Water Sensitive Urban Design Certification

Dalam dokumen ASSESSMENT UNIT (Halaman 125-153)

CONDTION 4 IS AMENDED AS FOLLOWS

99. Water Sensitive Urban Design Certification

An Occupation Certificate must not be issued prior to the completion of the WSUD elements conditioned earlier in this consent. The following documentation must be submitted in order to obtain an Occupation Certificate:

WAE drawings and any required engineering certifications;

Records of inspections;

DEVELOPMENT ASSESSMENT UNIT MEETING 23 JULY, 2019

PAGE 126 An approved operations and maintenance plan; and

A certificate of structural adequacy from a suitably qualified structural engineer verifying that any structural element of the WSUD system are structurally adequate and capable of withstanding all loads likely to be imposed on them during their lifetime.

Where Council is not the PCA a copy of the above documentation must be submitted to Council.

100. Subdivision Works – Submission Requirements

Once the subdivision works are complete the following documentation (where relevant/

required) must be prepared in accordance with Council’s Design Guidelines Subdivisions/

Developments and submitted to Council’s Construction Engineer for written approval:

Works as Executed Plans

Stormwater Drainage CCTV Recording Public Asset Creation Summary

Concrete Core Test Results Structural Certification

The works as executed plans must be prepared by a suitably qualified engineer or registered surveyor.

All piped stormwater drainage systems and ancillary structures which will become public assets must be inspected by CCTV. A copy of the actual recording must be submitted electronically for checking.

A template public asset creation summary is available on Council’s website and must be used.

101. Performance/ Maintenance Security Bond

A performance/ maintenance bond of 5% of the total cost of the subdivision works is required to be submitted to Council. The bond will be held for a minimum defect liability period of six months from the certified date of completion of the subdivision works. The minimum bond amount is $5,000.00. The bond is refundable upon written application to Council and is subject to a final inspection.

102. Confirmation of Pipe Locations

A letter from a registered surveyor must be provided with the works as executed plans certifying that all pipes and drainage structures are located within the proposed drainage easements.

THE USE OF THE SITE

103. Maintenance of Landscaping Works

The landscaping works, associated plantings and construction of retaining walls are to be effectively maintained at all times and throughout the life of the development.

104. Lighting

Any lighting on the site shall be designed so as not to cause a nuisance to other residences in the area or to motorists on nearby roads and to ensure no adverse impact on the amenity of the surrounding area by light overspill. All lighting shall comply with the Australian Standard AS 4282:1997 Control of Obtrusive Effects of Outdoor Lighting.

105. Waste and Recycling Management

To ensure the adequate storage and collection of waste from the occupation of the townhouses, all garbage and recyclable materials emanating from the townhouses must be

DEVELOPMENT ASSESSMENT UNIT MEETING 23 JULY, 2019

PAGE 127 stored in the designated bin cupboards, which must include provision for the storage of all waste generated on the premises between collections. Bin cupboards must be kept clean and tidy, bins must be washed regularly, and contaminants must be removed from bins prior to any collection.

106. Offensive Noise

The use of the premises, building services, equipment, machinery and ancillary fittings shall not give rise to “offensive noise” as defined under the provisions of the Protection of the Environment Operation Act 1997.

107. Bin Presentation (Townhouses 44-46 & 22-25)

Townhouses 44 to 46 and 22 to 25 must present bins at the locations specified in accordance to the ‘Ground Floor Plan – JOB No. 140641 DA: 201 – Issue: H’ for collection purposes. Bin presentation is not permitted directly in front of these townhouses.

ATTACHMENTS

1. Locality Plan 2. Aerial Photograph 3. Site Plan

4. Front Elevation (Facing Stone Mason Drive) 5. Typical Internal Elevations

6. Rear Elevation (Facing Castle Pines Estate) 7. Building Height Plan

8. Perspectives 9. Landscape Plan 10. Fence Details 11. Cut and Fill Plan 12. Shadow Diagrams

13. Roads and Maritime Comments 14. Clause 4.6 Written Request

DEVELOPMENT ASSESSMENT UNIT MEETING 23 JULY, 2019

PAGE 128 ATTACHMENT 1 – LOCALITY PLAN

DEVELOPMENT ASSESSMENT UNIT MEETING 23 JULY, 2019

PAGE 129 ATTACHMENT 2 – AERIAL PHOTOGRAPH

DEVELOPMENT ASSESSMENT UNIT MEETING 23 JULY, 2019

PAGE 130 ATTACHMENT 3 – SITE PLAN

DEVELOPMENT ASSESSMENT UNIT MEETING 23 JULY, 2019

PAGE 131 ATTACHMENT 4 – FRONT ELEVATION (FACING STONE MASON DRIVE)

DEVELOPMENT ASSESSMENT UNIT MEETING 23 JULY, 2019

PAGE 132 ATTACHMENT 5 – TYPICAL INTERNAL ELEVATIONS

DEVELOPMENT ASSESSMENT UNIT MEETING 23 JULY, 2019

PAGE 133 ATTACHMENT 6 – REAR ELEVATION (FACING CASTLE PINES ESTATE)

DEVELOPMENT ASSESSMENT UNIT MEETING 23 JULY, 2019

PAGE 134 ATTACHMENT 7 – BUILDING HEIGHT PLANE

DEVELOPMENT ASSESSMENT UNIT MEETING 23 JULY, 2019

PAGE 135 ATTACHMENT 8 – PERSPECTIVES

DEVELOPMENT ASSESSMENT UNIT MEETING 23 JULY, 2019

PAGE 136 ATTACHMENT 9 – LANDSCAPE PLAN

DEVELOPMENT ASSESSMENT UNIT MEETING 23 JULY, 2019

PAGE 137 ATTACHMENT 10 – FENCE DETAILS

DEVELOPMENT ASSESSMENT UNIT MEETING 23 JULY, 2019

PAGE 138 ATTACHMENT 11 – CUT AND FILL PLAN

DEVELOPMENT ASSESSMENT UNIT MEETING 23 JULY, 2019

PAGE 139 ATTACHMENT 12 – SHADOW DIAGRAMS

DEVELOPMENT ASSESSMENT UNIT MEETING 23 JULY, 2019

PAGE 140

DEVELOPMENT ASSESSMENT UNIT MEETING 23 JULY, 2019

PAGE 141 ATTACHMENT 13 – ROADS AND MARITIME COMMENTS

DEVELOPMENT ASSESSMENT UNIT MEETING 23 JULY, 2019

PAGE 142

DEVELOPMENT ASSESSMENT UNIT MEETING 23 JULY, 2019

PAGE 143 ATTACHMENT 14 – CLAUSE 4.6 WRITTEN REQUEST

DEVELOPMENT ASSESSMENT UNIT MEETING 23 JULY, 2019

PAGE 144

DEVELOPMENT ASSESSMENT UNIT MEETING 23 JULY, 2019

PAGE 145

DEVELOPMENT ASSESSMENT UNIT MEETING 23 JULY, 2019

PAGE 146

DEVELOPMENT ASSESSMENT UNIT MEETING 23 JULY, 2019

PAGE 147

DEVELOPMENT ASSESSMENT UNIT MEETING 23 JULY, 2019

PAGE 148

DEVELOPMENT ASSESSMENT UNIT MEETING 23 JULY, 2019

PAGE 149

DEVELOPMENT ASSESSMENT UNIT MEETING 23 JULY, 2019

PAGE 150

DEVELOPMENT ASSESSMENT UNIT MEETING 23 JULY, 2019

PAGE 151 ITEM-5 DA 2324/2018/LD/A - SECTION 4.55 (1A) MODIFICATION

TO THE APPROVED DEMOLITION OF AN EXISTING DWELLING, CONSTRUCTION OF A TWO STOREY DWELLING, RETAINING WALLS AND CONVERSION OF THE EXISTING SWIMMING POOL TO A WATER TANK - NO.78 BRUCEDALE DR. BAULKHAM HILLS

THEME: Valuing our Surroundings

OUTCOME: 5 Well planned and liveable neighbourhoods that meets growth targets and maintains amenity.

STRATEGY:

5.1 The Shire’s natural and built environment is well managed through strategic land use and urban planning that reflects our values and aspirations.

MEETING DATE: 23 JULY 2019

DEVELOPMENT ASSESSMENT UNIT

AUTHOR: SENIOR HEALTH AND BUILDING SURVEYOR TONY BROWN

RESPONSIBLE OFFICER: PRINCIPAL EXECUTIVE PLANNER KRISTINE MCKENZIE

Applicant V and A Balakrishnan

Owner As Above

Exhibition / Notification 14 days Number Advised Seven

Number of Submissions Three Submissions from one property owner.

Zoning R2 Low Density Residential

Site Area 695m²

List of all relevant s4.15(1)(a) matters

Section 4.15 (EP&A Act) – Satisfactory.

Section 4.55 (1A) (EP&A Act) – Satisfactory.

LEP 2012 – Satisfactory.

DCP Part B Section 2 Residential – Satisfactory.

Political Donation None Disclosed.

Reason for Referral to DAU Submissions received and modification to Development Consent.

Recommendation Approval subject to conditions.

DEVELOPMENT ASSESSMENT UNIT MEETING 23 JULY, 2019

PAGE 152 EXECUTIVE SUMMARY

Development Application 2324/2018/LD was approved on 14 September 2018 under Delegated Authority for the demolition of an existing dwelling, construction of a two storey dwelling, retaining walls and the conversion of the existing swimming pool to a water tank.

The Section 4.55 (1A) Modification Application seeks to demolish the swimming pool and to amend the stormwater disposal design, to alter or delete a number of windows and amend the internal floor plan of the proposed dwelling.

The proposed modification has been assessed against the requirements of DCP Part B Section 2 - Residential and is satisfactory.

The Modification Application was notified to adjoining properties and three submissions were received from the same property owner. The issues raised in the submissions primarily relate to matters addressed in the original Development Application for the dwelling. These matters include overshadowing, dwelling height, sunlight and ventilation, potential overlooking, and stormwater design. The proposed modifications to drainage, window placement and floor layout are considered to be satisfactory in terms of design and amenity to adjoining properties. The proposal will not unreasonably impact on existing or future adjoining dwellings in respect to amenity or create unreasonable privacy impacts.

The application is recommended for approval subject to conditions.

BACKGROUND

Development Application 2324/2018/LD was approved on 14 September 2018 under Delegated Authority for the demolition of an existing dwelling, construction of a two storey dwelling, retaining walls and the conversion of the existing swimming pool to a water tank.

The subject Modification Application was lodged on 6 February 2019. The proposal was notified for 14 days and one submission was received. Two further submissions were subsequently lodged from the same property owner.

PROPOSAL

The Section 4.55(1A) Modification Application seeks approval to amend the stormwater disposal system. The original stormwater disposal design was to convert the existing pool into a water tank and then direct the overflow via a new stormwater drainage easement through a neighbouring downstream property to the rear. The applicant could not reach an agreement with the neighbour regarding the establishment of the easement due to the impact on a large tree’s root system near the area to be allocated as the drainage easement.

The applicant now proposes to delete the water tank and demolish the pool and to delete the use of a drainage easement. The stormwater will drain partly to Brucedale Drive via a charged stormwater drainage line and partly to an absorption trench to be constructed in the rear yard. The applicant also seeks the reduction in size and deletion of some of the dwelling windows and minor changes to the floor layout.

DEVELOPMENT ASSESSMENT UNIT MEETING 23 JULY, 2019

PAGE 153 ISSUES FOR CONSIDERATION

1. Section 4.55(1A) of the Environmental Planning and Assessment Act, 1979