PERJANJIAN VENTURA BERSAMA JOINT VENTURE AGREEMENT

Perjanjian ventura bersama antara lain, sebagai berikut: The joint venture agreement are follows:

Tuban,Aromatic/Aromatic of Tuban

PT Wijaya Karya (Persero) Tbk.- PT Adhi Karya (Persero) Tbk. Proyek Bendung Jati Gede/ Jati Gede Dam Project

Proyek TPPI Tuban Aromatic TPPI.1/ TPPI Tuban Aromatic of project TTPI.1 PT Wijaya Karya (Persero) Tbk. - PT IKPT - PT Adhi Karya (Persero) Tbk.

PT Wijaya Karya (Persero) Tbk. - PT IKPT - PT Adhi Karya (Persero) Tbk. Wika PP Sacna Panti Rao/Wika PP Sacna Panti Rao

Wika Mirai, Proyek Amandit/ Wika Mirai ,Amandit of Project PT Wijaya Karya (Persero) Tbk.- PT Nindya Karya (Persero) Proyek Kanjiro/ Kanjiro Project

PT Wijaya Karya (Persero) Tbk.- PT Nindya Karya (Persero) Proyek Bawakaraeng/ Bawakaraeng Project

PT Wika Karya (Perero) Tbk.- PT Bumi Karsa Proyek Pati - Rembang/Pati - Rembang Project

PT Wijaya Karya (Persero) Tbk - Adhi Karya (Persero) Tbk - PT Duta Graha Indah, Tbk.

Proyek Sungai Ular/Sungai Ular Project

Proyek Suramadu BT Tengah/ Suramadu Bridge Approach Project

45. 45.

Impairment of goodwill is the difference between the asset value at the reporting date compared to the present value of projected cash flows for 5 years at PT Wika Insan Pertiwi. Penurunan nilai goodwill adalah selisih antara nilai aset

pada tanggal pelaporan dibandingkan dengan nilai kini dari proyeksi arus kas selama 5 tahun pada PT Wika Insan Pertiwi.

9

33% - 40% - 27% Selesai/Finished 10

PT Wijaya Karya (Persero) Tbk. - PT Adhi Karya (Persero) Tbk.- PT

Waskita Karya (Persero) 32,75% : 34,5% : 32,75% Selesai/Finished

8

75%:25% Selesai/Finished

PT Wijaya Karya (Persero) Tbk - PT Waskita Karya (Persero) - PT Hutama Karya (Persero) - PT Pembangunan Perumahan (Persero) Tbk.

Berjalan/ In Progress 25%:25%:25%:25% 3 6 51%:49% Selesai/Finished 7 51%:49% Selesai/Finished 5

PT Wijaya Karya (Persero) Tbk. - PT Pembangunan Perumahan (Persero)

Tbk. - PT Sacna 15%:42%:43% Selesai/Finished

35%:30%;35% Selesai/Finished

4 Proyek TPPI Tuban Aromatic TPPI.2/ TPPI Tuban Aromatic of Project

35%:30%:35% Selesai/Finished

11

PT Wijaya Karya (Persero) Tbk - PT Waskita Karya - PT Hutama Karya

(Persero) - PT Adhi Karya (Persero) Tbk. 25%:25%:25%:25% Selesai/Finished

1

50%;50% Selesai/Finished

2

Perseroan melakukan perjanjian kerja sama dengan berbagai pihak sebagaimana tersebut pada masing-masing perjanjian, berupa penyerahan dana kepada Pengelola sesuai kewajiban yang tertuang dalam perjanjian kerja sama menurut porsi yang ditetapkan. Pengelola proyek dibentuk dengan anggota yang berasal dari masing-masing pihak yang melakukan perjanjian kerja sama.

The Company engaged in int operations agreement with other parties, as specified in each agreement in the form of providing funds to Management in charge of the project based on the obligations set forth in the cooperative agreement according to the specified portion agreed percentage. Management in charge of the project was formed made up of the members of each party to the cooperative agreement.

Pengelola proyek yang berasal dari Pemberi Kerja (Owner) dan bertanggung jawab sepenuhnya terhadap seluruh kegiatan tersebut termasuk laporan pertanggungjawaban keuangan dan proyek kepada masing-masing pihak yang melakukan perjanjian kerja sama.

Management in charge of the project constructed the project granted by the Employer (owner) and was fully responsible to complete all project activities, including preparing financial statement for each part to the cooperative agreement.

No Nama Project / Name of Project Porsi Bagi Hasil /

WIKA-Karka (Proyek Berau)/ WIKA-Karka (Berau Project) PT Wijaya Karya (Persero) Tbk - PT Karka Arganusa WIKA-Hazama (Proyek Sabo)/ WIKA-Hazama (Sabo Project) PT Wijaya Karya (Persero) Tbk. - PT Hazama

Proyek Sungai Kayang Bulungan/ Kayang Bulungan River Project PT Wijaya Karya (Persero) Tbk - PT Himpun Karya

Proyek Jln. Nintombong - Sarmi/ Nintombong - Sarmi Road Project PT Wijaya Karya (Persero) Tbk - PT Bumi Intan Perkasa

PT Wijaya Karya (Persero) Tbk - PT Hazama

Proyek Liang Anggang Pelahari/ Liang Anggang Pelahari Project PT Wijaya Karya (Persero) Tbk - Raden Panji Suprapto Proyek Pangkalan Bun/ Pangkalan Bun Project

PT Wijaya Karya (Persero) Tbk - PT Jaya Konstruksi Tbk. 60% - 40%

Proyek Cikro Girder/Cikro Girder Project

PT Wijaya Karya (Persero) Tbk - PT Nindya Karya (Persero)

Proyek jembatan Lintas Barat Sulsel/ Lintas Barat Sulsel Bridge Project PT Wijaya Karya (Persero) Tbk - PT Brantas Abipraya (Persero) - PT Mahir Proyek Bosem Morokembangan/ Bosem Morokembangan Project PT Wijaya Karya (Persero) Tbk - PT Adhi Karya (Persero) Tbk. Proyek Fly Over Cengkareng/Fly Over Cengkareng Project

Proyek Jalan MERR Surabaya/MERR Surabaya Road Project

PT Wijaya Karya (Persero) Tbk - PT Shimizu

PT Wijaya Karya (Persero) Tbk - PT Brantas Abipraya (Persero) - PT Waskita Karya (Persero)

Proyek Jabung Ring Dike/Jabung Ring Dike Project

PT Wijaya Karya (Persero) Tbk - PT Tokyu

Proyek Fly Over Casablanca/Casablanca Fly Over Project PT Wijaya Karya (Persero) Tbk - PT Jaya Konstruksi Tbk. 12 Selesai/Finished 51% : 49% 17 60% - 40% Selesai/Finished 18 Selesai/Finished 19 15 60% - 40% Selesai/Finished

16 Proyek Bendungan Sabo - Bawakaraeng/ Sabo Dam - Bawakaraeng Berjalan/ In

Progress 35% - 65% 13 35% : 65% Selesai/Finished 14 55% - 45% Selesai/Finished

No Nama Project / Name of Project Porsi Bagi Hasil /

Portion of share (%) Status / Status

23

PT Wijaya Karya (Persero) Tbk - PT Pembangunan Perumahan (Persero)

Tbk. - PT Kartikabhakti 33% - 34% - 33 % Selesai/Finished

49% - 51% Selesai/Finished

22

PT Wijaya Karya (Persero) Tbk - PT Pembangunan Perumahan (Persero) 49% - 51% Selesai/Finished

55% - 45% Selesai/Finished 20 Berjalan/ In Progress 42,5% - 32,5% - 25% 21 27 Berjalan/ In Progress PT Wijaya Karya (Persero) Tbk - PT Pembangunan Perumahan (Persero) 50% - 50%

Berjalan/ In Progress 33% - 34% - 33 %

26 Proyek Normalisasi Sungai Garang dan Banjir Kanal Barat/Garang River and West Kanal Float Control Project

PT Wijaya Karya (Persero) Tbk - PT Brantas Abipraya (Persero) - PT Waskita Karya (Persero)

Berjalan/ In Progress 33% - 33% - 34 %

24 Proyek Konstruksi Sabo dan Tanggul Gunung Merapi/Construction of Sabo

and Dam Merapi Mountain Project Selesai/Finished

37,5% - 62,5% 25 Proyek Waduk Serba Guna Jatibarang/ Jatibarang Multi Purpose Dam

28 Proyek Modifikasi Setasiun Cirebon, Perujakan/Modification Station of

Cirebon, Perujakan Project Selesai/Finished

45% - 55%

29 Berjalan/ In

Progress 51% - 49%

Proyek Stadion Utama Riau/ Main Stadium Riau Project

PT Wijaya Karya (Persero) Tbk - PT Adhi Karya (Persero) Tbk. Proyek Terminal Pulogebang/ Pulogebang Bus Station Project PT Wijaya Karya (Persero) Tbk - PT Jaya Konstruksi Tbk.

PT Wijaya Karya (Persero) Tbk - PT Teknik Umum Proyek PLTBS Sei Mangkei/ Sei Mangkei PLTBS Project PT Wijaya Karya (Persero) Tbk - PT Wika Insan Pertiwi

PT Wijaya Karya (Persero) Tbk - PT Mirlindo Padu Kencana

Proyek Acces Road Lot 1 PLTA Asahan/ Acces Road Lot 1 PLTA Asahan Project

PT Wijaya Karya (Persero) Tbk - PT Arta

Headworks and Main Irrigation System of Batang Anai Irrigation Sub Project PT Wijaya Karya (Persero) Tbk - PT Nindya Karya (Persero)

PT Wijaya Karya (Persero) Tbk - Hazama Corporation

PT Wijaya Karya (Persero) Tbk - PT Agung Kusuma Proyek Pelabuhan Tanjung Emas/ Tanjung Emas Port Project PT Wijaya Karya (Persero) Tbk - PT Asita

PT Wijaya Karya (Persero) Tbk - PT Tectonia - PT Inti Proyek Embung Lawe-lawe/ Lawe-lawe mini Dam Project PT Wijaya Karya (Persero) Tbk - PT Budi Indah Mulia M

PT Wijaya Karya (Persero) Tbk - PT Jasin - PT Bakti

32 Berjalan/ In

Progress 35% - 65%

33 Proyek Trafo 500/150 KV - 500 MVA GITET Cibatu/Extra High Voltage Trafo 500/150 KV - 500 MVA Cibatu Project

97,8% - 2,2% Selesai/Finished

30

PT Wijaya Karya (Persero) Tbk - PT Pembangunan Perumahan (Persero) Tbk.-PT Adhi Karya (Persero) Tbk.

Berjalan/ In Progress 20% - 49% - 31 %

31 Proyek Prasarana Olah Raga, Hambalang/ Hambalang Sport Fasilities Berjalan/ In

Progress 30% - 70%

38 Proyek Bendung Copong, Sub Proyek Irigasi Leuwi Goong/Copong Dam,

Irrigation Sub Project Leuwi Goong Berjalan/ In

Progress PT Wijaya Karya (Persero) Tbk - PT Pembangunan Perumahan (Persero) 49% - 51%

39 Proyek Pemipaan Air Limbah Denpasar/ Denpasar Sewage Drainage 36 Berjalan/ In Progress 60% - 40% 37 Berjalan/ In Progress 49% - 51% 34 Selesai/Finished 10% - 90% 35 Proyek PLTD 3 X 18 MW Pesanggaran, Bali/Diesel Power Plant 3 X 18

MW Pesanggaran, Bali Project Berjalan/ In

Progress 70% - 30%

No Nama Project / Name of Project Porsi Bagi Hasil /

Portion of share (%) Status / Status

43 Proyek Jembatan Sungai Kakap Pacitan - Hadiwarno/Sungai Kakap Pacitan - Hadiwarno Bridge Project

Berjalan/ In Progress 40% - 30% - 30 % 44 Berjalan/ In Progress 51%- 49% 41 Berjalan/ In Progress 70% - 30% 42 Berjalan/ In Progress 60% - 40%

PT Wijaya Karya (Persero) Tbk - PT Adhi Karya (Persero) Tbk - PT Waskita Karya (Persero)

Berjalan/ In Progress 32,5% - 37,5% - 30 %

40 Proyek Konstruksi Sabo Dam No. 7-6 dan 7-7/ Construction of Sabo Dams

No. 7-6 and 7-7 Project Berjalan/ In

Progress 35% - 65%

Proyek Jalan Kereta Api Double Track Lahat/Lahat Double Track Rail Way Project

45 Proyek Freeway Balikpapan Samarinda Paket Km,13 - Balikpapan

Samboja/Freeway Balikpapan Samarinda Package Km,13 - Balikpapan Berjalan/ In

Progress 52%-24%-24%

Proyek Jalan Kapuak (Rian - Tideng Pale)/ Kapuak Road (Rian Tideng Pale) Project PT Wijaya Karya (Persero) Tbk - PT Kayan Lestari

PT Wijaya Karya (Persero) Tbk - PT Bawaan Permai

PT Wijaya Karya (Persero) Tbk - PT Duta Graha Indah Tbk

PT Wijaya Karya (Persero) Tbk - PT Arta.

PT Wijaya Karya (Persero) Tbk - PT Pelita

PT Wijaya Karya (Persero) Tbk - PT Pelita

PT Wijaya Karya (Persero) Tbk - PT Pelita

PT Wijaya Karya (Persero) Tbk - PT Realita Makmur

PT Wijaya Karya (Persero) Tbk - PT Panca Duta Karya Abadi PT Wijaya Karya (Persero) Tbk - PT Karya Utama Persada

PT Wijaya Karya (Persero) Tbk - PT Panca Duta Karya Abadi

PT Wijaya Karya (Persero) Tbk.- PT Adhi Karya (Persero) Tbk.

PT Wijaya Karya (Persero) Tbk. - PT Sciencetek Computindo

47 Proyek Penyediaan Air Baku Palingkau - Kapuas/Palingkau Raw Water

Treatment - Palingkau Kapuas Project Berjalan/ In

Progress 70%-30%

46 Berjalan/ In

Progress 51% - 49%

No Nama Project / Name of Project Porsi Bagi Hasil /

Portion of share (%) Status / Status

51 Pek. Jalan Gampong Suak Breuh - Sp. Kisaran Meulaboh JNB 3 /

Gampong Suak Breuh - Sp.Kisaran Meulaboh Road. Project Berjalan/ In

Progress 51% - 49%

52 TPA Sangata / Sangata TPA Berjalan/ In

Progress 51% - 49%

60% - 40% 50 Pek. Jalan Arongan Lambaek - Gampong Suak Breuh JNB 2 / Arongan

Lambaek - Gampong Suak Breuh JNB2 Road. Project Berjalan/ In Progress

51% - 49% 48 Proyek P-23 Tommo Sub Proyek Irigasi (2500Ha) - Mamuju Sulbar/P-23

Tommo Irrigations Sub Project (2500Ha) - Mamuju Sulbar Berjalan/ In

Progress 55%-45%

49 Pekerjaan Acces Road Lot.1 PLTA Asahan III/ PLTA Asahan III Acces Road Lot 1 Project.

Berjalan/ In Progress

55 Pek. Jalan ke Pelabuhan Ara Sorong Papua / Ara Port Sorong Road Road Berjalan/ In

Progress 51% - 49%

56 Pek. Jembatan Nugure / Nugure Bridge Project Berjalan/ In

Progress 51% - 49%

53 Pembangunan Fasilitas Pelabuhan Laut Pigaraja / Pigaraja Port Facility Berjalan/ In

Progress 55% - 45%

54 Pek. Jalan Timika - Fotowali - Enarotali, Papua / Timika - Fotowali -

Enarotali Papua Road project Berjalan/ In Progress

51% - 49%

PT Wijaya Karya (Persero) Tbk. - PT Pembangunan Perumahan (Persero) Tbk. - PT Adhi Karya (Persero) Tbk

36,67% : 30% : 33,33% Berjalan/ In Progress 59 Proyek Pek.Rancang Bangun Baggage Handling System (BHS) & Hold

Baggage Screening Ngurah Rai Bali / Design and Build Baggage Handling

System (BHS) and Hold Baggage Screening Project of Ngurah Rai Bali Berjalan/ In

Progress 51% : 49%

57 Proyek Pek.Pembangunan Gedung Terminal Penumpang Bandara Ngurah

Rai Bali / Passanger Terminal Building Construction of Ngurah Rai Bali Berjalan/ In

Progress 49%;51%

58 Proyek Pek.Pembangunan Gedung Terminal Penumpang & Fasilitas Penunjang Bandara Sepinggan / Passanger Terminal Building and Facilities of Bandara Sepinggan

JNB 3, Construction Of Road Arongan Gampong Suak Breuh - Sp. Kisaran/Meulaboh

PT Wijaya Karya (Persero) Tbk. - PT PELITA

PT Wijaya Karya (Persero) Tbk. - PT PELITA

PT Wijaya Karya (Persero) Tbk. - PT Eka Surya Alam

PT Wijaya Karya (Persero) Tbk. - PT Waskita Karya (Persero)

PT Wijaya Karya (Persero) Tbk. - PT ASTHA

PT Wijaya Karya (Persero) Tbk. - PT Rinenggo Ria Jaya

PT Wijaya Karya (Persero) Tbk. - PT Sataka Mandiri Cemerlang

PT Wijaya Karya (Persero) Tbk. - PT Wahana Infonusa

Pengendalian Banjir Karang-Mumus / Karang Mumus Flood Control PT Wijaya Karya (Persero) Tbk. - PT Raka - PT Tanjung

PT Wijaya Karya (Persero) Tbk. - PT Mamori Terbit

PT Wijaya Karya (Persero) Tbk. - PT Usaha Multi Guna

PT Wijaya Karya (Persero) Tbk. - Consorcio Nacional Timorense, Lda.,

PT Wijaya Karya (Persero) Tbk. - PT CRBC 60

Berjalan/ In Progress 51% : 49%

65 Praska Paket J3 JO Pekerjaan Membuat Jembatan WTP Bentang Lintas Bojonegoro - Surabaya Pasar Turi / Construction of WTP Bentang Lintas

Bojonegoro - Surabaya Pasar Turi Bridge J3 Package Berjalan/ In

Progress 55% : 45%

66 Telagawaja Paket VII JO, Pembangunan Air Baku Telagawaja di Kab.

Karangasem / Telagawaja Water Treatment Phase VII Kab. Karang Asem Berjalan/ In

Progress 70% : 30%

63 Pekerjaan Rehabilitasi Dan Konstruksi bangunan Sabo Dam Paket I /

Construction and Rehabilitasion work of Sabo Dam Phase 1 Berjalan/ In

Progress 57% : 43%

64 Pembangunan Tanggul Sistem Polder Tahap I di Pelabuhan Tanjung Emas Semarang / Polder System Dam construction Phase I of Tanjung Emas

S

Berjalan/ In Progress 60% : 40%

61 Bendung Irigasi Kreung Pase Aceh Utara Tahap I (OTSUS/KAB KOTA)/

Irrigation Dam Kreung Pase Aceh Utara Phase I Berjalan/ In

Progress 75% : 25%

62 Pembangunan Jembatan KA Baru BH 1549 Tahap I antara Lebeng - Maos - Lintas Bogor - Yogyakarta / Construction Bridge of KA.Baru 1549 Phase I between Lebeng - Maos - Lintas Bogor - Yogyakarta

70% : 30%

Berjalan/ In Progress

No Nama Project / Name of Project Porsi Bagi Hasil /

Portion of share (%) Status / Status

71 Pembangunan Jembatan Comoro II/ Construction Bridge of Comoro II Berjalan/ In

Progress 90% : 10%

72 Pembangunan Jembatan Tayan/ Construction Bridge of Tayan Berjalan/ In

Progress 40% : 60%

69 Pembangunan Pengaman Pantai Tanjung Kasuari Kabupaten Sorong /

Construction Coastal Safety of Tanjung Kasuari Kabupaten Sorong Berjalan/ In

Progress 51% : 49%

70 Pembangunan Jalan KA Untuk Jalur Ganda KM 39 + 500 s/d KM 42 + 400 Sepanjang 2.900 M'Sp Antara Krengseng - Weleri Lintas Pekalongan - Semarang, Paket: JG-21 / Construction of KM 39+500 - KM 42 + 400 between Krengseng - Weleri Lintas Pekalongan - Semarang Phase JG-21

Double Track Berjalan/ In

Progress 55% : 45%

67 Praska Paket J2 JO Pekerjaan Membuat Jembatan BH 455 dan BH 477 Lintas Bojonegoro - Surabaya Pasar Turi / Construction of BH 455 and BH

477 Lintas Bojonegoro - Surabaya Pasar Turi Bridge J2 Package Berjalan/ In

Progress 70% : 30%

68 Berjalan/ In

Progress 48% : 32% : 20%

PT Wijaya Karya (Persero) Tbk. - PT PP

PT Wijaya Karya (Persero) Tbk. - PT Waskita - PT Brantas

PT Wijaya Karya (Persero) Tbk. - PT Farika Riau Perkasa

PT Wijaya Karya (Persero) Tbk. - PT PP

PT Wijaya Karya (Persero) Tbk. - PT SCG - PT Waskita

PT Wijaya Karya (Persero) Tbk. - PT Remaja Bangun Kencana

PT Wijaya Karya (Persero) Tbk. - PT Amarta Karya

PT Wijaya Karya (Persero) Tbk. - PT Eka Surya Alam

PT Wijaya Karya (Persero) Tbk. - PT PP - PT Waskita

PT Wijaya Karya (Persero) Tbk. - PT Mamori Terbit

PT Wijaya Karya (Persero) Tbk. - PT Sinar Agung Jaya Lestari

46. 46.

76 Pembangunan Fly Over Jamin Ginting/ Construction Fly Over of Jamin Berjalan/ In

Progress 51% : 49%

77 Proyek Cisumdawu/ Cisumdawu Project Berjalan/ In

Progress 70% : 20% :10%

75 Pembangunan Struktur Jalan Dumai/ Construction Structure of Dumai Berjalan/ In

Progress 95% : 5%

73 Pembangunan Lapangan Teminal Teluk Lamong/ Construction Field

Terminal of Teluk Lamong Berjalan/ In

Progress 49% : 51%

74 Pembangunan Bendungan Sembayat/ Construction Dam of Sembayat Berjalan/ In

Progress 20% : 33% : 47%

No Nama Project / Name of Project Porsi Bagi Hasil /

Portion of share (%) Status / Status

82 Pembangunan Pengaman Pantai Tanjung Kasuari/ Construction of Pantai

Tanjung Kasuari Berjalan/ In

Progress 51% : 49%

83 Pembangunan Jalan Oksibil - Dekay (MYC)/ Construction Street of Oksibil -

Dekay (MYC) Berjalan/ In

Progress 60% : 40%

80 Pembangunan Jalan KA Baru BH 1549 Lebeng Maos/ Construction New

Rail Way BH 1549 in Lebeng Maos Berjalan/ In

Progress 70% : 30%

81 Pembangunan Jembatan Merah Putih Bentang Tengah/ Construction

Bridge of Merah Putih Bentang Tengah Berjalan/ In

Progress 34% : 33% : 33%

78 Proyek Plaju/ Plaju Project Berjalan/ In

Progress 51% : 49%

79 Proyek Peusangan/ PeusanganProject Berjalan/ In

Progress 51% : 49%

ASET DAN LIABILITAS DALAM MATA UANG ASING ASSET AND LIABILITIES DENOMINATION IN FOREIGN