Variasi : 20% Steel Slag + 20% Fly Ash + 5% Serbuk Botol Kaca Pengujian : Berat Jenis
Pemeraman :
-Sample :
-no item Sieve no. 4 Sieve no. 10 1 Temperature
2
Berat piknometer +
contoh W
2(gram) 281 277,5
3 Berat piknometer W
1(gram) 132,73 127,57
4 Berat tanah W
t= W
2– W
1(gram) 148,27 149,93
5
oC
6 k
7
Berat piknometer + air
+ tanah pada
temperatur
W
3(gram) 493 487,5
8
Berat piknometer + air
pada 29
oC W
4(gram) 405,000 400,000
9 (gram) 553,270 549,930
10 Isi tanah W
5– W
3(cm
3) 60,270 62,430
11 Berat jenis (G
s) (gram/cm
3) 2,460 2,402
Rata – rata (gram/cm
3)
Abdul Basit Alamsyah Muhamad Habib Anwar Fatwari
NIM. 3336180049 NIM. 3336180047
Faktor koreksi 0,9977
Mngetahui,
Asisten Laboratorium Mahasiswa
Temperatur 29
oSymbol
W
5= W
t+ W
42,431
Nama Proyek : Penelitian Tugas Akhir Muhamad Habib Anwar Fatwari Lokasi Pengujian : Laboratorium Teknik Sipil Untirta
Variasi : 20% Steel Slag + 20% Fly Ash + 10% Serbuk Botol Kaca Pengujian : Berat Jenis
Pemeraman :
-Sample :
-LABORATORIUM JURUSAN TEKNIK SIPIL
BAHAN & BETON – SURVEYING – INVESTIGASI TANAH – HIDROLIKA FAKULTAS TEKNIK UNIVERSITAS SULTAN AGENG TIRTAYASA
Jl. Jendral Sudirman KM.3 Cilegon Tlp.(0254)395502/081287301294
no item Sieve no. 4 Sieve no. 10 1 Temperature
2
Berat piknometer +
contoh W
2(gram) 284,1 274,6
3 Berat piknometer W
1(gram) 133,3 129,7
4 Berat tanah W
t= W
2– W
1(gram) 146,7 142,5
5
oC
6 k
7
Berat piknometer + air + tanah pada temperatur
W
3(gram) 489,2 487,6
8
Berat piknometer + air
pada 29
oC W
4(gram) 403,000 401,000
9 (gram) 549,700 543,500
10 Isi tanah W
5– W
3(cm
3) 60,500 55,900
11 Berat jenis (G
s) (gram/cm
3) 2,425 2,549
Rata – rata (gram/cm
3)
Asisten Laboratorium Mahasiswa
2,487
Mngetahui, Symbol
Temperatur 29
oFaktor koreksi 0,9977
W
5= W
t+ W
4Pengujian : Berat Jenis
Pemeraman :
-Sample :
-Variasi Berat Jenis Variasi A 2,036
Variasi B 2,281
Variasi C 2,318 Variasi D 2,431 Variasi E 2,487
NIM. 3336180049 NIM. 3336180047
Asisten Laboratorium Mahasiswa
Abdul Basit Alamsyah Muhamad Habib Anwar Fatwari
Mngetahui,
Nama Proyek : Penelitian Tugas Akhir Muhamad Habib Anwar Fatwari Lokasi Pengujian : Laboratorium Teknik Sipil Untirta
Pengujian : Berat Jenis
Pemeraman :
-Sample :
-LABORATORIUM JURUSAN TEKNIK SIPIL
BAHAN & BETON – SURVEYING – INVESTIGASI TANAH – HIDROLIKA FAKULTAS TEKNIK UNIVERSITAS SULTAN AGENG TIRTAYASA
Jl. Jendral Sudirman KM.3 Cilegon Tlp.(0254)395502/081287301294
Variasi A Variasi B Variasi C Variasi D Variasi E
0 hari 1,62 10,29 10,56 16,24 9,74
3 hari 2,71 22,19 23,28 29,77 23,82
7 hari 2,87 33,29 35,19 30,86 22,47
Mngetahui,
Asisten Laboratorium Mahasiswa
Nilai CBR Tiap Tumbukan (%) Pemeraman
0,00 5,00 10,00 15,00 20,00 25,00 30,00 35,00 40,00
0,00 5,00 10,00 15,00
CBR (%)
Variasi Persentase Serbuk Kaca 5%, 10% dan 15%
CBR Tiap Variasi vs Pemeraman
pemeraman o hari pemeraman 3 hari pemeraman 7 hari
no item Sieve no. 4 Sieve no. 10 1 Temperature
2
Berat piknometer +
contoh W
2(gram) 290 281
3 Berat piknometer W
1(gram) 133,3 129,7
4 Berat tanah W
t= W
2– W
1(gram) 156,7 151,3
5
oC
6 k
7
Berat piknometer + air + tanah pada temperatur
W
3(gram) 489,2 487,6
8
Berat piknometer + air
pada 29
oC W
4(gram) 403,000 401,000
9 (gram) 559,700 552,300
10 Isi tanah W
5– W
3(cm
3) 70,500 64,700
11 Berat jenis (G
s) (gram/cm
3) 2,223 2,338
Rata – rata (gram/cm
3)
Symbol
Temperatur 29
oFaktor koreksi 0,9977
W
5= W
t+ W
42,281
NIM. 3336180049 NIM. 3336180047
Mngetahui,
Asisten Laboratorium Mahasiswa
Abdul Basit Alamsyah Muhamad Habib Anwar Fatwari
Nama Proyek : Penelitian Tugas Akhir Muhamad Habib Anwar Fatwari Lokasi Pengujian : Laboratorium Teknik Sipil Untirta
Variasi : 20% Steel Slag + 20% Fly Ash + 0% Serbuk Botol Kaca Pengujian : Berat Jenis
Pemeraman :
-Sample :
-LABORATORIUM JURUSAN TEKNIK SIPIL
BAHAN & BETON – SURVEYING – INVESTIGASI TANAH – HIDROLIKA FAKULTAS TEKNIK UNIVERSITAS SULTAN AGENG TIRTAYASA
Jl. Jendral Sudirman KM.3 Cilegon Tlp.(0254)395502/081287301294
No 1 2 3 4 5
1 500 600 700 800 900
2 933 933 933 933 933
3 5589 5693 5780 5715 5683
4 4475 4475 4475 4475 4475
5 1114 1218 1305 1240 1208
6 1,19 1,31 1,40 1,33 1,30
7 0,97 1,04 1,08 1,01 0,97
8 1,39 1,34 1,27 1,23 1,21
AB AB AB AB AB
10 259,0 271,0 267,0 269,0 254,5
11 237,0 244,6 238,6 237,8 226,0
12 141,0 141,0 142,0 141,0 140,5
13 118,0 130,0 125,0 128,0 114,0
14 96,0 103,6 96,6 96,8 85,5
15 22,0 26,4 28,4 31,2 28,5
16 22,92 25,48 29,40 32,23 33,33
17
95% g Dry Max (gram/cm3) 1,026
g dry max (kN/m3) 10,58
28,67
Method of Test Standard Proctor Test
W opt (%) 29,20
g Dry Max (gram/cm3) 1,080
W4 = W2-W1 W5 = W3-W1 Symbol
ml V mold
W2 W mold W3=W2-W mold ρ=(W2-W mold)/Vmold ρdn=(ρ x 100)/(100+ωn) (Gs.gw)/1+(Gs.wn)
W2 W1 Mass of Dry Soil + Container
Mass of Container Sampel Air yang diberikan Volume Mold Mass of Soil + Mold Mass of Mold
ZAV 100% (gram/cm3) Mass of Wet Soil + Container Water Content Examination
W3 Mass of Wet Soil
Density (gram/cm3)
W6 = W4-W5 ω = (W6/W5) x 100%
Average Water Content (%) Mass of Wet Soil Mass of Dry Soil Weight Water Water Content (%) Dry Density (gram/cm3)
Pengujian : Pemadatan
Pemeraman :
-0,70 0,80 0,90 1,00 1,10 1,20 1,30 1,40 1,50
20,00 22,00 24,00 26,00 28,00 30,00 32,00 34,00
berat isi kering
Kadar Air (%)
Berat Isi Kering VS Kadar Air
No 1 2 3 4 5
1 500 600 700 800 900
2 932,74 932,74 932,74 932,74 932,74
3 5847 5933 5989 5963 5913
4 4475 4475 4475 4475 4475
5 1372 1458 1514 1488 1438
6 1,470935 1,563137 1,623175 1,5953 1,5416944
7 1,207484 1,272188 1,299887 1,262145 1,1965712
8 1,586337 1,560304 1,513075 1,478939 1,4272911
AB AB AB AB AB
10 274 277 261,5 265,5 282,5
11 250 251,5 237,5 239,5 250,6
12 140 140 141 141 140
13 134 137 120,5 124,5 142,5
14 110 111,5 96,5 98,5 110,6
15 24 25,5 24 26 31,9
16 21,81818 22,86996 24,87047 26,39594 28,842676
17
gs 2,426
Abdul Basit Alamsyah Muhamad Habib Anwar Fatwari
Method of Test W opt (%) g Dry Max (gram/cm3) 95% g Dry Max (gram/cm3)
NIM. 3336180049 NIM. 3336180047
Mngetahui,
Asisten Laboratorium Mahasiswa
24,95944374
Weight Water W6 = W4-W5
Water Content (%) ω = (W6/W5) x 100%
Average Water Content (%) Mass of Mold
Mass of Dry Soil + Container W3
Mass of Container W1
Mass of Wet Soil
Mass of Dry Soil W5 = W3-W1
Dry Density (gram/cm3) ρdn=(ρ x 100)/(100+ωn) ZAV 100% (gram/cm3) (Gs.gw)/1+(Gs.wn) Water Content Examination
Mass of Wet Soil + Container W2
Mass of Wet Soil W3=W2-W mold
Density (gram/cm3) ρ=(W2-W mold)/Vmold Sampel
Air yang diberikan ml
W mold Symbol
W4 = W2-W1
Volume Mold V mold
Mass of Soil + Mold W2
g dry max (kN/m3) 12,74
1,235 1,300 24,80 Standard Proctor Test
LABORATORIUM JURUSAN TEKNIK SIPIL
BAHAN & BETON – SURVEYING – INVESTIGASI TANAH – HIDROLIKA FAKULTAS TEKNIK UNIVERSITAS SULTAN AGENG TIRTAYASA
Jl. Jendral Sudirman KM.3 Cilegon Tlp.(0254)395502/081287301294
Nama Proyek : Penelitian Tugas Akhir Muhamad Habib Anwar Fatwari Lokasi Pengujian : Laboratorium Teknik Sipil Untirta
Variasi : 5 % serbuk botol kaca Pengujian : Pemadatan
Pemeraman :
-Sample :
1,1 1,2 1,3 1,4 1,5 1,6 1,7
20 21 22 23 24 25 26 27 28 29 30
berat isi kering (grm/cm3)
Kadar Air (%)
Berat Isi Kering VS Kadar Air
No 1 2 3 4 5
1 500 600 700 800 900
2 932,74 932,74 932,74 932,74 932,74
3 5847 5940 5983 5967 5906
4 4475 4475 4475 4475 4475
5 1372 1465 1508 1492 1431
6 1,470935 1,570641 1,616742 1,599588 1,5341896
7 1,212679 1,270792 1,299066 1,250472 1,1849897
8 1,625871 1,567283 1,546472 1,467826 1,4351778
AB AB AB AB AB
10 272 273 282,5 266 274,5
11 249 247,8 254,5 238,5 244
12 141 141 140 140 140,5
13 131 132 142,5 126 134
14 108 106,8 114,5 98,5 103,5
15 23 25,2 28 27,5 30,5
16 21,2963 23,59551 24,45415 27,91878 29,468599
17
gs 2,431
W opt (%) 24,60
g Dry Max (gram/cm3) 1,300
95% g Dry Max (gram/cm3) 1,235
g dry max (kN/m3) 12,74
Weight Water W6 = W4-W5
Water Content (%) ω = (W6/W5) x 100%
Average Water Content (%) 25,34666623
Method of Test Standard Proctor Test Mass of Wet Soil + Container W2
Mass of Dry Soil + Container W3
Mass of Container W1
Mass of Wet Soil W4 = W2-W1
Mass of Dry Soil W5 = W3-W1
Mass of Wet Soil W3=W2-W mold
Density (gram/cm3) ρ=(W2-W mold)/Vmold Dry Density (gram/cm3) ρdn=(ρ x 100)/(100+ωn) ZAV 100% (gram/cm3) (Gs.gw)/1+(Gs.wn) Water Content Examination
Sampel Symbol
Air yang diberikan ml
Volume Mold V mold
Mass of Soil + Mold W2
Mass of Mold W mold
Pengujian : Pemadatan
Pemeraman :
-Sample :
-1,1 1,2 1,3 1,4 1,5 1,6 1,7
20 21 22 23 24 25 26 27 28 29 30
be ra t i si k er in g (g rm /c m
3)
Kadar Air (%)
Berat Isi Kering VS Kadar Air
No 1 2 3 4 5
1 500 600 700 800 900
2 932,74 932,74 932,74 932,74 932,74
3 5835 5932 6012 5975 5893
4 4475 4475 4475 4475 4475
5 1360 1457 1537 1500 1418
6 1,45807 1,562064 1,647833 1,608165 1,5202522
7 1,196073 1,277016 1,311653 1,259627 1,1742246
8 1,609944 1,599217 1,518847 1,473208 1,4351778
AB AB AB AB AB
10 269 278 289,5 271,5 274,5
11 246 253 259 243 244
12 141 141 140 140 140,5
13 128 137 149,5 131,5 134
14 105 112 119 103 103,5
15 23 25 30,5 28,5 30,5
16 21,90476 22,32143 25,63025 27,6699 29,468599
17
gs 2,4
g dry max (kN/m3) 12,64
Mngetahui,
NIM. 3336180049 NIM. 3336180047
Asisten Laboratorium Mahasiswa
Abdul Basit Alamsyah Muhamad Habib Anwar Fatwari
25,3989889
Method of Test Standard Proctor Test
W opt (%) 24,80
g Dry Max (gram/cm3) 1,290
95% g Dry Max (gram/cm3) 1,226
Mass of Wet Soil W4 = W2-W1
Mass of Dry Soil W5 = W3-W1
Weight Water W6 = W4-W5
Water Content (%) ω = (W6/W5) x 100%
Average Water Content (%)
ZAV 100% (gram/cm3) (Gs.gw)/1+(Gs.wn) Water Content Examination
Mass of Wet Soil + Container W2 Mass of Dry Soil + Container W3
Mass of Container W1
Mass of Soil + Mold W2
Mass of Mold W mold
Mass of Wet Soil W3=W2-W mold
Density (gram/cm3) ρ=(W2-W mold)/Vmold Dry Density (gram/cm3) ρdn=(ρ x 100)/(100+ωn)
Sampel Symbol
Air yang diberikan ml
Volume Mold V mold
LABORATORIUM JURUSAN TEKNIK SIPIL
BAHAN & BETON – SURVEYING – INVESTIGASI TANAH – HIDROLIKA FAKULTAS TEKNIK UNIVERSITAS SULTAN AGENG TIRTAYASA
Jl. Jendral Sudirman KM.3 Cilegon Tlp.(0254)395502/081287301294
Nama Proyek : Penelitian Tugas Akhir Muhamad Habib Anwar Fatwari Lokasi Pengujian : Laboratorium Teknik Sipil Untirta
Variasi : 15 % serbuk botol kaca Pengujian : Pemadatan
Pemeraman :
-Sample :
-1,1 1,2 1,3 1,4 1,5 1,6 1,7
20 21 22 23 24 25 26 27 28 29 30
be ra t i si k er in g (g rm /c m
3)
Kadar Air (%)
Berat Isi Kering VS Kadar Air
PROVING RING PENETRATION
Sec (inch) I I
0 0 0 0
15,00 0,0125 2,00 32,48
30,00 0,025 4,00 64,96
60,00 0,050 6,00 97,44
90,00 0,075 8,00 129,92
120,00 0,100 10,00 162,40
180,00 0,150 11,00 178,64
240,00 0,200 13,00 211,12
PROVING RING :
1 Calibration 16,240 lb/E-04 in
2 Calibration lb/E-04 in
CORRECTED CBR :
Curve Penetration Pressure CBR
No. in lbs/sq.in % 122,5
I 0,10 162,40 5,41
0,20 211,12 4,69
Averages :
Mass of Wet Soil + Container 227
Mass of Dry Soil + Container 209 7847
Mass of Container 142 4072
Mass of Wet Soil 85 3775
Mass of Dry Soil 67 2125
Weight Water 18 1,776470588
Water Content (%) 26,86567164 1,400276817
W2 DIAL READING
PRESSURE (lb/sqin) Elapsed
Time
densitas cetakan kadar air
ω = (W6/W5) x 100% densitas kering
W6 = W4-W5 densitas basah
volume mold massa benda uji basah massa cetakan W3
W1 W4 = W2-W1 W5 = W3-W1
massa benda uji + cetakan
Mengetahui, Pengujian : CBR Laboratoium
Pemeraman : 0 hari
Sample : 10 Tumbukan
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230
0 0,1 0,2 0,3
Beban (lb)
Penetrasi (in)
PROVING RING PENETRATION
Sec (inch) I I
0 0 0 0
15,00 0,0125 5,00 81,20
30,00 0,025 9,00 146,16
60,00 0,050 12,00 194,88
90,00 0,075 15,00 243,60
120,00 0,100 17,00 276,08
180,00 0,150 19,00 308,56
240,00 0,200 21,00 341,04
PROVING RING :
1 Calibration 16,240 lb/E-04 in
2 Calibration lb/E-04 in
CORRECTED CBR :
Curve Penetration Pressure CBR
No. in lbs/sq.in %
I 0,10 276,08 9,20
0,20 341,04 7,58
Averages :
Mass of Wet Soil + Container 253,5
Mass of Dry Soil + Container 231,7 8016
Mass of Container 142 4072
Mass of Wet Soil 111,5 3944
Mass of Dry Soil 89,7 2125
Weight Water 21,8 1,856
Water Content (%) 24,303233 1,49312287
Mengetahui, W2
W3
W1 massa cetakan
massa benda uji + cetakan
massa benda uji basah volume mold W6 = W4-W5
ω = (W6/W5) x 100%
NIM. 33361800 Abdul Basit Alamsyah
Asisten Laboratorium Mahasiswa
Muhamad Habib Anwar Fatwari kadar air
densitas cetakan
densitas basah densitas kering Elapsed
Time DIAL READING
PRESSURE (lb/sqin)
W4 = W2-W1 W5 = W3-W1
NIM. 3336180047
LABORATORIUM JURUSAN TEKNIK SIPIL
BAHAN & BETON – SURVEYING – INVESTIGASI TANAH – HIDROLIKA FAKULTAS TEKNIK UNIVERSITAS SULTAN AGENG TIRTAYASA
Jl. Jendral Sudirman KM.3 Cilegon Tlp.(0254)395502/081287301294
Nama Proyek : Penelitian Tugas Akhir Muhamad Habib Anwar Fatwari Lokasi Pengujian : Laboratorium Teknik Sipil Untirta
Variasi : 5 % Serbuk Botol Kaca + 20% Steel Slag + 20% Fly Ash Pengujian : CBR Laboratorium
Pemeraman : 0 hari
Sample : 30 Tumbukan
0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 320 340 360
0 0,1 0,2 0,3
Beban (lb)
Penetrasi (in)
PROVING RING PENETRATION
Sec (inch) I I
0 0 0 0
15,00 0,0125 4,00 64,96
30,00 0,025 7,00 113,68
60,00 0,050 11,00 178,64
90,00 0,075 15,00 243,60
120,00 0,100 19,50 316,68
180,00 0,150 21,00 341,04
240,00 0,200 24,00 389,76
PROVING RING :
1 Calibration 16,240 lb/E-04 in
2 Calibration lb/E-04 in
CORRECTED CBR :
Curve Penetration Pressure CBR
No. in lbs/sq.in %
I 0,10 316,68 10,56
0,20 389,76 8,66
Averages :
Mass of Wet Soil + Container 269
Mass of Dry Soil + Container 244,7 8100
Mass of Container 144 4072
Mass of Wet Soil 125 4028
Mass of Dry Soil 100,7 2125
Weight Water 24,3 1,895529412
Water Content (%) 24,13108242 1,527038494
densitas cetakan
W4 = W2-W1 massa benda uji basah
W5 = W3-W1 volume mold
W6 = W4-W5 densitas basah
Mengetahui,
massa benda uji + cetakan Elapsed
Time DIAL READING
PRESSURE (lb/sqin)
ω = (W6/W5) x 100% densitas kering
W1 massa cetakan
W3 kadar air
W2 Pengujian : CBR Laboratorium Pemeraman : 0 hari
Sample : 65 Tumbukan
0 50 100 150 200 250 300 350 400 450
0 0,1 0,2 0,3
Beban (lb)
Penetrasi (in)
PROVING RING PENETRATION
Sec (inch) I I
0 0 0 0
15,00 0,0125 6,50 105,56
30,00 0,025 9,00 146,16
60,00 0,050 14,00 227,36
90,00 0,075 17,00 276,08
120,00 0,100 19,00 308,56
180,00 0,150 23,50 381,64
240,00 0,200 27,00 438,48
PROVING RING :
1 Calibration 16,240 lb/E-04 in
2 Calibration lb/E-04 in
CORRECTED CBR :
Curve Penetration Pressure CBR
No. in lbs/sq.in % 122,5
I 0,10 308,56 10,29
0,20 438,48 9,74
Averages :
Mass of Wet Soil + Container 274,5
Mass of Dry Soil + Container 248 7773
Mass of Container 142 4072
Mass of Wet Soil 132,5 3701
Mass of Dry Soil 106 2125
Weight Water 26,5 1,741647059
Water Content (%) 25 1,393317647
Mahasiswa densitas basah
Muhamad Habib Anwar Fatwari NIM. 3336180047 kadar air
W2 densitas cetakan
massa cetakan W4 = W2-W1
W6 = W4-W5
ω = (W6/W5) x 100% densitas kering
W3 massa benda uji + cetakan
Elapsed
Time DIAL READING
PRESSURE (lb/sqin)
NIM. 33361800
W1
massa benda uji basah
W5 = W3-W1 volume mold
Abdul Basit Alamsyah
Mengetahui, Asisten Laboratorium
LABORATORIUM JURUSAN TEKNIK SIPIL
BAHAN & BETON – SURVEYING – INVESTIGASI TANAH – HIDROLIKA FAKULTAS TEKNIK UNIVERSITAS SULTAN AGENG TIRTAYASA
Jl. Jendral Sudirman KM.3 Cilegon Tlp.(0254)395502/081287301294
Nama Proyek : Penelitian Tugas Akhir Muhamad Habib Anwar Fatwari Lokasi Pengujian : Laboratorium Teknik Sipil Untirta
Variasi : 5 % Serbuk Botol Kaca + 20% Steel Slag + 20% Fly Ash Pengujian : CBR Laboratoium
Pemeraman : 3 hari
Sample : 10 Tumbukan
0 60 120 180 240 300 360 420 480
0 0,1 0,2 0,3
Beban (lb)
Penetrasi (in)
PROVING RING PENETRATION
Sec (inch) I I
0 0 0 0
15,00 0,0125 15,00 243,60
30,00 0,025 20,00 324,80
60,00 0,050 27,00 438,48
90,00 0,075 34,00 552,16
120,00 0,100 40,00 649,60
180,00 0,150 49,00 795,76
240,00 0,200 53,00 860,72
PROVING RING :
1 Calibration 16,240 lb/E-04 in
2 Calibration lb/E-04 in
CORRECTED CBR :
Curve Penetration Pressure CBR
No. in lbs/sq.in %
I 0,10 649,60 21,65
0,20 860,72 19,13
Averages :
Mass of Wet Soil + Container 272,5
Mass of Dry Soil + Container 247 8069
Mass of Container 144 4072
Mass of Wet Soil 128,5 3997
Mass of Dry Soil 103 2125
Weight Water 25,5 1,880941176
Water Content (%) 24,75728155 1,507680476
kadar air
W2 densitas cetakan
W3 massa benda uji + cetakan
Elapsed Time
W1 massa cetakan
W4 = W2-W1 massa benda uji basah
W5 = W3-W1 volume mold
DIAL READING
PRESSURE (lb/sqin)
Mengetahui, ω = (W6/W5) x 100%
W6 = W4-W5 densitas basah
densitas kering Pengujian : CBR Laboratorium
Pemeraman : 3 hari
Sample : 30 Tumbukan
0 80 160 240 320 400 480 560 640 720 800 880 960
0 0,1 0,2 0,3
Beban (lb)
Penetrasi (in)
PROVING RING PENETRATION
Sec (inch) I I
0 0 0 0
15,00 0,0125 8,00 129,92
30,00 0,025 15,00 243,60
60,00 0,050 27,00 438,48
90,00 0,075 36,00 584,64
120,00 0,100 43,00 698,32
180,00 0,150 52,00 844,48
240,00 0,200 60,00 974,40
PROVING RING :
1 Calibration 16,240 lb/E-04 in
2 Calibration lb/E-04 in
CORRECTED CBR :
Curve Penetration Pressure CBR
No. in lbs/sq.in %
I 0,10 698,32 23,28
0,20 974,40 21,65
Averages :
Mass of Wet Soil + Container 266,5
Mass of Dry Soil + Container 242 8100
Mass of Container 142 4072
Mass of Wet Soil 124,5 4028
Mass of Dry Soil 100 2125
Weight Water 24,5 1,895529412
Water Content (%) 24,5 1,522513584
W6 = W4-W5 densitas basah
Mahasiswa
W1 massa cetakan
ω = (W6/W5) x 100% densitas kering
Mengetahui,
Abdul Basit Alamsyah NIM. 33361800
W4 = W2-W1 massa benda uji basah
W5 = W3-W1 volume mold
W2 densitas cetakan
W3 massa benda uji + cetakan
Elapsed
Time DIAL READING
PRESSURE (lb/sqin)
kadar air
Muhamad Habib Anwar Fatwari NIM. 3336180047 Asisten Laboratorium
LABORATORIUM JURUSAN TEKNIK SIPIL
BAHAN & BETON – SURVEYING – INVESTIGASI TANAH – HIDROLIKA FAKULTAS TEKNIK UNIVERSITAS SULTAN AGENG TIRTAYASA
Jl. Jendral Sudirman KM.3 Cilegon Tlp.(0254)395502/081287301294
Nama Proyek : Penelitian Tugas Akhir Muhamad Habib Anwar Fatwari Lokasi Pengujian : Laboratorium Teknik Sipil Untirta
Variasi : 5 % Serbuk Botol Kaca + 20% Steel Slag + 20% Fly Ash Pengujian : CBR Laboratorium
Pemeraman : 3 hari
Sample : 65 Tumbukan
0 80 160 240 320 400 480 560 640 720 800 880 960 1040
0 0,1 0,2 0,3
Beban (lb)
Penetrasi (in)
PROVING RING PENETRATION
Sec (inch) I I
0 0 0 0
15,00 0,0125 11,00 178,64
30,00 0,025 21,00 341,04
60,00 0,050 30,00 487,20
90,00 0,075 35,00 568,40
120,00 0,100 38,00 617,12
180,00 0,150 42,00 682,08
240,00 0,200 47,00 763,28
PROVING RING :
1 Calibration 16,240 lb/E-04 in
2 Calibration lb/E-04 in
CORRECTED CBR :
Curve Penetration Pressure CBR
No. in lbs/sq.in % 122,5
I 0,10 617,12 20,57
0,20 763,28 16,96
Averages :
Mass of Wet Soil + Container 292
Mass of Dry Soil + Container 262 7764
Mass of Container 142 4072
Mass of Wet Soil 150 3692
Mass of Dry Soil 120 2125
Weight Water 30 1,737411765
Water Content (%) 25 1,389929412
Mengetahui,
W6 = W4-W5 densitas basah
ω = (W6/W5) x 100% densitas kering
W3 massa benda uji + cetakan
W1 massa cetakan
W4 = W2-W1 massa benda uji basah
Elapsed
Time DIAL READING
kadar air
W2 densitas cetakan
PRESSURE (lb/sqin)
W5 = W3-W1 volume mold
Variasi : 5 % Serbuk Botol Kaca + 20% Steel Slag + 20% Fly Ash Pengujian : CBR Laboratoium
Pemeraman : 7 hari
Sample : 10 Tumbukan
0 80 160 240 320 400 480 560 640 720 800 880
0 0,1 0,2 0,3
Beban (lb)
Penetrasi (in)
PROVING RING PENETRATION
Sec (inch) I I
0 0 0 0
15,00 0,0125 21,00 341,04
30,00 0,025 36,00 584,64
60,00 0,050 43,00 698,32
90,00 0,075 54,00 876,96
120,00 0,100 62,00 1006,88
180,00 0,150 79,00 1282,96
240,00 0,200 86,00 1396,64
PROVING RING :
1 Calibration 16,240 lb/E-04 in
2 Calibration lb/E-04 in
CORRECTED CBR :
Curve Penetration Pressure CBR
No. in lbs/sq.in %
I 0,10 1006,88 33,56
0,20 1396,64 31,04
Averages :
Mass of Wet Soil + Container 294
Mass of Dry Soil + Container 264 8122
Mass of Container 142 4072
Mass of Wet Soil 152 4050
Mass of Dry Soil 122 2125
Weight Water 30 1,905882353
Water Content (%) 24,59016393 1,529721362
Mahasiswa
Muhamad Habib Anwar Fatwari NIM. 3336180047
W6 = W4-W5 densitas basah
ω = (W6/W5) x 100% densitas kering
Mengetahui,
W1 massa cetakan
W4 = W2-W1 massa benda uji basah
W5 = W3-W1 volume mold
Abdul Basit Alamsyah NIM. 33361800 Asisten Laboratorium
kadar air
W2 densitas cetakan
W3 massa benda uji + cetakan
Elapsed
Time DIAL READING
PRESSURE (lb/sqin)
LABORATORIUM JURUSAN TEKNIK SIPIL
BAHAN & BETON – SURVEYING – INVESTIGASI TANAH – HIDROLIKA FAKULTAS TEKNIK UNIVERSITAS SULTAN AGENG TIRTAYASA
Jl. Jendral Sudirman KM.3 Cilegon Tlp.(0254)395502/081287301294
Nama Proyek : Penelitian Tugas Akhir Muhamad Habib Anwar Fatwari Lokasi Pengujian : Laboratorium Teknik Sipil Untirta
Variasi : 5 % Serbuk Botol Kaca + 20% Steel Slag + 20% Fly Ash Pengujian : CBR Laboratorium
Pemeraman : 7 hari
Sample : 30 Tumbukan
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
0 0,1 0,2 0,3
Beban (lb)
Penetrasi (in)
PROVING RING PENETRATION
Sec (inch) I I
0 0 0 0
15,00 0,0125 17,00 276,08
30,00 0,025 32,00 519,68
60,00 0,050 47,00 763,28
90,00 0,075 56,00 909,44
120,00 0,100 65,00 1055,60
180,00 0,150 78,00 1266,72
240,00 0,200 89,00 1445,36
PROVING RING :
1 Calibration 16,240 lb/E-04 in
2 Calibration lb/E-04 in
CORRECTED CBR :
Curve Penetration Pressure CBR
No. in lbs/sq.in %
I 0,10 1055,60 35,19
0,20 1445,36 32,12
Averages :
Mass of Wet Soil + Container 296,5
Mass of Dry Soil + Container 266 8280
Mass of Container 141 4072
Mass of Wet Soil 155,5 4208
Mass of Dry Soil 125 2125
Weight Water 30,5 1,980235294
Water Content (%) ω = (W6/W5) x 100% 24,4 densitas kering 1,591829015
Mengetahui,
W1 massa cetakan
W4 = W2-W1 massa benda uji basah
W5 = W3-W1 volume mold
W3 massa benda uji + cetakan
Elapsed
Time DIAL READING
PRESSURE (lb/sqin)
W6 = W4-W5 densitas basah
kadar air
W2 densitas cetakan
Pengujian : CBR Laboratorium Pemeraman : 7 hari
Sample : 65 Tumbukan
0 150 300 450 600 750 900 1050 1200 1350 1500 1650
0 0,1 0,2 0,3
Beban (lb)
Penetrasi (in)
PROVING RING PENETRATION
Sec (inch) I I
0 0 0 0
15,00 0,0125 3,00 48,72
30,00 0,025 5,00 81,20
60,00 0,050 11,00 178,64
90,00 0,075 16,00 259,84
120,00 0,100 18,00 292,32
180,00 0,150 22,00 357,28
240,00 0,200 25,00 406,00
PROVING RING :
1 Calibration 16,240 lb/E-04 in
2 Calibration lb/E-04 in
CORRECTED CBR :
Curve Penetration Pressure CBR
No. in lbs/sq.in % 122,5
I 0,10 292,32 9,74
0,20 406,00 9,02
Averages :
Mass of Wet Soil + Container 288
Mass of Dry Soil + Container 259 7764,5
Mass of Container 141 4072
Mass of Wet Soil 147 3692,5
Mass of Dry Soil 118 2125
Weight Water 29 1,737647059
Water Content (%) 24,57627119 1,394845938
Abdul Basit Alamsyah NIM. 33361800
Asisten Laboratorium Mahasiswa
Muhamad Habib Anwar Fatwari NIM. 3336180047 kadar air
W2 densitas cetakan
W3 massa benda uji + cetakan
Elapsed
Time DIAL READING
PRESSURE (lb/sqin)
W6 = W4-W5 densitas basah
ω = (W6/W5) x 100% densitas kering
Mengetahui,
W1 massa cetakan
W4 = W2-W1 massa benda uji basah
W5 = W3-W1 volume mold
LABORATORIUM JURUSAN TEKNIK SIPIL
BAHAN & BETON – SURVEYING – INVESTIGASI TANAH – HIDROLIKA FAKULTAS TEKNIK UNIVERSITAS SULTAN AGENG TIRTAYASA
Jl. Jendral Sudirman KM.3 Cilegon Tlp.(0254)395502/081287301294
Nama Proyek : Penelitian Tugas Akhir Muhamad Habib Anwar Fatwari Lokasi Pengujian : Laboratorium Teknik Sipil Untirta
Variasi : 10 % Serbuk Botol Kaca + 20% Steel Slag + 20% Fly Ash Pengujian : CBR Laboratoium
Pemeraman : 0 hari
Sample : 10 Tumbukan
0 60 120 180 240 300 360 420 480
0 0,1 0,2 0,3
Beban (lb)
Penetrasi (in)
PROVING RING PENETRATION
Sec (inch) I I
0 0 0 0
15,00 0,0125 4,00 64,96
30,00 0,025 8,00 129,92
60,00 0,050 15,00 243,60
90,00 0,075 21,00 341,04
120,00 0,100 25,00 406,00
180,00 0,150 32,00 519,68
240,00 0,200 40,00 649,60
PROVING RING :
1 Calibration 16,240 lb/E-04 in
2 Calibration lb/E-04 in
CORRECTED CBR :
Curve Penetration Pressure CBR
No. in lbs/sq.in %
I 0,10 406,00 13,53
0,20 649,60 14,44
Averages :
Mass of Wet Soil + Container 273,5
Mass of Dry Soil + Container 248 8003
Mass of Container 144 4072
Mass of Wet Soil 129,5 3931
Mass of Dry Soil 104 2125
Weight Water 25,5 1,849882353
Water Content (%) 24,51923077 1,485619805
W6 = W4-W5 densitas basah
ω = (W6/W5) x 100% densitas kering
Mengetahui,
W1 massa cetakan
W4 = W2-W1 massa benda uji basah
W5 = W3-W1 volume mold
kadar air
W2 densitas cetakan
W3 massa benda uji + cetakan
Elapsed
Time DIAL READING
PRESSURE (lb/sqin) Pengujian : CBR Laboratorium
Pemeraman : 0 hari
Sample : 30 Tumbukan
0 100 200 300 400 500 600 700
0 0,1 0,2 0,3
Beban (lb)
Penetrasi (in)
PROVING RING PENETRATION
Sec (inch) I I
0 0 0 0
15,00 0,0125 7,00 113,68
30,00 0,025 13,00 211,12
60,00 0,050 20,00 324,80
90,00 0,075 26,00 422,24
120,00 0,100 30,00 487,20
180,00 0,150 34,00 552,16
240,00 0,200 38,00 617,12
PROVING RING :
1 Calibration 16,240 lb/E-04 in
2 Calibration lb/E-04 in
CORRECTED CBR :
Curve Penetration Pressure CBR
No. in lbs/sq.in %
I 0,10 487,20 16,24
0,20 617,12 13,71
Averages :
Mass of Wet Soil + Container 276
Mass of Dry Soil + Container 249,6 8150
Mass of Container 144 4072
Mass of Wet Soil 132 4078
Mass of Dry Soil 105,6 2125
Weight Water 26,4 1,919058824
Water Content (%) 25 1,535247059
Abdul Basit Alamsyah NIM. 33361800
Asisten Laboratorium Mahasiswa
Muhamad Habib Anwar Fatwari NIM. 3336180047 kadar air
W2 densitas cetakan
W3 massa benda uji + cetakan
Elapsed
Time DIAL READING
PRESSURE (lb/sqin)
W6 = W4-W5 densitas basah
ω = (W6/W5) x 100% densitas kering
Mengetahui,
W1 massa cetakan
W4 = W2-W1 massa benda uji basah
W5 = W3-W1 volume mold
LABORATORIUM JURUSAN TEKNIK SIPIL
BAHAN & BETON – SURVEYING – INVESTIGASI TANAH – HIDROLIKA FAKULTAS TEKNIK UNIVERSITAS SULTAN AGENG TIRTAYASA
Jl. Jendral Sudirman KM.3 Cilegon Tlp.(0254)395502/081287301294
Nama Proyek : Penelitian Tugas Akhir Muhamad Habib Anwar Fatwari Lokasi Pengujian : Laboratorium Teknik Sipil Untirta
Variasi : 10 % Serbuk Botol Kaca + 20% Steel Slag + 20% Fly Ash Pengujian : CBR Laboratorium
Pemeraman : 0 hari
Sample : 65 Tumbukan
0 80 160 240 320 400 480 560 640 720
0 0,1 0,2 0,3
Beban (lb)
Penetrasi (in)
PROVING RING PENETRATION
Sec (inch) I I
0 0 0 0
15,00 0,0125 5,00 81,20
30,00 0,025 8,00 129,92
60,00 0,050 12,00 194,88
90,00 0,075 17,00 276,08
120,00 0,100 21,00 341,04
180,00 0,150 30,00 487,20
240,00 0,200 38,00 617,12
PROVING RING :
1 Calibration 16,240 lb/E-04 in
2 Calibration lb/E-04 in
CORRECTED CBR :
Curve Penetration Pressure CBR
No. in lbs/sq.in % 122,5
I 0,10 341,04 11,37
0,20 617,12 13,71
Averages :
Mass of Wet Soil + Container 271
Mass of Dry Soil + Container 244,5 7918
Mass of Container 140 4072
Mass of Wet Soil 131 3846
Mass of Dry Soil 104,5 2125
Weight Water 26,5 1,809882353
Water Content (%) 25,35885167 1,443761114
W6 = W4-W5 densitas basah
ω = (W6/W5) x 100% densitas kering
Mengetahui,
W1 massa cetakan
W4 = W2-W1 massa benda uji basah
W5 = W3-W1 volume mold
kadar air
W2 densitas cetakan
W3 massa benda uji + cetakan
Elapsed
Time DIAL READING
PRESSURE (lb/sqin)
Variasi : 10 % Serbuk Botol Kaca + 20% Steel Slag + 20% Fly Ash Pengujian : CBR Laboratoium
Pemeraman : 3 hari
Sample : 10 Tumbukan
0 80 160 240 320 400 480 560 640 720
0 0,1 0,2 0,3
Beban (lb)
Penetrasi (in)
PROVING RING PENETRATION
Sec (inch) I I
0 0 0 0
15,00 0,0125 11,00 178,64
30,00 0,025 22,00 357,28
60,00 0,050 34,00 552,16
90,00 0,075 42,00 682,08
120,00 0,100 50,00 812,00
180,00 0,150 60,00 974,40
240,00 0,200 65,00 1055,60
PROVING RING :
1 Calibration 16,240 lb/E-04 in
2 Calibration lb/E-04 in
CORRECTED CBR :
Curve Penetration Pressure CBR
No. in lbs/sq.in %
I 0,10 812,00 27,07
0,20 1055,60 23,46
Averages :
Mass of Wet Soil + Container 276,5
Mass of Dry Soil + Container 250,3 8127
Mass of Container 144 4100
Mass of Wet Soil 132,5 4027
Mass of Dry Soil 106,3 2125
Weight Water 26,2 1,895058824
Water Content (%) 24,64722484 1,520337758
Abdul Basit Alamsyah NIM. 33361800
Asisten Laboratorium Mahasiswa
Muhamad Habib Anwar Fatwari NIM. 3336180047 kadar air
W2 densitas cetakan
W3 massa benda uji + cetakan
Elapsed
Time DIAL READING
PRESSURE (lb/sqin)
W6 = W4-W5 densitas basah
ω = (W6/W5) x 100% densitas kering
Mengetahui,
W1 massa cetakan
W4 = W2-W1 massa benda uji basah
W5 = W3-W1 volume mold
LABORATORIUM JURUSAN TEKNIK SIPIL
BAHAN & BETON – SURVEYING – INVESTIGASI TANAH – HIDROLIKA FAKULTAS TEKNIK UNIVERSITAS SULTAN AGENG TIRTAYASA
Jl. Jendral Sudirman KM.3 Cilegon Tlp.(0254)395502/081287301294
Nama Proyek : Penelitian Tugas Akhir Muhamad Habib Anwar Fatwari Lokasi Pengujian : Laboratorium Teknik Sipil Untirta
Variasi : 10 % Serbuk Botol Kaca + 20% Steel Slag + 20% Fly Ash Pengujian : CBR Laboratorium
Pemeraman : 3 hari
Sample : 30 Tumbukan
0 80 160 240 320 400 480 560 640 720 800 880 960 1040 1120
0 0,1 0,2 0,3
Beban (lb)
Penetrasi (in)
PROVING RING PENETRATION
Sec (inch) I I
0 0 0 0
15,00 0,0125 11,00 178,64
30,00 0,025 24,50 397,88
60,00 0,050 39,00 633,36
90,00 0,075 48,00 779,52
120,00 0,100 55,00 893,20
180,00 0,150 63,00 1023,12
240,00 0,200 68,00 1104,32
PROVING RING :
1 Calibration 16,240 lb/E-04 in
2 Calibration lb/E-04 in
CORRECTED CBR :
Curve Penetration Pressure CBR
No. in lbs/sq.in %
I 0,10 893,20 29,77
0,20 1104,32 24,54
Averages :
Mass of Wet Soil + Container 280,5
Mass of Dry Soil + Container 253,8 8231
Mass of Container 144 4100
Mass of Wet Soil 136,5 4131
Mass of Dry Soil 109,8 2125
Weight Water 26,7 1,944
Water Content (%) 24,31693989 1,563745055
W6 = W4-W5 densitas basah
ω = (W6/W5) x 100% densitas kering
Mengetahui,
W1 massa cetakan
W4 = W2-W1 massa benda uji basah
W5 = W3-W1 volume mold
kadar air
W2 densitas cetakan
W3 massa benda uji + cetakan
Elapsed
Time DIAL READING
PRESSURE (lb/sqin) Pengujian : CBR Laboratorium
Pemeraman : 3 hari
Sample : 65 Tumbukan
0 80 160 240 320 400 480 560 640 720 800 880 960 1040 1120 1200
0 0,1 0,2 0,3
Beban (lb)
Penetrasi (in)
PROVING RING PENETRATION
Sec (inch) I I
0 0 0 0
15,00 0,0125 10,00 162,40
30,00 0,025 18,00 292,32
60,00 0,050 25,00 406,00
90,00 0,075 28,00 454,72
120,00 0,100 31,00 503,44
180,00 0,150 34,00 552,16
240,00 0,200 38,00 617,12
PROVING RING :
1 Calibration 16,240 lb/E-04 in
2 Calibration lb/E-04 in
CORRECTED CBR :
Curve Penetration Pressure CBR
No. in lbs/sq.in % 122,5
I 0,10 503,44 16,78
0,20 617,12 13,71
Averages :
Mass of Wet Soil + Container 279,5
Mass of Dry Soil + Container 251 8065
Mass of Container 141 4275
Mass of Wet Soil 138,5 3790
Mass of Dry Soil 110 2125
Weight Water 28,5 1,783529412
Water Content (%) 25,90909091 1,416521554
Abdul Basit Alamsyah NIM. 33361800
Asisten Laboratorium Mahasiswa
Muhamad Habib Anwar Fatwari NIM. 3336180047 kadar air
W2 densitas cetakan
W3 massa benda uji + cetakan
Elapsed
Time DIAL READING
PRESSURE (lb/sqin)
W6 = W4-W5 densitas basah
ω = (W6/W5) x 100% densitas kering
Mengetahui,
W1 massa cetakan
W4 = W2-W1 massa benda uji basah
W5 = W3-W1 volume mold
LABORATORIUM JURUSAN TEKNIK SIPIL
BAHAN & BETON – SURVEYING – INVESTIGASI TANAH – HIDROLIKA FAKULTAS TEKNIK UNIVERSITAS SULTAN AGENG TIRTAYASA
Jl. Jendral Sudirman KM.3 Cilegon Tlp.(0254)395502/081287301294
Nama Proyek : Penelitian Tugas Akhir Muhamad Habib Anwar Fatwari Lokasi Pengujian : Laboratorium Teknik Sipil Untirta
Variasi : 10 % Serbuk Botol Kaca + 20% Steel Slag + 20% Fly Ash Pengujian : CBR Laboratoium
Pemeraman : 7 hari
Sample : 10 Tumbukan
0 80 160 240 320 400 480 560 640 720
0 0,1 0,2 0,3
Beban (lb)
Penetrasi (in)
PROVING RING PENETRATION
Sec (inch) I I
0 0 0 0
15,00 0,0125 11,00 178,64
30,00 0,025 23,00 373,52
60,00 0,050 32,00 519,68
90,00 0,075 41,00 665,84
120,00 0,100 53,00 860,72
180,00 0,150 61,00 990,64
240,00 0,200 68,00 1104,32
PROVING RING :
1 Calibration 16,240 lb/E-04 in
2 Calibration lb/E-04 in
CORRECTED CBR :
Curve Penetration Pressure CBR
No. in lbs/sq.in %
I 0,10 860,72 28,69
0,20 1104,32 24,54
Averages :
Mass of Wet Soil + Container 273
Mass of Dry Soil + Container 247 8300
Mass of Container 142 4286
Mass of Wet Soil 131 4014
Mass of Dry Soil 105 2125
Weight Water 26 1,888941176
Water Content (%) 24,76190476 1,514036821
W6 = W4-W5 densitas basah
ω = (W6/W5) x 100% densitas kering
Mengetahui,
W1 massa cetakan
W4 = W2-W1 massa benda uji basah
W5 = W3-W1 volume mold
kadar air
W2 densitas cetakan
W3 massa benda uji + cetakan
Elapsed
Time DIAL READING
PRESSURE (lb/sqin) Pengujian : CBR Laboratorium
Pemeraman : 7 hari
Sample : 30 Tumbukan
0 120 240 360 480 600 720 840 960 1080 1200
0 0,1 0,2 0,3
Beban (lb)
Penetrasi (in)
PROVING RING PENETRATION
Sec (inch) I I
0 0 0 0
15,00 0,0125 9,00 146,16
30,00 0,025 16,00 259,84
60,00 0,050 34,00 552,16
90,00 0,075 46,00 747,04
120,00 0,100 57,00 925,68
180,00 0,150 65,00 1055,60
240,00 0,200 74,00 1201,76
PROVING RING :
1 Calibration 16,240 lb/E-04 in
2 Calibration lb/E-04 in
CORRECTED CBR :
Curve Penetration Pressure CBR
No. in lbs/sq.in %
I 0,10 925,68 30,86
0,20 1201,76 26,71
Averages :
Mass of Wet Soil + Container 278
Mass of Dry Soil + Container 250,8 8324
Mass of Container 143 4275
Mass of Wet Soil 135 4049
Mass of Dry Soil 107,8 2125
Weight Water 27,2 1,905411765
Water Content (%) 25,23191095 1,52150658
Abdul Basit Alamsyah NIM. 33361800
Asisten Laboratorium Mahasiswa
Muhamad Habib Anwar Fatwari NIM. 3336180047 kadar air
W2 densitas cetakan
W3 massa benda uji + cetakan
Elapsed
Time DIAL READING
PRESSURE (lb/sqin)
W6 = W4-W5 densitas basah
ω = (W6/W5) x 100% densitas kering
Mengetahui,
W1 massa cetakan
W4 = W2-W1 massa benda uji basah
W5 = W3-W1 volume mold
LABORATORIUM JURUSAN TEKNIK SIPIL
BAHAN & BETON – SURVEYING – INVESTIGASI TANAH – HIDROLIKA FAKULTAS TEKNIK UNIVERSITAS SULTAN AGENG TIRTAYASA
Jl. Jendral Sudirman KM.3 Cilegon Tlp.(0254)395502/081287301294
Nama Proyek : Penelitian Tugas Akhir Muhamad Habib Anwar Fatwari Lokasi Pengujian : Laboratorium Teknik Sipil Untirta
Variasi : 10 % Serbuk Botol Kaca + 20% Steel Slag + 20% Fly Ash Pengujian : CBR Laboratorium
Pemeraman : 7 hari
Sample : 65 Tumbukan
0 150 300 450 600 750 900 1050 1200 1350
0 0,1 0,2 0,3
Beban (lb)
Penetrasi (in)
PROVING RING PENETRATION
Sec (inch) I I
0 0 0 0
15,00 0,0125 3,00 48,72
30,00 0,025 4,00 64,96
60,00 0,050 6,00 97,44
90,00 0,075 8,00 129,92
120,00 0,100 10,00 162,40
180,00 0,150 13,00 211,12
240,00 0,200 16,00 259,84
PROVING RING :
1 Calibration 16,240 lb/E-04 in
2 Calibration lb/E-04 in
CORRECTED CBR :
Curve Penetration Pressure CBR
No. in lbs/sq.in % 122,5
I 0,10 162,40 5,41
0,20 259,84 5,77
Averages :
Mass of Wet Soil + Container 269,5
Mass of Dry Soil + Container 244 7917
Mass of Container 141 4072
Mass of Wet Soil 128,5 3845
Mass of Dry Soil 103 2125
Weight Water 25,5 1,809411765
Water Content (%) 24,75728155 1,450345617
kadar air
W2 densitas cetakan
W3 massa benda uji + cetakan
W1 massa cetakan
W4 = W2-W1 massa benda uji basah
W5 = W3-W1 volume mold
W6 = W4-W5 densitas basah
ω = (W6/W5) x 100% densitas kering
Mengetahui, Elapsed
Time DIAL READING
PRESSURE (lb/sqin)
Variasi : 15 % Serbuk Botol Kaca + 20% Steel Slag + 20% Fly Ash Pengujian : CBR Laboratoium
Pemeraman : 0 hari
Sample : 10 Tumbukan
0 40 80 120 160 200 240 280
0 0,1 0,2 0,3
Beban (lb)
Penetrasi (in)
PROVING RING PENETRATION
Sec (inch) I I
0 0 0 0
15,00 0,0125 4,00 64,96
30,00 0,025 7,00 113,68
60,00 0,050 10,00 162,40
90,00 0,075 13,00 211,12
120,00 0,100 15,00 243,60
180,00 0,150 18,00 292,32
240,00 0,200 21,00 341,04
PROVING RING :
1 Calibration 16,240 lb/E-04 in
2 Calibration lb/E-04 in
CORRECTED CBR :
Curve Penetration Pressure CBR
No. in lbs/sq.in %
I 0,10 243,60 8,12
0,20 341,04 7,58
Averages :
Mass of Wet Soil + Container 284,5
Mass of Dry Soil + Container 257 8044
Mass of Container 144 4072
Mass of Wet Soil 140,5 3972
Mass of Dry Soil 113 2125
Weight Water 27,5 1,869176471
Water Content (%) 24,33628319 1,503323425
Abdul Basit Alamsyah NIM. 33361800
Muhamad Habib Anwar Fatwari NIM. 3336180047
W3 massa benda uji + cetakan
W1 massa cetakan
W4 = W2-W1 massa benda uji basah
W5 = W3-W1 volume mold
W6 = W4-W5 densitas basah
ω = (W6/W5) x 100% densitas kering
Mengetahui,
Asisten Laboratorium Mahasiswa
Elapsed
Time DIAL READING
PRESSURE (lb/sqin)
kadar air
W2 densitas cetakan
LABORATORIUM JURUSAN TEKNIK SIPIL
BAHAN & BETON – SURVEYING – INVESTIGASI TANAH – HIDROLIKA FAKULTAS TEKNIK UNIVERSITAS SULTAN AGENG TIRTAYASA
Jl. Jendral Sudirman KM.3 Cilegon Tlp.(0254)395502/081287301294
Nama Proyek : Penelitian Tugas Akhir Muhamad Habib Anwar Fatwari Lokasi Pengujian : Laboratorium Teknik Sipil Untirta
Variasi : 15 % Serbuk Botol Kaca + 20% Steel Slag + 20% Fly Ash Pengujian : CBR Laboratorium
Pemeraman : 0 hari
Sample : 30 Tumbukan
0 100 200 300 400
0 0,1 0,2 0,3
Beban (lb)
Penetrasi (in)