• Tidak ada hasil yang ditemukan

reports

N/A
N/A
Protected

Academic year: 2024

Membagikan "reports"

Copied!
3
0
0

Teks penuh

(1)

&\ %,,xy.* January, August & Final Reports

Part

I

- Summa17 Details

"

REPORTS

Please use your TAB key to complete part 1 G. 2.

CRDC Project Number: DAN148C January Report:

C]

Due 29-Jan-01

August Report:

C]

Due 03-Aug-01

Final Report: Due within 3 months of project completion

Project Title: Cotton Disease Washdown Facility

Project Commencement Date: 1/7/2000 Project Completion Date: 30/6/2001 Research Program: Diseases Weeds

Part

2 -

Contact Details

Administrator: Mr Graham Denney Organisation: NSW Agriculture

Postal Address: Locked Bag 21, Orange NSW2800

Ph: 02 6391 3327 Fx: 02 6391 3327 E-mail: [email protected]

Principal Researcheer.

Dr

David Nehl Organisation: NSW Agriculture

Postal Address: ACRI Locked Bag 1000 Narrabri 2390

Ph: 026799 1500 Fx: 02 6799 1503 E-mail: [email protected]

Supervisor: Bruce Reddan

Organisation: NSW Agriculture

Postal Address: ACRI Locked Bag 1000 Narrabri 2390

Ph: 02 6799 1500 Fx: 02 6799 1503 E-mail: [email protected]

Researcher 2 (Name & position of additional researcher or supervisor).

Organisation:

Postal Address:

Ph : Fx: E-mail:

.

Signature of Research Provider Representative:

(2)

Part 3 -Final Report Fomzat

1. Outline the background to the project.

Ongoing research at ACRI into cotton dideases confirmed the need for best practice to be exercised to avoid disease transfer from one location to another.The need for this was confirmed by pathology staff at ACRI who tested vehicles visiting ACRI and found Black root Rot

,

Veticilium and Fusarium pathogens present . This clearly presented a risk to the research trials at ACRI especially if Fusarium Wilt was to be imported onto the farm. It was also recognised that ACRI is a hub of the Cotton Industry with many grower visitors and that many off station sites are visited by ACRI staff. The pathology staff advised that in order to prevent disease transfer it would be necessary to improve the washdown facilities at ACRI and adopt a come clean go clean policy.Action wasthen taken to set about the construction of a new waslxdown facility. A funding application was submitted to CRDC and subsequently approved.

2. List the project objectives and the extent to which these have been achieved.

The objective of the project was to deveolp a new washdown facil~ty that would have a dual function. Part of the function was to act as a demonstrat~on to industry personel of best management practices in disease hygene but the principle part was to enable pathology staff to evaluate the effectiveness of the facility for disease control and also evaluate the viabiiity of anti

-

fungal chemicats as they come on the market and t o advise industry of the outcomes.

Both these objectives have been achieved and will continue to be refined.

3. How has your research addressed the Corporations three outputs:

Sustainability, profitability and international competitiveness, andlor people and community?

The project has achieved it's goals and will significantly contribute to sustainability of production systems for the Cotton Industry.

(3)

Part

4

-Final Revort Plain English Summaru

Cotton Disease Washdown Facility

Control of cotton diseases is a major research effort at ACRI. Transport and transfer of cotton diseases by vehicles or machinery is a threat to cotton production in most cotton producing valleys. It is also a threat to research trials at ACRI. It was recognised that an improvement in the method by which vehicles could be satisfactorily cleaned was needed at ACRI. As ACRI is a significant hub of the Cotton Industry with many off-station trials being conducted it is essential that all vehicles and machinery are free of disease pathogens.

Pathology xg~earch staff determined W i t was necessary to construct a new washdown facility which would aim to achieve best management practice in disease control transfer and also have the role of including the evaluation of anti - fungal chemicals used to control pathogens. The facility would also double as a best management practice demonstration facility to industry.

A funding application was made to the CRDC for part funding of the washdown facility and this was subsequently approved. Construction was completed and all staff required to comply with a come clean go clean policy to protect ACRI trials and off station trial sites. Many growers have come to examine the facility which is a drive on - drive of concrete hard stand area. Cleaning is achieved whith high pressure spray equipment that incorporates anti -fungal chemicals. All water and washed down material is collected in a sealed sump then pumped to an evaporation basin where it is treated by a bleach dosing device. The entire washdown process is a closed water system with nil return to the adjacent farm areas.

The project has achieved its objectives and the facility continues to be a an evaluation tool for pathology staff to evaluated new anti-fungal chemicals as they are offered to industry.

Referensi

Dokumen terkait

It is in the third phase that self-fashioning assumes its most dynamic form as it becomes an ongoing process of identity formation for the immigrants who now understand that to

groups of negotiation in the WTO system, but also exercised the WTO DSM to solve a dispute with another WTO member country. Indonesia has involved in the WTO DSM as complainant for

Although daytime beach parties are the most popular, the beach is an excellent location for evening parties.. It is advisable to check with local authorities about regulations, to

need of PAI teachers... In implementing proportional teacher distribution, the process is not a simple transfer of class or subject teachers from one school to another, it

We need electronic health records: patient data in a more-or- less standard form that can be shared efficiently, data that can be moved from one location to another at the speed of

 Dates to be confirmed: Regional Workshops, for the RPS Project Statistical Capacity Building for Harmonization of ASEAN International Trade in Goods and Services Indicators,

As case studies, the ongoing Moragahakanda-Kaluganga multi-purpose project in Sri Lanka and attempts to develop water resources for hydropower on the upper Waitaki River at five

Tap on Hospital Location Exception Path 1.1 Tap on the Offers 2.1 Tap on Hospital Location Notes User need to login first to use this feature Table 3.3.4: Use case modeling table