CTC
WINRIP
Officer in Charge PMU WINRIP
Submission of HIV/AIDS
Socialization Implementation Report for Package No. 16:
Sebelat Ipuh; WINRIP IBRD
Loan 8043-ID
June 14, 2017 Team Leader CTC
WINRIP
Officer in Charge PMU WINRIP
Submission of Interim Financial Report (IFR) WINRIP Period of
January March 2017
June 14, 2017 Team Leader CTC
WINRIP
Director of Road Preservation
Submission of LARAP
Implementation Monitoring
Reports for Packages No. 14: Painan Kambang and No. 15: Sibolga Bts. Tapsel; WINRIP
Loan IBRD
No. 8043-ID
June 16, 2017 Team Leader CTC
WINRIP
Officer in Charge PMU WINRIP
Submission of Site Visit Report for Packages No. 08: Batas
Pariaman Manggopoh, No. 07:
Indrapura - Tapan and No. 12:
Kambang Indrapura in West
Sumatera Province; WINRIP
June 20, 2017 Team Leader CTC
WINRIP
Officer in Charge PMU WINRIP
Submission of Site Visit Report for Packages No. 13: Sp. Rukis
Tj. Kemuning in Bengkulu
Province and No. 17: Sp. Gn.
Kemala Pg. Tampak in
Lampung Province; WINRIP
June 21, 2017 Team Leader CTC
WINRIP
Officer in Charge PMU WINRIP
Submission of Report of
Coordination Result Regarding Action Plan for Completion of DELH and IPPKH Package No. 05: Sp. Rampa Poriaha, and
Monitoring of Base Camp
Management Improvement
Package No. 15: Sibolga Bts. Tapsel; WINRIP IBRD Loan 8043-ID
¼½½¾¿ ÀÁ
 þ ½ ÄÅÆÇ È Æ É Ê¾¿Ë¿¾Ì
June 12, 2017 Team Leader CTC
WINRIP
Team Leader DSC WINRIP
Executive Summary Report
(ESR) June 2017 and Monthly Progress Meeting DSC and CTC; WINRIP
June 20, 2017 Team Leader CTC
WINRIP
Team Leader DSC WINRIP
Monthly Progress Meeting with
The Consultants and The