Water and Rivers Commission (WRC) 2000, Water Fact 14: Floodplain Management, Perth.

Water and Rivers Commission (WRC) 2001a, River Restoration: Determining Foreshore Reserves. Report No. RR16, East Perth.

Water and Rivers Commission (WRC) 2001b, Water Note 23: Determining Foreshore Reserves, East Perth.

Figure 1: Site Location

Figure 2: Topographic Contours and Maximum Groundwater Level Contours Figure 3: Geological Mapping

Figure 4: Acid Sulfate Soil Risk Mapping

Figure 5: Public Drinking Water Source Area and Production Bores Figure 6: Existing Private Groundwater Licences

Figure 7: Surface Water Features and Pre-development Peak Flow Rates Figure 8: Wetland Mapping

Figure 9: Stormwater Management Plan

Figure 10: Innundation Mapping – Small Rainfall Event Figure 11: Innundation Mapping – Minor Rainfall Event Figure 12: Innundation Mapping – Major Rainfall Event

Figures

Cob Road AsturianDrive

Bildersee Avenue

Losino B oulevard

Martingale Avenue And

rea D rive

Henley Brook Avenu

Georgeff Street Henley Street West

Sandown Circle

Saunders Street John Street

Robert Street

Brooklands Drive

Henley Street

LordStre

et

Park Street Pine Street

402000 403000 404000 405000

6480000 6480000

6481000 6481000

Site boundary Cadastral boundary

±

Scale: 1:15,000@A4

0 200 400 600

Metres Local Water Management Strategy

Site Location Figure 1:

Project:

Plan Number:

EP18-098(05)--F17b Drawn:

Date:

Checked:

KNM 18/07/2019 ASC

Site Location

&

(

&

(

&

(

&

& ( (

&

(

&

(

&

(

&

(

Cob Road AsturianDrive

Bildersee Avenue

Losino B oulevard

Martingale Avenue And

rea D rive

Henley Brook Aven

GeorgeffStreet Henley Street West

Sandown Circle

Saunders Street John Street

Robert Street

Brooklands Drive

Henley Street

LordStre

et

Park Street Pine Street

20

5045

40

50 45

40 35

35 40 35

50

45 50

45

40

40

35

35

35 35 30

50

50

40

40 40 40

40

40

35

35

35 35

40

40

40 40

35

30 30

35

36 34

32 37

33

31 38

35

37

33

31 34

32

30 36

MW0430.7 MW0334.44

MW0534.59

MW0632.91

MW0730.643 MW0235.25

61610563

61611024

61611025

401000 402000 403000 404000

6480000 6480000

6481000 6481000

Site boundary Cadastral boundary Topographic contour (mAHD)

Maximum groundwater level contour (m AHD) Average annual maximum groundwater level contour (m AHD)(RPS 2019)

&

( Groundwater monitoring bore and measured maximum groundwater level (m AHD)

&

( DWER monitoring bore

±

Scale: 1:15,000@A4

0 200 400 600

Metres Local Water Management Strategy

Topographic and Groundwater Level Contours Figure 2:

Project:

Plan Number:

EP18-098(05)--F18b Drawn:

Date:

Checked:

KNM 18/07/2019 ASC

&

(

&

(

&

(

&

& ( (

&

( &(

&

(

&

(

&

(

&

& ( (

&

(

&

(

&

(

&

(

&

(

&

(

&

(

&

(

E D

E D

E D

E D

E D E D

E D

E D

E D

E D

E D

E D

E D

E D E D

E D E D

E D

E D

&

,

&

, &,

&

,

&

,

&

,

&

,

&

,

Cob Road AsturianDrive

Bildersee Avenue

Losino B oulevard

Martingale Avenue And

rea D rive

Henley Brook Aven

GeorgeffStreet Henley Street West

Sandown Circle

Saunders Street John Street

Robert Street

Brooklands Drive

Henley Street

LordStre

et

Park Street Pine Street

S10

Cps

Mgs1

Cps

Cps

S8 S8

S10

S10

Mgs1 Mgs1 S10

S10

TP01 TP03

TP04 TP05

TP06 TP07

TP08

TP09

TP10 TP11

TP12

TP13 TP14 TP15 TP16

TP17 TP18

TP19

TP20 HA01

HA02

HA03

HA04

HA05

HA06

HA07

HA08

ALB2 ALB1 BH1

BH2

BH3 HA01 HA02

HA03

HA04 HA05 HA07 HA06

HA08

HA09 HA10

HA11 HA12

HA13 HA14

HA15

401000 402000 403000 404000

6480000 6480000

6481000 6481000

Site boundary Cadastral boundary

&

( Borehole (JDSi 2018)

&

, Borehole (Galt Geotechnics 2019) E

D Test pit (Galt Geotechnics 2019) Groundwater monitoring bores

&

( Parsons Brinckerhoff

&

( Water and Rivers Commission Geology

Cps Peaty clay - dark grey and black with variable sand content of lacustrine origin.

Mgs1 Pebbly silt - strong brown silt with common, fine to occasionally coarse-grained, sub- rounded laterite quartz, heavily weathered granite pebble, some fine to medium-grained quartz sand, of alluvial origin.

S8 Sand - very light grey at surface, yellow at depth, fine to medium-grained, sub-rounded quartz, moderately well sorted of eolian origin.

S10 Sand - as S8.

±

Scale: 1:15,000@A4

0 200 400 600

Metres Local Water Management Strategy

Geological Mapping Figure 3:

Project:

Plan Number:

EP18-098(05)--F19c Drawn:

Date:

Checked:

GAR 05/01/2020 ASC

Cob Road AsturianDrive

Bildersee Avenue

Losino B oulevard

Martingale Avenue And

rea D rive

Henley Brook Aven

GeorgeffStreet Henley Street West

Sandown Circle

Saunders Street John Street

Robert Street

Brooklands Drive

Henley Street

LordStre

et

Park Street Pine Street

401000 402000 403000 404000

6480000 6480000

6481000 6481000

Site boundary Cadastral boundary Acid Sulfate Soils

High to moderate risk Moderate to low risk

±

Scale: 1:15,000@A4

0 200 400 600

Metres Local Water Management Strategy

Acid Sulfate Soil Risk Mapping Figure 4:

Project:

Plan Number:

EP18-098(05)--F20b Drawn:

Date:

Checked:

KNM 18/07/2019 ASC

&

<

&

<

Cob Road AsturianDrive

Bildersee Avenue

Losino B oulevard

Martingale Avenue And

rea D rive

Henley Brook Aven

GeorgeffStreet Henley Street West

Sandown Circle

Saunders Street John Street

Robert Street

Brooklands Drive

Henley Street

LordStre

et

Park Street Pine Street

L320

M282; M285

401000 402000 403000 404000

6480000 6480000

6481000 6481000

Site boundary Cadastral boundary

Wellhead protection zone (DWER 2020)

&

< Production bore (DWER 2020) Public Drinking Water Source Area (DWER 2020)

@ @ @ @

@ @ @Priority 1@

@ @ @ @

@ @ @Priority 2@

@ @ @ @

@ @ @Priority 3@

±

Scale: 1:15,000@A4

0 200 400 600

Metres Local Water Management Strategy

Public Drinking Water Source Area and Production Bores Figure 5:

Project:

Plan Number:

EP18-098(05)--F21c Drawn:

Date:

Checked:

GAR 05/01/2020 ASC

Cob Road AsturianDrive

Bildersee Avenue

Losino B oulevard

Martingale Avenue And

rea D rive

Henley Brook Aven

GeorgeffStreet Henley Street West

Sandown Circle

Saunders Street John Street

Robert Street

Brooklands Drive

Henley Street

LordStre

et Park Street

Pine Street

Henley Brook Groundwater Subarea

401000 402000 403000 404000

6480000 6480000

6481000 6481000

Site boundary Cadastral boundary Groundwater licence holder (DWER 2020b) Groundwater subarea (DoW 2015)

±

Scale: 1:15,000@A4

0 200 400 600

Metres Local Water Management Strategy

Existing Private Groundwater Licences Figure 6:

Project:

Plan Number:

EP18-098(05)--F22c Drawn:

Date:

Checked:

GAR 06/05/2020 ASC

?

? Lot No.:GWL No.: 9388460

Volume: 8500 kL

Valid: 17/08/11 to 17/08/21

Lot No.: 99

GWL No.: 178436

Volume: 9045 kL

Valid: 03/06/14 to 03/06/24

?

?

?

?

?

?? ?

Lot No.: 125

GWL No.: 175679

Volume: 12755 kL

Valid: 03/07/12 to 03/07/22

Lot No.: 144

GWL No.: 157263

Volume: 10500 kL

Valid: 07/09/17 to 06/09/27

Lot No.: 146

GWL No.: 58199

Volume: 12450 kL

Valid: 13/03/14 to 12/02/23

?

Lot No.: 112

GWL No.: 155819

Volume: 13750 kL

Valid: 06/04/16 to 05/03/26

?

?

?

Lot No.: 128

GWL No.: 154043

Volume: 11950 kL

Valid: 26/11/14 to 25/11/24

Lot No.: 163

GWL No.: 152583

Volume: 5650 kL

Valid: 20/11/06 to 27/10/26

Lot No.: 86

GWL No.: 167506

Volume: 13020 kL

Valid: 23/10/18 to 22/10/28 Valid: 26/02/20 to 21/08/22

Lot No.: 115

GWL No.: 157142

Volume: 12250 kL

Valid: 21/05/19 to 20/05/29

Lot No.: 113

GWL No.: 155616

Volume: 11750 kL

Valid: 14/04/20 to 14/04/30

Lot No.: 90

GWL No.: 160539

Volume: 12270 kL

Valid: 12/11/19 to 11/11/29

Lot No.: 106

GWL No.: 182425

Volume: 11500kL

Valid: 26/02/20 to 28/011/24

_

_

_

! .

!

! .

. !.

SaintLe

onards Creek

Cob Road AsturianDrive

Bildersee Avenue

Losino B oulevard

Martingale Avenue And

rea D rive

Henley Brook Aven

GeorgeffStreet Henley Street West

Sandown Circle

Saunders Street John Street

Robert Street

Brooklands Drive

Henley Street

LordStre

et

Park Street Pine Street

401000 402000 403000 404000

6480000 6480000

6481000 6481000

Site boundary Cadastral boundary Drain / watercourse

! . Sump

_ Discharge location

100 year ARI floodplain (DWER 2019)

±

Scale: 1:15,000@A4

0 200 400 600

Metres Local Water Management Strategy

Surface Water Features and Pre-development Peak Flow Rates Figure 7:

Project:

Plan Number:

EP18-098(05)--F23c Drawn:

Date:

Checked:

GAR 06/05/2020 ASC

?

?

Eastern Discharge (St Leonards Creek) Flow Rate (m3/s)

1% AEP 1.45

20% AEP 0.73

?

Eastern Discharge (South) Flow Rate (m3/s)

1% AEP 0.48

20% AEP 0.16

Southern Discharge (Park Street) Flow Rate (m3/s)

1% AEP 1.2

20% AEP 0.38

M o r g a n F i e l d s E s t a t e M o r g a n F i e l d s E s t a t e

A v o n l e e E s t a t e A v o n l e e E s t a t e

Cob Road AsturianDrive

Bildersee Avenue

Losino B oulevard

Martingale Avenue And

rea D rive

Henley Brook Aven

GeorgeffStreet Henley Street West

Sandown Circle

Saunders Street John Street

Robert Street

Brooklands Drive

Henley Street

LordStre

et

Park Street Pine Street

15353UFI

UFI 8804 8410UFI

UFI 13758

UFI 13772 15352UFI

UFI 13396

UFI 13396 UFI 13396

UFI 13396

401000 402000 403000 404000

6480000 6480000

6481000 6481000

Site boundary Cadastral boundary

Geomorphic wetlands (DBCA Mar 2018) Conservation

Resource Enhancement Multiple Use

±

Scale: 1:15,000@A4

0 200 400 600

Metres Local Water Management Strategy

Wetland Mapping Figure 8:

Project:

Plan Number:

EP18-098(05)--F24b Drawn:

Date:

Checked:

KNM 19/07/2019 ASC

Henle y Bro

ok A ven

ue

DianePlace

AsturianDrive Losino B

oulevard

Saunders Street John Street And

rea D rive

Henley Street West

S andownCircle Robert Street

Henley Street

Brooklands Drive

Lord Street

Park Street Ct 9

Ct 6

Ct 7 Ct 5

Ct 10 Ct 8

Ct 11 Ct 4

Ct 3

401000 402000 403000 404000

6480000 6480000

6481000 6481000

Site boundary Cadastral boundary

Post-development catchment boundary (KCTT 2020) Bio-retention area

Detention area

Saint Leonards Creek living stream Structure plan

Residential Public open space

Public purpose (primary school) Public purpose (Water Corporation) Road

Other regional road

±

Scale: 1:13,000@A4

0 200 400

Metres Local Water Management Strategy

Stormwater Management Plan Figure 9:

Project:

Plan Number:

EP18-098(05)--F59b Drawn:

Date:

Checked:

GAR 31/07/2020 ASC

Henle y Bro

ok A ven

ue

DianePlace

AsturianDrive Losino B

oulevard

Saunders Street John Street And

rea D rive

Henley Street West

S andownCircle Robert Street

Henley Street

Brooklands Drive

Lord Street

Park Street Ct 9

Ct 6

Ct 7 Ct 5

Ct 10 Ct 8

Ct 11 Ct 4

Ct 3

401000 402000 403000 404000

6480000 6480000

6481000 6481000

Site boundary Cadastral boundary

Post-development catchment boundary (KCTT 2020) Bio-retention area

Detention area

Saint Leonards Creek living stream Inundation area

Structure plan Residential Public open space

Public purpose (primary school) Public purpose (Water Corporation) Road

Other regional road

±

Scale: 1:13,000@A4

0 200 400

Metres Local Water Management Strategy

Inundation Mapping - Small Rainfall Event Figure 10:

Project:

Plan Number:

EP18-098(05)--F60b Drawn:

Date:

Checked:

GAR 31/07/2020 ASC

Henle y Bro

ok A ven

ue

DianePlace

AsturianDrive Losino B

oulevard

Saunders Street John Street And

rea D rive

Henley Street West

S andownCircle Robert Street

Henley Street

Brooklands Drive

Lord Street

Park Street Ct 9

Ct 6

Ct 7 Ct 5

Ct 10 Ct 8

Ct 11 Ct 4

Ct 3

401000 402000 403000 404000

6480000 6480000

6481000 6481000

Site boundary Cadastral boundary

Post-development catchment boundary (KCTT 2020) Bio-retention area

Detention area

Saint Leonards Creek living stream Inundation area

Structure plan Residential Public open space

Public purpose (primary school) Public purpose (Water Corporation) Road

Other regional road

±

Scale: 1:13,000@A4

0 200 400

Metres Local Water Management Strategy

Inundation Mapping - Minor Rainfall Event Figure 11:

Project:

Plan Number:

EP18-098(05)--F61b Drawn:

Date:

Checked:

GAR 31/07/2020 ASC

Henle y Bro

ok A ven

ue

DianePlace

AsturianDrive Losino B

oulevard

Saunders Street John Street And

rea D rive

Henley Street West

S andownCircle Robert Street

Henley Street

Brooklands Drive

Lord Street

Park Street Ct 9

Ct 6

Ct 7 Ct 5

Ct 10 Ct 8

Ct 11 Ct 4

Ct 3

401000 402000 403000 404000

6480000 6480000

6481000 6481000

Site boundary Cadastral boundary

Post-development catchment boundary (KCTT 2020) Bio-retention area

Detention area

Saint Leonards Creek living stream Inundation area

Structure plan Residential Public open space

Public purpose (primary school) Public purpose (Water Corporation) Road

Other regional road

±

Scale: 1:13,000@A4

0 200 400

Metres Local Water Management Strategy

Inundation Mapping- Major Rainfall Event Figure 12:

Project:

Plan Number:

EP18-098(05)--F62b Drawn:

Date:

Checked:

GAR 31/07/2020 ASC

Appendix A

Structure Plan

4.0000ha

3.3477ha

Partridge Street 1.7031ha

WC

POS 4

Henley Street

Drive POS 7

0.8669ha

Henley

Drumpellier

3.9531ha Place

POS 10 POS 3

PS PS

Lord Street

Gnangara Road

Place 4.1198ha

Starflower

Brooklands

Fairmount Blvd

Asturian Drive

Road

Pine Street

Martingale Ave Andrea Drive

Petrana

Losino Blvd

Park Street Martingale Ave

Pinaster Pde

Arpent Link POS 12

WC

1.8886ha

4.1171ha

Drive

POS 8

Brook

POS 9 1.3363ha

Ave

POS 2 1.5805ha POS 1

0.5751ha

POS 13 3.4138ha POS 11

0.5041ha

1m WIDENING ON NORTHERN SIDE OF PARK STREET (21m) NO WIDENING ADJACENT

TO WC SITE (20m) HENLEY BROOK

BUS STATION

POS 6 3.4958ha

3.4407ha POS 5 A1

NORTH All areas and dimensions are subject to survey, engineering and detailed design

and may change without notice. © Copyright of Burgess Design Group.

0 100 200 300m

SCALE 1:7,500 50

25

(A3)

RESIDENTIAL (R30-R60) WITH ADDITIONAL USE FOR DISPLAY HOME CENTRE & RESIDENTIAL SALES OFFICE*

PUBLIC OPEN SPACE

PUBLIC PURPOSES - PRIMARY SCHOOL PUBLIC PURPOSES - WATER CORPORATION ADDITIONAL USE - PARK HOME PARK*

ROAD NETWORK

INTEGRATOR B (25.2m)

NEIGHBOURHOOD CONNECTOR A (24.4m)**

NEIGHBOURHOOD CONNECTOR B (19.4m) ACCESS STREET B (17.9m)

ACCESS STREET C (17.9m)*

ACCESS STREET D (15m)***

SAFE ACTIVE STREET (15m)*

LANEWAY (6m)

INDICATIVE EXTERNAL ROADS ROUNDABOUT INTERSECTION****

LEFT-IN/LEFT-OUT INTERSECTION****

OTHER

INDICATIVE ST LEONARDS CREEK ALIGNMENT (SUBJECT TO FURTHER ASSESSMENT)

GAS PIPELINE EASEMENT NOISE ASSESSMENT REQUIRED POSSIBLE FUTURE LIFESTYLE VILLAGE FUTURE RAILWAY

POSSIBLE BLACK COCKATOO ROOST TREE TO BE RETAINED

NOTES:

*REFER TO STRUCTURE PLAN REPORT FOR DETAIL

**PARK STREET TO BE 21m (1m WIDENING ON NORTHERN SIDE) WITH NO ON-STREET OR EMBAYED PARKING, EXCEPT ADJACENT TO THE 'PUBLIC PURPOSES (WC)' SITE, WHICH IS TO REMAIN UNCHANGED AT 20m.

***MAY BE REDUCED TO 13m ADJACENT TO PUBLIC OPEN SPACE AND/OR ABUTTING ANOTHER ROAD RESERVE, OR 10m WHERE USED AS A CONTROLLED ACCESS PLACE

****REMAINING INTERSECTIONS TO BE PRIORITY CONTROLLED

HENLEY BROOK HENLEY BROOK STRUCTURE PLAN PLAN 1: STRUCTURE PLAN MAP

PS WC

A1

DRAFT

Appendix B

Albion Park Estate Groundwater Monitoring and Surface

Runoff Modelling

#

*

#

*

#*

#

*

"

"

"

"

"

"

"

"

!

<

!

< !<

!

<

!

<

!<

!

<

!

<

!

<

"

!<

!

<

"

!

<

"

!<

! .

! .

! .

!.

YOULE-DEAN RD WOOLLCOTT AVE

PARK ST

LORD ST

W EST SWAN R

D

MM71

MM52 MM56B

BH5 ALB7

MM27

BH9

BH8 BH7

BH6

BH4 BH3

BH2 BH1

BH11

BH10

APW5

APW2 APW1

ALB9

ALB6

ALB5 ALB3 ALB4

ALB2 ALB1

ALB10 S3

S2

S1 Rain Gauge

0 250 500 750 1,000

Meters

!

< WRC

!

. JDA Surface Water Monitoring Sites

Job No. J4070

Albion Local Water Management Strategy Figure 10: Monitoring Locations Multiplex Developments Australia Pty Ltd

© COPYRIGHT JIM DAVIES & ASSOCIATES PTY. LTD. 2008

±

Scale 1:25,000

Data Source: Parsons and Brinckerhoff (2004) and JDA (2006-2008).

Figure D1: Water Levels in Albion Monitoring Bores

Job No. J4070 Multiplex Developments Australia Pty Ltd

Albion Local Water Management Strategy

JDA

ConsultantHydrologists

10 15 20 25

Sep-01 Dec-01 Mar-02 Jun-02 Sep-02 Nov-02 Feb-03 May-03 Aug-03 Nov-03 Feb-04 May-04 Aug-04 Nov-04 Feb-05 May-05 Aug-05 Nov-05 Feb-06 May-06 Aug-06 Nov-06 Feb-07 May-07 Aug-07 Nov-07 Feb-08

Date

Water Level (mAHD)

ALB1 ALB2 ALB3 ALB4 ALB5 ALB6 ALB7 ALB8 ALB9 ALB10 APW1 APW2 APW5

BH1 BH2 BH3 BH4 BH5 BH6 BH7 BH8 BH9 BH10 BH11

WOOLLCOTT AVE

PARK ST

LORD ST

YOULE-DEAN RD

SWAN R D

Peak Flow 0.72 m3/s

Peak Flow 1.91 m3/s

Peak Flow 0.92 m3/s Peak Flow 4.85 m3/s

Peak Flow 0.61 m3/s Peak Flow

1.86 m3/s

Peak Flow 4.02 m3/s

278 ha

208 ha

114 ha

25

20 30

35

15

10 40

25 30

30

15 30

30

30

30

30

30

30

15 30

30

10 35

20 35

25

20 30

20 25

20

25

25

30

35

25

10 35

10 30

35 35

30 30

15

15

30

25 15 30

35

30

25

20

25

20 30

35

30 30

35

20

15

0 250 500 750 1,000

Meters Job No. J4070

Albion Local Water Management Strategy Figure 2: Existing Surface Water Catchments and Peak Flows Multiplex Developments Australia Pty Ltd Data Source: Catchments as defined by GB Hill & Partners (1995); Fugro (2006) Topography.

© COPYRIGHT JIM DAVIES & ASSOCIATES PTY. LTD. 2008

±

Scale 1:20,000

Catchments

St. Leonards Creek Horse Swamp Wandoo Creek

Appendix C

Henley Brook Bore Logs

Dry Moist

Wet

Steel casing PVC standpipe Concrete seal Blank casing Bentonite seal

Gravel pack Slotted screen

Sand Backfill 0.00m: TOPSOIL WITH ORGANIC MATTER, grey, medium to

coarse grained.

0.10m: SAND, dark-brown, medium grained. Colour lightens with depth.

1.80m: SAND, cream, medium grained.

Total Bore Depth: 5.00 mBGL DATE STARTED: 29/09/2015

DATE COMPLETED: 29/09/2015 DRILLING CONTRACTOR: Strataprobe

DEPTH WATERTO GRAPHIC

LOG MOISTURE

CONTENT

CASING DIAMETER: 50 mm DRILLING METHOD: Solid Flight Auger

CLIENT: Little Property (WA) Pty. Ltd.

COMMENTS:

LOGGED BY: PML

DATUM: GDA94, MGA Zone 50

ELEVATION (GROUND): 40.73 mAHD ELEVATION (GROUNDWATER): 37.73 mAHD

CONSTRUCTIONWELL EASTING: 402235.22

NORTHING: 6481723.21

DEPTH (mAHD)

40

39

38

37

36 DEPTH (mBGL)

0

1

2

3

4

5

LITHOLOGICAL DESCRIPTION

PROJECT LOCATION: Henley Brook

ELEVATION (TOP OF CASING): 41.350 mAHD

Dry Moist

Moist

Moist/wet

Steel casing PVC standpipe Concrete seal Blank casing Bentonite seal

Gravel pack

Slotted screen

Sand Backfill 0.00m: TOPSOIL WITH ORGANIC MATTER, grey, medium grained.

0.10m: SAND, brown, fine to medium grained.

1.80m: SAND, light-brown, fine to medium grained.

3.00m: SAND, cream, fine to medium grained.

Total Bore Depth: 7.50 mBGL DATE STARTED: 29/09/2015

DATE COMPLETED: 29/09/2015 DRILLING CONTRACTOR: Strataprobe

DEPTH WATERTO GRAPHIC

LOG MOISTURE

CONTENT

CASING DIAMETER: 50 mm DRILLING METHOD: Solid Flight Auger

CLIENT: Little Property (WA) Pty. Ltd.

COMMENTS:

LOGGED BY: PML

DATUM: GDA94, MGA Zone 50

ELEVATION (GROUND): 38.85 mAHD ELEVATION (GROUNDWATER): 34.75 mAHD

CONSTRUCTIONWELL EASTING: 402753.16

NORTHING: 6480852.85

DEPTH (mAHD)

38

37

36

35

34

33

32 DEPTH (mBGL)

0

1

2

3

4

5

6

7

LITHOLOGICAL DESCRIPTION

PROJECT LOCATION: Henley Brook

ELEVATION (TOP OF CASING): 39.530 mAHD

Dry Moist

Moist

Steel casing PVC standpipe Concrete seal Blank casing Bentonite seal

Gravel pack

Slotted screen

Sand Backfill 0.00m: TOPSOIL WITH ORGANIC MATTER, grey, fine to medium

grained.

0.10m: SAND, grey, fine to medium grained.

3.50m: SAND, light-grey, fine to medium grained.

Total Bore Depth: 5.00 mBGL DATE STARTED: 29/09/2015

DATE COMPLETED: 29/09/2015 DRILLING CONTRACTOR: Strataprobe

DEPTH WATERTO GRAPHIC

LOG MOISTURE

CONTENT

CASING DIAMETER: 50 mm DRILLING METHOD: Solid Flight Auger

CLIENT: Little Property (WA) Pty. Ltd.

COMMENTS:

LOGGED BY: PML

DATUM: GDA94, MGA Zone 50

ELEVATION (GROUND): 35.94 mAHD ELEVATION (GROUNDWATER): 33.74 mAHD

CONSTRUCTIONWELL EASTING: 402503.16

NORTHING: 6480231.02

DEPTH (mAHD)

35

34

33

32

31 DEPTH (mBGL)

0

1

2

3

4

5

LITHOLOGICAL DESCRIPTION

PROJECT LOCATION: Henley Brook

ELEVATION (TOP OF CASING): 36.550 mAHD

Moist

Moist

Wet

Steel casing PVC standpipe Concrete seal Blank casing Bentonite seal

Gravel pack Slotted screen

Sand Backfill 0.00m: SAND, dark-grey, medium grained.

0.60m: SAND, dark-grey, medium grained.

1.80m: SAND, dark-grey, medium grained.

Total Bore Depth: 4.00 mBGL DATE STARTED: 29/09/2015

DATE COMPLETED: 29/09/2015 DRILLING CONTRACTOR: Strataprobe

DEPTH WATERTO GRAPHIC

LOG MOISTURE

CONTENT

CASING DIAMETER: 50 mm DRILLING METHOD: Solid Flight Auger

CLIENT: Little Property (WA) Pty. Ltd.

COMMENTS:

LOGGED BY: PML

DATUM: GDA94, MGA Zone 50

ELEVATION (GROUND): 30.97 mAHD ELEVATION (GROUNDWATER): 29.17 mAHD

CONSTRUCTIONWELL EASTING: 403331.49

NORTHING: 6480259.35

DEPTH (mAHD)

30

29

28

27 DEPTH (mBGL)

0

1

2

3

4

LITHOLOGICAL DESCRIPTION

PROJECT LOCATION: Henley Brook

ELEVATION (TOP OF CASING): 31.510 mAHD

Dry

Dry

Moist/wet

Wet

Moist

Steel casing PVC standpipe Concrete seal Blank casing Bentonite seal

Gravel pack Slotted screen

Sand Backfill 0.00m: SAND, brown, fine grained.

0.50m: SAND, light-brown, fine to medium grained.

2.00m: SAND, brown, fine to medium grained.

3.00m: SAND, brown, fine to medium grained.

5.00m: SAND, light-brown, fine to medium grained.

Total Bore Depth: 6.00 mBGL DATE STARTED: 29/09/2015

DATE COMPLETED: 29/09/2015 DRILLING CONTRACTOR: Strataprobe

DEPTH WATERTO GRAPHIC

LOG MOISTURE

CONTENT

CASING DIAMETER: 50 mm DRILLING METHOD: Solid Flight Auger

CLIENT: Little Property (WA) Pty. Ltd.

COMMENTS:

LOGGED BY: PML

DATUM: GDA94, MGA Zone 50

ELEVATION (GROUND): 36.22 mAHD ELEVATION (GROUNDWATER): 33.72 mAHD

CONSTRUCTIONWELL EASTING: 401903.74

NORTHING: 6480013.68

DEPTH (mAHD)

36

35

34

33

32

31 DEPTH (mBGL)

0

1

2

3

4

5

6

LITHOLOGICAL DESCRIPTION

PROJECT LOCATION: Henley Brook

ELEVATION (TOP OF CASING): 36.820 mAHD

Dry

Dry Wet

Wet

Steel casing PVC standpipe Concrete seal Blank casing Bentonite seal

Gravel pack Slotted screen

Sand Backfill 0.00m: SANDY-CLAY, red, fine grained.

0.80m: SAND, cream/grey, fine to medium grained.

1.20m: SAND, yellow/brown, fine to medium grained.

4.00m: SAND, grey, medium grained.

Total Bore Depth: 6.00 mBGL DATE STARTED: 29/09/2015

DATE COMPLETED: 29/09/2015 DRILLING CONTRACTOR: Strataprobe

DEPTH WATERTO GRAPHIC

LOG MOISTURE

CONTENT

CASING DIAMETER: 50 mm DRILLING METHOD: Solid Flight Auger

CLIENT: Little Property (WA) Pty. Ltd.

COMMENTS:

LOGGED BY: PML

DATUM: GDA94, MGA Zone 50

ELEVATION (GROUND): 33.72 mAHD ELEVATION (GROUNDWATER): 32.42 mAHD

CONSTRUCTIONWELL EASTING: 402412.71

NORTHING: 6479799.06

DEPTH (mAHD)

33

32

31

30

29

28 DEPTH (mBGL)

0

1

2

3

4

5

6

LITHOLOGICAL DESCRIPTION

PROJECT LOCATION: Henley Brook

ELEVATION (TOP OF CASING): 34.420 mAHD

Dry Moist Moist

Moist

Wet

Steel casing PVC standpipe Concrete seal Blank casing Bentonite seal

Gravel pack

Slotted screen

Sand Backfill 0.00m: TOPSOIL WITH ORGANIC MATTER, grey, fine to medium

grained.

0.10m: SAND, light-grey/cream, medium grained.

0.60m: SAND, brown, fine to medium grained.

1.20m: SAND, dark-grey/black, fine to medium grained.

2.00m: SAND, grey, fine to medium grained.

Total Bore Depth: 5.00 mBGL DATE STARTED: 29/09/2015

DATE COMPLETED: 29/09/2015 DRILLING CONTRACTOR: Strataprobe

DEPTH WATERTO GRAPHIC

LOG MOISTURE

CONTENT

CASING DIAMETER: 50 mm DRILLING METHOD: Solid Flight Auger

CLIENT: Little Property (WA) Pty. Ltd.

COMMENTS:

LOGGED BY: PML

DATUM: GDA94, MGA Zone 50

ELEVATION (GROUND): 32.02 mAHD ELEVATION (GROUNDWATER): 29.82 mAHD

CONSTRUCTIONWELL EASTING: 403154.66

NORTHING: 6479855.07

DEPTH (mAHD)

31

30

29

28 DEPTH (mBGL)

0

1

2

3

4

5

LITHOLOGICAL DESCRIPTION

PROJECT LOCATION: Henley Brook

ELEVATION (TOP OF CASING): 32.730 mAHD

Appendix D

Geotechnical Investigations

Pre-development Geotechnical Investigation Report

JDS181616 September 2018

Proposed Residential Development

Park Street

Henley Brook WA

This page has been intentionally left blank.

Proposed Residential Development, Park Street, Henley Brook WA Pre-development Geotechnical Investigation Report

Prepared for Our ref: JDS181616-R01-Rev0

Mirvac WA Pty Ltd Level 39

108 St Georges Terrace Perth WA 6000

Prepared by

JDSi Ground Engineering Pty Ltd Workzone

Level 6, 1 Nash Street Perth WA 6000 17 September 2018 Document authorisation

For and on behalf of JDSi Ground Engineering Pty Ltd

James Campbell

Senior Engineering Geologist Quality information

Revision history

Revision Description Date Author Reviewer Signatory

Rev0 Issued to Client 17/9/2018 JC RM JC

Distribution Report

Status No. of

copies Format Distributed to Date

Rev0 1 PDF Mirvac WA Pty Ltd 17/9/2018

Rev0 1 PDF JDSi Consulting Engineers Pty Ltd 17/9/2018

Rev0 1 PDF JDSi Ground Engineering Report Library 17/9/2018

Dalam dokumen Local Water Management Strategy (Halaman 72-200)

Dokumen terkait