• Tidak ada hasil yang ditemukan

Quiz-1 Solution

N/A
N/A
Protected

Academic year: 2023

Membagikan "Quiz-1 Solution"

Copied!
1
0
0

Teks penuh

(1)

Quiz-1 Solution

Q. Simulation Started with.

Ans: Set of Assumption

Q. M/M/1 Queuing System means.

Ans: A system with single Queue single Server

Q. Model that has one or more random variables as inputs & output, is called.

Ans: Stochastic Simulation Model

Q. Write down 3 of the areas of Simulation?

Ans: Human Resource System, Distributional Application, Military Application, Construction Engineering

Q. Why does we use Simulation? (try to answer in one sentence) Ans: To test a project or system is implementable in the real world or not

Q. Assume at the Trade Fair, fair lovers arrive at random from 2 to 6 minutes apart. There are 2 ticket counters to sale tickets. The service times of two counters vary from 2 to 5 and 4 to 7 minutes respectively, with the following probabilities shown in below tables. A viewer only goes to the counter-2, if and only if counter-1 is busy.

Ans:

Referensi

Dokumen terkait

The following equation shows the calculation of the t-value between the two groups Gerald, 2018; Kim, 2015: = − − + − 1 − 2 + 1 =∑ 2 =∑ 3 = 4 = 5 = 6 = 7 where n1shows

NUMBER 1 2 3 4 5 6 7 A-1 A-2 B-1 B-2 X TABLES TITLE Parameters for Computing Cross Sections Corrections to the Cross Section PAGE 64 65 Rho Production Differential Cross Section