STUDI PERENCANAAN OVERLAY DENGANMENGGUNAKAN METODE

ANALISA KOMPONEN,METODE ANALISA KOMPONEN DENGAN

ALATBENKELMEN BEAMDAN METODE AASHTO ’86 PADA RUAS

JALANGRESIK - KRIAN

Oleh: KRISTONO (99520153) & ANDRE PURWONO (99520154)

Civil Engineering

Dibuat: 2006-04-27 , dengan 2 file(s).

Keywords:

Overlay, Analisa Komponen, Alat Benkelmen Beam, AASHTO ‘86

Untuk dapat memberikan pelayanan yang maksimal maka jalan membutuhkan perawatan pada

periode-periode tertentu disamping periode umur rencana jalan itu sendiri. Yang dalam hal ini

kaitannya adalah dengan pelapisan tambahan atau overlay.

Dari data perencanaan diperoleh tebal perkerasan yang antara lain adalah: 5 cm untuk lapisan

penetrasi, 15 cm untuk lapisan onderlag batu putih, 55 cm untuk lapisan sirtu, dan 15 cm untuk

lapisan onderlag batu putih, sedangkan dari data desain pelebaran diperoleh nilai CBR 2,76 %,

DDT 3,6, FR 1,5, IP 3,9

3,5dan ITP 11,5.

Hasil perhitungan perencanaan perkerasan overlay dengan menggunakan tiga metode adalah

sebagai berikut, pada metode analisa komponen diperoleh ketebalan 7,7 cm untuk lapisan AC,

pada metode analisa komponen dengan menggunakan alat benkelmen beam diperoleh hasil

ketebalan 4 cm untuk lapisan AC, dan pada metode AASHTO ’86 didapat 3,6 cm untuk lapisan

AC. Sedangkan pada perencanaan pelebaran dengan umur rencana yang berbeda diperoleh antara

lain, untuk umur rencana 10 tahun diperoleh 4 cm untuk lapisan AC, 8 cm untuk lapisan ATB,

dan 30 cm untuk lapisan CTSB.Sedangkan pada umur rencana 15 tahun didapatkan 5 cm untuk

lapisan AC, 15 cm untuk lapisan ATB, dan 43 cm untuk lapisan CTSB.

Abstract

In order to provide maximum service, the road requires care at certain periods in addition to the design life period of the road itself. Which in this case the relation is with an additional coating or overlay. From the data obtained pavement thickness design which include: 5 cm to the penetration layer, 15 cm for onderlag layer of white stone, 55 cm for a layer of sand, and 15 cm for onderlag layer of white stones, while from the data obtained by widening the design CBR value of 2, 76%, DDT 3.6, FR 1.5, IP 3.9 to 3.5

and 11.5 ITP.

Results overlay pavement design calculations using the three methods are as follows, on the component analysis method obtained the thickness of 7.7 cm for AC layer, the component analysis method by using a beam benkelmen obtained results for the layer thickness of 4 cm air-conditioning, and the AASHTO method '86 gained 3.6 cm for AC layer. While the widening plan with a different design life is obtained, among others, for the design life of 10 years obtained 4 cm for AC layer, 8 cm for a layer of ATB, and 30

Referensi

Dokumen terkait

Belanja Jasa Konsultansi Perencanaan Pembuatan SID Cetak Sawah Lebak (1.500 ha di Kabupaten Tabalong).. Pengalaman Melaksanakan Kualifikasi tenaga

Kepemilikan manajerial berpengaruh terhadap keputusan keuangan, sedangkan kepemilikan institusional tidak berpengaruh terhadap keputusan keuangan pada perusahaan LQ-45

Upaya Perbaikan Kualitas I Mutu Perbaikan dan menjaga kualitas I mutu pelayanan kesehatan di Rumah Sakit Umum Daerah Kabupaten Bintan sangat penting dilakukan karena sesuai dengan

Penilaian disfungsi/gagal organ pada anak menggunakan beberapa sistem penilaian, antara lain, Pediatric Multiple Organ Dysfunction Score (P-MODS), Pediatric Logistic Organ

Pelestarian Nilai-Nilai Kearifan Lokal Upacara Adat “Ngalaksa” Dalam Upaya Membangun Karakter Bangsa. Universitas Pendidikan Indonesia | repository.upi.edu |

17) Apakah pelayan membantu Anda dalam memberikan informasi produk yang tidak

Data RPJMD UI Data Periode UI Kode Rekening Ctrl Sumber Dana Ctrl Sifat Ctrl Urusan Ctrl Login Ctrl SKPD Ctrl User Periode Ctrl ProgramUI Anggaran AnggaranUI KegiatanUI User Ctrl

Kepala program studi memiliki tampilan seperti Gambar 5.2 dengan menu Beranda, Proposal (Pengajuan Judul, Pend. Sidang Proposal, Sidang Proposal, Revisi Proposal),