BAB V : KESIMPULAN DAN SARAN
5.2 Saran
1 Diperlukan perencanaan pemanfaatan energi alternatif biogas yang dihasilkan dari proses biologis unit anaerobic filter. 2 Biogas akan berdampak positif bila dimanfaatkan dengan
124
125 DAFTAR PUSTAKA
Anonim. 2000. Filter Press. [online] available from: http://jatimegah.indonetwork.com.id (accessed March 15, 2014) Anonim. 2000. Submersible Pump. [online] available from: http://www.webcaps.com/environment/pump/submersible-pump (accessed March 15, 2014)
Anonim. 2002. Gambar Anaerobic Filter. [online] available from: http://www.google.com/gambar/gambar-anaerobic-filter (accessed March 15, 2014)
Anonim. 2002. Gambar Filter Press. [online] available from: http://www.google.com/gambar/gambar-filter-press (accessed March 15, 2014)
Anonim. 2002. Rotordisk. [online] available from: http://www.google.com/web/new-rotordisk-rotating-biological-contactor-module (accessed March 15, 2014)
Anonim. 2005. Standard Methods for the Examination of Water
and Wastewater. 21st Edition. APHA, AWWA, WPCF.
Washington (accessed March 15, 2014)
Anonim. 2006. Gambar Media Sarang Tawon. [online] available from: http://www.google.com/gambar/gambar-media-sarang-tawon (accessed March 15, 2014)
Anonim. 2009. Gambar Modul RBC. [online] available from: http://www.google.com/gambar/gambar-modul-rbc (accessed March 15, 2014)
126
Anonim. 2009. Undang-undang Nomor 32 Tahun 2009 tentang
Perlindungan dan Pengelolaan Lingkungan Hidup. [online]
available from: http://www.tatanusa.co.id/nonkuhp/2009UU32. pdf (accessed March 15, 2014)
Anonim. 2010. Peraturan Daerah Kota Surabaya no.1 Tahun
2010 tentang Penyelenggaraan Usaha di Bidang Perdagangan dan Perindustrian. [online] available from:
http://www.menlh.co.id (accessed March 15, 2014)
Anonim. 2010. Peraturan Walikota Kota Surabaya no.35 Tahun
2010 tentang Pelayanan di Bidang Perdagangan dan Perindustrian. [online] available from: http://www.menlh.co.id
(accessed March 15, 2014).
Anonim. 2012. Daftar Harga Satuan Upah dan Bahan Kota
Surabaya Tahun Anggaran 2012. [online] available from:
http://www.google/web/daftar-harga-satuan-upah-dan-bahan-kota-surabaya-tahun-anggaran-2012 (accessed March 15, 2014). Anonim. 2012. Pengolahan Air Limbah dengan Reaktor Biologis
Putar. [online] available from: http://www.kelair.bppt.go.id
(accessed March 15, 2014).
Anonim. 2013. Harga Satuan Pokok Kegiatan. [online] available from: http://www.google.com/web/harga-satuan-pokok-kegiatan (accessed March 15, 2014)
Anonim. 2013. Pergub Jatim Nomor. 72 Tahun 2013 tentang
Baku Mutu Air Limbah Industri dan Kegiatan Usaha Lainnya di Jawa Timur, 2013, [online] available from:
http://blog.ub.ac.id/yusriadiblog/files/2014/04/PERGUBJATIM-Tentang-Baku-Mutu-Limbah-Cair-2013.pdf (accessed March 15, 2014)
127
Anonim. 2013. Jumlah dan Nama Pusat Perbelanjaan di
Surabaya Terbaru, [online] available from
http://www.wikipedia.co.id (accessed March 15, 2014)
Conradin., and Kara. 2007. Anaerobic Filter Reactor. Olympia: Environmental Energy Company.
Droste. 1997. Theory and Practice of Water and Wastewater
Treatment. John Wiley. New York.
Eckenfelder, W. 2000. Water Pollution Control. 3rd edition. Singapore. McGraw-Hill Inc.
Ghawi, A. H., and Kris, J. 2009. Use of Rotating Biological
Contactor for Appropriate Technology Wastewater Treatment.
Prentice Hall, New York, USA.
Henze., and Harremoes. 2002. Wastewater Treatment-Biological
and chemical processes. 3rd edition. Springer-Verlag.
Jeppsson. 1996. Modelling Aspects of Wastewater Treatment
Processes. Dissertation. Lund Institute of Technology. Stockholm.
Mashahiro, F. 2002. Biological Treatment. Hand out of JICA Training. JICA. Kitakyushu.
Moelants. 2008. Field performance assessment of onsite
individual wastewater treatment systems. Water Science and
Technology 58.
Nicolella, C. 2000. wastewater treatment with particulate biofilm
128
Praditya, A. 2013. Dasain Alternatif Instalasi Pengolahan Air
Limbah Pusat Pertokoan dengan Proses Aerobik, Anaerobik, dan Kombinasi Aerobik dan Anaerobik di Kota Surabaya. Tugas
Akhir. Jurusan Teknik Lingkungan ITS. Surabaya.
Rakhmadany, A. 2013. Desain Alternatif Instalasi Pengolahan
Air Limbah Rumah Sakit dengan Proses Aerobik, Anaerobik, dan Kombinasi Aerobik dan Anaerobik di Kota Surabaya. Tugas
Akhir. Jurusan Teknik Lingkungan ITS. Surabaya.
Ramdhani, R. 2013. Desain Alternatif Instalasi Pengolahan Air
Limbah Apartemen dengan Proses Aerobik, Anaerobik, dan Kombinasi Aerobik dan Anaerobik di Kota Surabaya. Tugas
Akhir. Jurusan Teknik Lingkungan ITS. Surabaya.
Randall, C. W. 1980. Biological Process Design for Wastewater
Treatment. Wiley-liss. New York.
Rittmann, B. E., and McCarty, P. L. 2001, Environmental
Biotechnology : Principles And Applications. McGraw-Hill.
ISBN: 0072345535. New York. The United States of America. Reynolds, T. D., and Richards, P. A. 1996. Unit Operations and
Processes in Environmental Engineering. 2nd ed. PWS
Publishing Company. Boston.
Sasse, L. 1998. Decentralised Wastewater Treatment in
Developing Countries. Bremen. Bremen Overseas Research and
Development Association – BORDA.
Tchobanoglous, G. 1998. Small and Decentralized Wastewater
Management Systems. WCB McGraw-Hill.
Teixeira. 1998. Biological Treatments. Training Industrial Wastewater Treatment. Sinclair Knight Merz. Sydney. Australia.
129
Winkler, M. A. 1981. Biological Treatment of Wastewater. The Saybrook Press. Inc., USA.
Yang, Y. H., and Lou, H. H. 2000. Synthesis of an optimal
130
131 LAMPIRAN A : PERGUB JATIM 72/2013
132
133 LAMPIRAN B :
134
135 LANJUTAN LAMPIRAN B :
136
137 DAFTAR HARGA SATUAN UPAH DAN BAHAN KOTA SURABAYA
TAHUN ANGGARAN 2012
NO URAIAN SATUAN HARGA SATUAN (Rp.)
I UPAH
1 Pekerja Hari 70.000,00
2 Mandor Hari 120.000,00
3 Kepala Tukang Kayu Hari 100.000,00 4 Kepala Tukang Batu Hari 100.000,00
5 Kepala Tukang Cat Hari 100.000,00
6 Kepala Tukang Besi Hari 100.000,00
7 Tukang Kayu Hari 80.000,00
8 Tukang Batu Hari 80.000,00
9 Tukang Cat Hari 80.000,00
10 Tukang Listrik Hari 80.000,00
11 Tukang Besi Hari 80.000,00
12 Tukang gali tanah Hari 80.000,00
13 Tukang Tebas Hari 80.000,00
14 Penjaga Malam Hari 60.000,00
15 Sopir Hari 70.000,00
Alat
1 Mesin Molen Hari 150.000,00
2 Mesin genset ( dinamo 6 kg ) Hari 200.000,00 3 Operator Terlatih Hari 80.000,00
4 Mekanik Hari 80.000,00
138
NO URAIAN SATUAN HARGA SATUAN (Rp.)
II BAHAN
A BAHAN BATU KALI BELAH / BATU PECAH
1 Batu Belah 15/20 / Batu Gunung M3 100.000,00 2 Batu Pecah 1-2 cm (mesin) M3 247.500,00 3 Batu Pecah 0.5-1 cm (mesin) M3 247.500,00 4 Batu Pecah 2/3 cm (manual) M3 150.000,00 5 Batu Pecah 3/4 cm (manual) M3 150.000,00 6 Batu Pecah 5/7 cm (manual) M3 130.000,00 7 Batu Pecah 5/10 cm (manual) M3 130.000,00
B BAHAN KERIKIL / KORAL
1 Kerikil Beton M3 220.000,00 2 Split M3 270.000,00 3 Cadas M3 100.000,00 4 sirtu M3 135.000,00 C BAHAN PASIR 1 Pasir Pasang M3 120.000,00 2 Pasir Beton M3 95.000,00 3 Pasir Urug M3 90.000,00
4 Pasir Saring (Abu Batu) M3 300.000,00
D BAHAN DINDING
1 Bata Merah Type 1 Bh 800,00 2 Roster/Terawang (bata) Bh 5.000,00
3 Batako Bh 2.000,00
139
NO URAIAN SATUAN HARGA SATUAN (Rp.)
E BAHAN SEMEN
1 Semen Portland Tipe I @ Andalas Sak 60.000,00 2 Semen PCC Merah @ 50 Kg Kg 1.150,00 3 Semen Warna Kg 9.000,00 4 Kapur Sirih Kg 6.500,00 5 Semen Nat Kg 9.000,00 6 Semen Abu-abu Kg 8.500,00 F BAHAN KAYU
1 Kayu Papan Klas I M3 3.000.000,00
2 Kayu Balok Klas I M3 3.000.000,00
3 Kayu Papan Klas II M3 2.600.000,00
4 Kayu Balok Klas II M3 2.500.000,00
5 Kayu Papan Klas III M3 1.500.000,00
6 Kayu Balok Klas III M3 1.500.000,00
7 Kayu Bekisting M3 1.500.000,00
8 Papan Lamberizering Lbr 15.000,00
9 Les Kayu Profil D1 M' 12.000,00
10 Kayu Tiang Pancang (dia > 10 cm) M3 10.000,00 11 Dolken Kayu Galam dia. 8-10/4 m Btg 10.000,00 12 hammer @ 10 - 20 Kg unit 200.000,00 G BAHAN PAKU 1 Paku Biasa 1/2"-5" Kg 15.000,00 2 Paku Triplek Kg 17.000,00 LANJUTAN LAMPIRAN C :
140
NO URAIAN SATUAN HARGA SATUAN (Rp.)
3 Paku Seng Kg 18.000,00
4 Paku Atap Anti Karat Kg 25.000,00
5 Sekrup Kotak 8.000,00
6 Lem Kayu Kg 15.000,00
H BAHAN PIPA
BAHAN PIPA PVC STANDAR SNI (Merk Paralon)
1 Besi Galvanish Med A 1/2" M' 3.750,00 2 Besi Galvanish Med A 3/4" M' 5.000,00 3 Besi Galvanish Med A 1" M' 7.000,00 4 Besi Galvanish Med A 2" M' 9.750,00 5 Besi Galvanish Med A 3" M' 16.250,00 6 Besi Galvanish Med A 4" M' 25.000,00
7 Pipa GI 3/4" BOS Btg 152.500,00 8 Pipa GI 1/2" BOS Btg 110.000,00 9 Pipa GI 1" BOS Btg 187.500,00 10 W. Moor 3/4" Bh 22.500,00 11 W. Moor 1/2" Bh 15.000,00 12 W. Moor 1" Bh 32.500,00 13 Socket GI 1/2" Bh 5.000,00 14 Socket GI 3/4" Bh 7.500,00 15 D. Nipol 1/2" Bh 5.000,00 16 D. Nipol 3/4" Bh 7.500,00 17 D. Nipol 1 " Bh 9.750,00
18 Stop Kran 1/2" ONDA Bh 33.250,00 LANJUTAN LAMPIRAN C :
141
NO URAIAN SATUAN HARGA SATUAN (Rp.)
19 Stop Kran 3/4" ONDA Bh 52.500,00 20 Kenie 1/2" GI Bh 5.500,00 21 Kenie 3/4" GI Bh 8.000,00 22 Kenie 1" GI Bh 10.000,00 23 Kenie PVC 1/2" Bh 2.250,00 24 Kenie PVC 3/4" Bh 2.750,00 25 Kenie PVC 1" Bh 3.500,00 26 Kenie PVC 1 1/2" Bh 6.250,00 27 Kran 1/2" Bh 13.750,00 28 Kran 3/4" Bh 23.750,00 29 TBA Bh 2.000,00 30 V. Tee 1" x 1/2" GI Bh 10.000,00 31 V. Socket 3/4" x 1/2" GI Bh 8.000,00 32 V. Socket 1/2" PVC Bh 3.000,00 33 V. Socket 3/4" PVC Bh 5.000,00 34 Lem PVC Plus Bh 6.000,00 35 Plugh dia. 3/4" Bh 7.500,00 36 Plugh dia. 1/2" Bh 5.000,00 I BAHAN PLAFOND 1 Triplek Tebal 4 mm Lbr 58.000,00 2 Triplek Tebal 3 mm Lbr 48.000,00 3 Plywood tebal 9 mm Lbr 130.000,00 4 Triplek Jati Lbr 75.000,00 5 Triplek Sungkai Lbr 90.000,00
6 Gypsum Board tebal 9 mm Lbr 55.500,00 LANJUTAN LAMPIRAN C :
142
NO URAIAN SATUAN HARGA SATUAN (Rp.)
7 Formika Lbr 80.000,00
8 GRC Board tebal 6 mm Lbr 97.000,00
9 List Profil Gypsum M' 27.000,00
10 Compound Gypsum Kg 95.000,00
11 Compound GRC Kg 27.000,00
12 Furing Channel M' 12.000,00
13 Hollow 4x4 cm Btg 22.500,00
14 Hollow 2x4 cm Btg 19.500,00
15 Rangka Atap Baja Ringan M2 135.000,00
J BAHAN BESI DAN KAWAT
1 Kawat Beton Kg 16.250,00
2 Besi Beton Polos Kg 5.000,00
3 Besi Beton Ulir Kg 9.000,00
4 Baja Ringan C.75.100 M' 65.000,00 5 Baja Ringan C.75.75 M' 75.000,00 6 Reng/Topspan M' 13.000,00 7 Baut/Screw Bh 500,00 8 Dynabolt Bh 3.000,00 K BAHAN ATAP 1 SENG BJLS Lbr 27.000,00
2 Genteng Metal Double Tebal 0,3 mm (Sakuraroof) Lbr 40.000,00 3 Seng Plat tb. 0,40 m Lbr 90.000,00 4 Perabung Atap Genteng Metal Single (sakuraroof) Lbr 25.000,00 5 Bola-bola Atap Genteng Metal (sakuraroof) Bh 30.000,00 LANJUTAN LAMPIRAN C :
143
NO URAIAN SATUAN HARGA SATUAN (Rp.)
L BAHAN PELAPIS LANTAI DAN DINDING
1 Keramik Polos uk. 40 x 40 cm Kotak 60.000,00 2 Keramik Bermotif uk. 40 x 40 cm Kotak 65.000,00 3 Keramik Polos uk. 30 x 30 cm Kotak 50.000,00 4 Keramik Bermotif uk. 30 x 30 cm Kotak 53.000,00 5 Keramik Polos uk. 20 x 20 cm Kotak 48.000,00 6 Keramik Bermotif uk. 20 x 20 cm Kotak 50.000,00 7 Keramik Dinding Polos uk. 20 x 25 cm Kotak 46.000,00 8 Keramik Dinding Bermotif uk. 20 x 25 cm Kotak 49.500,00
9 Bon-bon 10 cm Bh 7.000,00
10 Les Tillo Keramik Bh 8.000,00 11 Plint Keramik Artistik 10 x 20 cm Bh 5.000,00 12 Plint Keramik Artistik 10 x 10 cm Bh 10.000,00 13 Granit uk. 30 x 30 cm Bh 60.000,00 14 Granit uk. 40 x 40 cm (Granito) Bh 150.000,00
15 Batu Alam Andesit M2 160.000,00
16 Batu Alam Candi M2 145.000,00
17 Batu Alam RTM M2 120.000,00
18 Paving Blok Tebal 6 Bh 1.800,00 19 Paving Blok Tebal 8 Bh 3.000,00
20 Ijuk Kg 6.500,00
M BAHAN KACA
1 Kaca Polos ( biru ) Tebal 5 mm M2 97.500,00
2 Rayben Tebal 3 mm M2 95.000,00
3 Rayben Tebal 5 mm M2 105.000,00
144
NO URAIAN SATUAN HARGA SATUAN (Rp.)
N BAHAN PENGGANTUNG DAN PENGUNCI
1 Grendel Jendela Bh 10.000,00
2 Tangan-Tangan Jendela Bh 13.000,00 3 Engsel Nylon (Pintu) Bh 70.000,00
4 Engsel Jendela Bh 15.000,00
5 Kunci Merk SES Asli Bh 195.000,00
6 Kunci Tanam Biasa Bh 100.000,00
O BAHAN CAT
1 Cat Dasar Kayu Kg 18.500,00
2 Plamir Kayu Kg 22.750,00
3 Cat Kayu Kg 38.375,00
4 Cat Besi Kg 39.500,00
5 Menie Besi Kg 17.500,00
6 Cat Dasar Tembok Kg 17.000,00
7 Cat Tembok mowilek Kg 70.000,00
8 Alkali Kg 42.000,00
9 Cat Tembok Warna (mowilek) Kg 70.000,00
10 Cat Ultra Plitur Kg 36.500,00
11 Cat Melanin (Cear) Kg 45.000,00 12 Dempul/Plamir Tembok Kg 9.500,00 13 Dempul Kg 28.500,00 14 Vernis Ltr 36.000,00 15 Thinner Ltr 14.000,00 16 Minyak Bekisting Kg 15.000,00 LANJUTAN LAMPIRAN C :
145
NO URAIAN SATUAN HARGA SATUAN (Rp.)
17 Residu / Ter Ltr 10.400,00
18 Amplas Lbr 3.500,00
19 Kuas 4 inc . Crocodail Bh 15.000,00 20 Kuas 3 inc . Crocodail Bh 13.000,00 21 Kuas 2 inc . Crocodail Bh 9.000,00
P BAHAN MINYAK DAN PELUMAS
1 Minyak Bakar Ltr 10.000,00
2 Solar Ltr 4.500,00
3 Air Ltr 100,00
Q BAHAN SANITAIR
1 Kloset Jongkok Keramik ( merek TOTO ) Bh 155.000,00 2 Kloset Duduk pakai tangki siram (Merek TOTO) Set 1.425.000,00
3 Urinoir Keramik Bh 900.000,00
4 Wastafel Gantung Keramik Bh 487.500,00 5 Bak Mandi Fibreglass 70x70x66 cm Bh 285.000,00 6 Tangki Air Fibre Kap. 1000 L Bh 1.300.000,00 7 Pelampung Otomatis 1/2 Bh 107.500,00
8 Pompa Air Bh 3.000.000,00
9 Kran Air Bh 13.750,00
T BAHAN DAN PERLENGKAPAN LISTRIK
1 Cabel Eterna 2.5 mm Bh 250.000,00
2 Pipa pvc 1/2 inc Bh 8.000,00
3 Elbo Pipa Bh 700,00
146
NO URAIAN SATUAN HARGA SATUAN (Rp.)
4 Isolasiban Bh 10.000,00
5 Tedos Bh 6.000,00
6 Box saklar . Panasonic. Bh 5.000,00 7 Box Stop kontak . Panasonic. Bh 5.000,00 8 Cover saklar . Panasonic. Bh 9.000,00 9 Cover Stop kontak . Panasonic. Bh 9.000,00 10 Saklar . Panasonic. Bh 10.000,00 11 Stop kontak . Panasonic. Bh 10.000,00
12 lampu TL Philips Bh 50.000,00
13 Lampu pijar Philips Bh 50.000,00
14 Lampu Hias philips Bh 275.000,00
15 Piting lampu Bh 15.000,00
16 kipas Philips Bh 300.000,00
17 Anti Petir + ground Bh 500.000,00 LANJUTAN LAMPIRAN C :
147 LAMPIRAN D : POMPA
148
149 LANJUTAN LAMPIRAN D : POMPA
150
151 LAMPIRAN E : ROTORDISK
152
153 LAMPIRAN F : FILTER PRESS
154
155 BIODATA PENULIS
Penulis, Ahmad Rahmat Habibi Bilal atau yang akrab dipanggil Habibi ini lahir di Kota Jombang pada 11 April 1992 merupakan anak pertama dari 2 bersaudara. Penulis telah menyelesaikan jenjang pendidikannya di TK Pertiwi Peterongan, SDN Mancar 1 Peterongan, SMPN 3 DU Jombang, SMAN 2 DU Jombang, dan sekarang sedang menempuh masa perkuliahan di Jurusan Teknik Lingkungan FTSP-ITS masuk Tahun 2010 dengan Nomor Registrasi Mahasiswa 3310100015.
Dalam masa perkuliahan, penulis aktif mengikuti berbagai macam kegiatan kemahasiswaan antara lain Himpunan Mahasiswa Teknik Lingkungan sebagai Staff Danus, LDJ Al-Kaun sebagai Staff WU, dan juga beberapa kegiatan UKM di ITS. Pada semester 7 penulis sempat melakukan Kerja Praktek di PT.PJB.UP.Paiton Probolinggo selama 1 Bulan untuk menerapkan ilmu yang telah dipelajari di bangku perkuliahan. Kemudian di awal semester 8, selain mengerjakan Tugas Akhir, penulis juga bekerja di Konsultan Amdal sebagai Asisten Tenaga Ahli di bawah arahan Dosen Pembimbing Tugas Akhir.
Sebagai penutup, penulis mengharapkan saran dan masukan dari pembaca guna memperbaiki perhitungan-perhitungan sejenis yang dilakukan berikutnya. Penulis dapat dihubungi via email di alamat [email protected]