• Tidak ada hasil yang ditemukan

II. RUANG LINGKUP DAN METODE PENGHITUNGAN / COVERAGE AND METHODOLOGY

2.6 Konstruksi / Construction

Kategori Konstruksi adalah kegiatan usaha di bidang konstruksi umum dan konstruksi khusus pekerjaan gedung dan bangunan sipil, baik digunakan sebagai tempat tinggal atau sarana kegiatan lainnya. Kegiatan konstruksi mencakup pekerjaan baru, perbaikan, penambahan dan perubahan, pendirian prafabrikasi bangunan atau struktur di lokasi proyek dan juga konstruksi yang bersifat sementara. Kegiatan konstruksi dilakukan baik oleh kontraktor umum, yaitu perusahaan yang melakukan pekerjaan konstruksi untuk pihak lain, maupun oleh kontraktor khusus, yaitu unit

both at current prices and constant 2010 is by multiplying the output of each -Each year the ratio of value added.

Waste management calculations / Waste and income approach. In the worksheet management, waste disposal and cleaning is done by the government and private sectors. Activities undertaken by the government using APBN / APBD.

Sour e Produ tio is SAB - Su . Mi es a d E ergy statisti s, udget Mi istry of Fi a e ; Trash Output data o tai ed fro Su . IBS statisti s - BPS; Pri e data are o tai ed fro Statisti s Produ er Pri e Su - BPS; Fee Stru ture data o tai ed fro the A ual Sur ey of Water - BPS.

2.6Construction

Construction includes business activities in the field of general construction and specialized construction work for buildings and civil buildings, both used as a residence or other purposes. Construction activity includes new work, repair, additions and alterations, the erection of prefabricated buildings or structures on the site and also construction of a temporary nature. Construction activities undertaken by the general contractor, the company doing the construction work for the other party, or by

usaha atau individu yang melakukan kegiatan konstruksi untuk dipakai sendiri.

Hasil kegiatan konstruksi antara lain: Konstruksi gedung tempat tinggal; Konstruksi gedung bukan tempat tinggal; Konstruksi bangunan sipil, misal: jalan, tol, jembatan, landasan pesawat terbang, jalan rel dan jembatan kereta api, terowongan, bendungan, waduk, menara air, jaringan irigasi, drainase, sanitasi, tanggul pengendali banjir, terminal, stasiun, parkir, dermaga, pergudangan, pelabuhan, bandara, dan sejenisnya; Konstruksi bangunan elektrik dan telekomunikasi: pembangkit tenaga listrik; transmisi, distribusi dan bangunan jaringan komunikasi, dan sebagainya; Instalasi gedung dan bangunan sipil: instalasi listrik termasuk alat pendingin dan pemanas ruangan, instalasi gas, instalasi air bersih dan air limbah serta saluran drainase, dan sejenisnya; Pengerukan: meliputi pengerukan sungai, rawa, danau dan alur pelayaran, kolam dan kanal pelabuhan baik bersifat pekerjaan ringan, sedang maupun berat; Penyiapan lahan untuk pekerjaan konstruksi, termasuk pembongkaran dan penghancuran gedung atau bangunan lainnya serta pembersihannya; Penyelesaian konstruksi sipil seperti pemasangan kaca dan aluminium; pengerjaan lantai, dinding dan plafon gedung; pengecatan; pengerjaan interior dan dekorasi dalam penyelesaian akhir; pengerjaan eksterior dan pertamanan pada gedung dan bangunan sipil

specialized contractors, the business units or individuals who perform construction activities for their own use.

Result of construction activities include: Construction of buildings residence; Construction of non-residential buildings; Civil building construction, eg roads, highways, bridges, runways, railways and railway bridges, tunnels, dams, reservoirs, water towers, irrigation, drainage, sanitation, flood control embankment, terminal, station, park, pier, warehouses, ports, airports, and the like; Construction of electrical and telecommunication: power plant; transmission, distribution and communication network building, and so on; Building installation and civil buildings: electrical installations including air-conditioning and heating, gas installation, installation of water and sewage and drainage, and the like; Dredging: including dredging rivers, swamps, lakes and shipping lanes, the pool and the canal harbor good job is mild, moderate or severe; Preparing land for construction, including demolition and destruction of buildings or other structures and cleaning; Civil construction solutions such as the installation of glass and aluminum; construction of floors, walls and ceilings of buildings; painting; construction and interior decoration in the final settlement; exterior and landscaping work on the building and

lainnya; Penyewaan alat konstruksi dengan operatornya seperti derek lori, molen, buldoser, alat pencampur beton, mesin pancang, dan sejenisnya.

Metode yang digunakan untuk memperkirakan Ouput harga berlaku adalah metode ekstrapolasi dengan indeks konstruksi harga berlaku sebagai ekstrapolatornya. Untuk mendapatkan Output harga konstan, Output harga berlaku dideflasi dengan menggunakan IHPB konstruksi sebagai deflator. Sementara konsumsi antara didapat dengan menggunakan metode commodity flow beberapa komoditas utama dari konsumsi antara, misalnya produksi semen, kayu, juga bahan galian. NTB berlaku didapat dari nilai output berlaku dikurangi dengan biaya antara berlaku. Sementara NTB konstan didapat dari mengalikan output konstan dengan rasio NTB tahun dasar 2010.

Sumber data indikator produksi kayu log, bambu dan produk industri bukan migas dari Subdirektorat Neraca Barang-BPS; produksi aspal dari Statistik Perminyakan Indonesia (SPI) Ditjen Migas-Kementrian Energi dan Sumber Daya Mineral (ESDM); ekspor semen dari Subdirektorat Statistik Ekspor-BPS dan Asosiasi Semen Indonesia (ASI); impor semen dan bahan bangunan SITC 3 digit dari Subdirektorat Statistik Impor-BPS. Indikator harga berupa IHPB bahan bangunan dari Subdirektorat Statistik Harga Perdagangan Besar-BPS. Indeks konstruksi dari publikasi Statistik Konstruksi, Subdirektorat

other civil buildings; Construction equipment rental with an operator such as truck crane, molen, bulldozers, concrete mixers, machinery foundation, and the like.

The method used to estimate output at current prices is the extrapolation method of construction index extrapolating current prices. To get Output at constant prices, output at current prices are deflated using the wholesale price index as a deflator construction. While consumption among obtained by using commodity flow of some major commodities consumption between, for example the production of cement, wood, and minerals. NTB happen obtained from the output force is reduced by the applicable fee. While the value added at constant obtained from multiplying the output with ratio of value added at constant base year 2010.

Data source production indicators logs bamboo and industrial products instead of oil and gas from Sub - BPS Balance Sheet Items ; Petroleum bitumen production from Statistics Indonesia ( SPI ) Directorate General of Oil and Gas - Ministry of Energy and Mineral Resources ; cement exports from Sub - BPS export statistics and the Indonesian Cement Association ; import of cement and building materials SITC 3 digits of Sub - BPS Import statistics . WPI price indicators in the form of building materials Wholesale Price Statistics Sub - BPS Construction index of

Statistik Konstruksi-BPS.