This report along with supporting documents supports the rezoning of Phase 1 of the Vineyard Precinct (the area). Rezoning the area responds to the demands of Sydney's future population growth by delivering an additional 2,300 homes within the North West Growth Area. The rezoning of the area facilitates the Government's housing objectives identified in the Draft Greater Sydney Regional Plan and the draft Western City District Plan and will contribute to the supply of land in Sydney that is development-ready for housing.

The north west growing area is benefiting from major infrastructure investment with the construction of Sydney Metro Northwest, the upgrade of Schofields Road from two lanes to four lanes and the planned widening and upgrade of Bandon Road linking Windsor and Richmond roads. The area can now be redeveloped as services are in place: sewerage and water are available for the entire level 1 area, and electricity is available immediately for up to 500 plots, with full capacity available within 5 years. A discussion of the main issues can be found in Section 4 and a summary of all submissions and the Department of Planning and Environment's (Department) response can be found in Appendix B.

The relocation of pocket parks in the north-east and south of the area to distribute them equitably and minimize the impact on individual land ownership. Electricity capacity currently exists for 500 lots from existing 11kV feeders to the area originating from the existing Riverstone zone substation.

O VERVIEW

S UMMARY OF THE P RECINCT P LAN

S TAGED R EZONING OF V INEYARD P RECINCT

S TRATEGIC AND S TATUTORY F RAMEWORK

The pocket park to connect to the north side of the site was moved to be split between two properties instead of one.

Figure 1: Final Indicative Layout Plan – major amendments following exhibition
Figure 1: Final Indicative Layout Plan – major amendments following exhibition

E XHIBITION AND S UBMISSIONS P ERIOD

E XHIBITED M ATERIALS

E XHIBITION V ENUES

P UBLIC N OTICE

N OTIFICATION OF L AND O WNERS

I NFORMATION S ESSIONS

P OST - EXHIBITION T ARGETED L ANDOWNER C ONSULTATION

N UMBER OF S UBMISSIONS

I SSUES R AISED IN S UBMISSIONS

This section discusses the issues raised in submissions and those raised in ongoing discussions with government agencies and key stakeholders. Post-exhibition changes were made to the ILP as a result of the Department's review of submissions. The changes made to the ILP since exhibition are summarized in Section 5 and discussed below.

The key issues raised in submissions are considered in detail in this section, while Appendix B provides responses to individual submissions.

Z ONING AND D ENSITIES

Z ONING FOR O PEN S PACE

Placement of Open Space

Pedestrian and cyclist connections within the area are planned to connect with the passive open space located along the coastal corridor. The playing fields will be located on partially enclosed land near the coastal corridor that is subject to flooding and not suitable for residential development.

Changes to Open Space

The open space in the middle of the site has been increased to accommodate the retention of an additional 1.27 ha of ENV as shown in Figure 2. The playing fields have been moved to the north to accommodate an additional 2.45 ha of ENV. Several design options were considered and the preferred option was selected to achieve a balance between preserving the ENV, minimizing impacts on developed urban land and ensuring the playing fields are located on relatively flat land adjacent to other areas of open space.

The pocket park to the west of Harkness Road has been moved slightly to the northwest to respond to the realignment of a collector road (see Section 4.6.3 and Figure 5). Following the detailed design of the future intersection of Otago Street and Windsor Road (see Section 4.6.1), the location of the open space connecting areas north and south of the Killarney chain of dams has also been reviewed. The open space has been moved to the west to maintain its alignment with the proposed local road and is therefore located partly on 621 and 627 Windsor Road rather than entirely on 627 Windsor Road as shown.

Figure 2: 4 O’Dell Street - Exhibited and proposed layout
Figure 2: 4 O’Dell Street - Exhibited and proposed layout

P RIVATE L AND CONTAINING EXISTING NATIVE VEGETATION ZONED E2 E NVIRONMENTAL

E SSENTIAL I NFRASTRUCTURE

Water, Sewer and Electricity

There is electrical capacity for 500 lots from the existing 11 kV feeders in the area which originate from the existing substation of the Riverstone area. Further capacity for up to 1,000 lots will be available in about two years when Endeavor Energy carries out addition works to the 11kV network upstream. Power capacity for the entire Phase 1 area will be available once the Box Hill and Riverstone East area substations in the neighboring discharge areas are delivered.

Endeavor Energy will monitor the rate of residential development on a regular basis to ensure that capacity upgrades will be available in a timely manner for the area. Developers will have to make arrangements through accredited service providers for their 11kV network and extension of 11kV network to their subdivision. Endeavor Energy has changed funding schemes so that 11kV grid networks and extensions to new subdivisions will be reimbursed to developers based on standard rates.

This addresses the "first mover" disadvantage of providing electrical infrastructure in fragmented ownership areas such as area area.

Early Activation Sub-Precinct

Drainage Infrastructure

F LOODING

General Discussion – determination of 1:100 year flood event line

Probable Maximum Flood Line and Flood Evacuation Study

E4 Environmental Living zoning above and below 1:100 flood line

U LTIMATE R OAD N ETWORK

Proposed design of Windsor Road/Otago Street Intersection

Widening of Collector Road Routes to 20.8m and intersection land take

Transport for NSW requested that a 13m wide carriageway be provided to enable bus movements, therefore widening the total road reservation to 20.8m. An extra 0.8m of road reserve is required to accommodate the land use types within the reserve to achieve the wide road level of 13m.

Figure 10: Exhibited collector road section
Figure 10: Exhibited collector road section

Re-location of a Proposed Collector Road

L AND A CQUISITION AND THE S ECTION 94 C ONTRIBUTIONS P LAN

I NDICATIVE L AYOUT P LAN AND SEPP M AP A MENDMENTS

The Department worked with the RMS post-exhibition to design this future intersection to ensure that the required amount of land would be shown on the Land Reservation Acquisition Map. To ensure bus-capable collector roads, the existing road reserve forming collector routes will be widened from 20m to 20.8m. The proposed location of the raingarden at 3 Putland Place would have required the demolition of an existing dwelling.

The Raingarden has been relocated to a site nearby (9 O'Dell Street) that will not require the demolition of any existing residences. The area at Lot 3 DP 248509 (5 O’Dell Street) above the 1:100 flood line has been changed from R2 Low Density Residential to E4 Environmental Residential. Lot Size To provide subdivision options for the area of ​​the lot that is isolated by a local road.

Lot size To align the minimum lot size with land located above the 1:100 flood line. Plot size. Isolated parts of the battleaxes would not be able to meet the minimum lot size control if they kept 10,000m2.

H AWKESBURY C ITY C OUNCIL G ROWTH C ENTRE P RECINCT DCP A MENDMENTS

D RAFT G REATER S YDNEY R EGION G ROWTH P LAN

D RAFT W ESTERN C ITY D ISTRICT P LAN

N ORTH W EST L AND U SE AND I NFRASTRUCTURE I MPLEMENTATION P LAN

S TATE E NVIRONMENTAL P LANNING P OLICY (S YDNEY R EGION G ROWTH C ENTRES ) 2006

G ROWTH C ENTRES D EVELOPMENT C ODE

S ECTION 117(2) M INISTERIAL D IRECTIONS FOR P LAN M AKING

B IODIVERSITY C ERTIFICATION FOR THE S YDNEY G ROWTH C ENTRES

G ROWTH C ENTRES S TRATEGIC A SSESSMENT P ROGRAM

Pokopališča in krematoriji NSW Planning Institute of Australia Svet za socialne storitve NSW Property Council of Australia Department of Family & Community Services Inštitut za nepremičnine NSW. Department of Premier and Cabinet Royal Australian Institute of Architects Department of the Environment Urban Development Institute of Australia NSW Department of Primary Industries – Water Urban Taskforce of Australia. NSW Department of Education Australian Sustainable Built Environment Council NSW Department of Finance, Services and.

NSW Department of Industry National Parks Association of NSW NSW Department of Justice Nature Conservation Council of NSW NSW Department of Primary Industries Total Environment Centre. NSW Land and Water Metropolitan Local Aboriginal Land Council NSW Department of Industry Tomcomwall Cultural Heritage Consultants. Updated to reflect revised density bands and add additional side setback and parking space controls.

Updated to reflect revised density bands and include additional side setbacks and modify garage and parking controls. Updated to include additional side setback control and modify garage and parking controls 5.1.2 Street View and Architectural Design Light color roof control added on request. Note deleted as it is not necessary 5.3.3 Neighboring shops Control 1 and 2 updated to apply to all.

Changes to definitions The leaning definition of housing deleted because it is not defined in the SEPP. Definitions of flood planning level, habitable rooms and non-habitable rooms are deleted as they are included in the main part of the DCP.

Table 1-2 Guide to DCP controls  References to various DCP parts updated  Figure 1-2 Vineyard Precinct in the context
Table 1-2 Guide to DCP controls References to various DCP parts updated Figure 1-2 Vineyard Precinct in the context

Gambar

Table 1: Planning outcomes for Stage 1
Figure 1: Final Indicative Layout Plan – major amendments following exhibition
Table 2: Summary of submissions  Submission author  Number of
Figure 3: 284B, 284, 284D, 316 & 324 Commercial Road-Exhibited and proposed layout
+7

Referensi

Dokumen terkait

Overexpression of SPS genes from corn in tomato plants and transgenic Ara- bidopsis can increase photosynthesis levels, as well as the level of synthesis and storage sucrose and