PRARANCANGAN PABRIK TRINATRIUM FOSFAT DARI DINATRIUM FOSFAT DAN NATRIUM HIDROKSIDA KAPASITAS 35.000 TON/TAHUN (PERANCANGAN REAKTOR (RE-201))

N/A
N/A
Protected

Academic year: 2017

Membagikan "PRARANCANGAN PABRIK TRINATRIUM FOSFAT DARI DINATRIUM FOSFAT DAN NATRIUM HIDROKSIDA KAPASITAS 35.000 TON/TAHUN (PERANCANGAN REAKTOR (RE-201))"

Copied!
24
0
0

Teks penuh

(1)

ABSTRACT

PRELIMINARY PLANT DESIGN OF TRISODIUM

PHOSPHATE FROM DISODIUM PHOSPHATE AND SODIUM

HYDROXIDE CAPACITY 35.000 TON/YEAR

(PRE-DESIGN OF REACTOR (RE-201))

By

M. Amrih R.

Trisodium phosphate is one of chemical industry products which are used as raw material of detergent industry, water softener and boiler compound, acid reducer and emulsifier in food industry.

Trisodium phosphate is made from disodium phosphate is supplied from Xiamen Vastland Chemical Co., China and sodium hydroxide is supllied from PT. Pindo Deli Pulp and Paper Mill, Jawa Barat. Trisodium phosphate’s plant will be located in Jababeka Industrial Area, Cikarang, West Java. A Business entity of this company is a joint-stock company (Perusahaan Terbatas). The company is managed by managing director and assited by production and financial director. The structure of this organization is line and staff.

An economic analysis of preliminary plant design of trisoudium phosphate are:

Fixed Capital Investment (FCI) = Rp 225.389.312.259,- Working Capital Investment (WCI) = Rp 39.774.584.516,- Total Capital Investment (TCI) = Rp 265.163.896.775,-

Break Even Point (BEP) = 39,46%

Pay Out Time before Taxes (POT)b = 3,3046 years Pay Out Time after Taxes (POT)a = 3,8156 years Return on Investment before Taxes (ROI)b = 17,22% Return on Investment after Taxes (ROI)a = 13,78%

Discounted Cash Flow (DCF) = 35,88%

Shut Down Point (SDP) = 25,96%

(2)

ABSTRAK

PRARANCANGAN PABRIK TRINATRIUM FOSFAT DARI

DINATRIUM FOSFAT DAN NATRIUM HIDROKSIDA

KAPASITAS 35.000 TON/TAHUN

(PERANCANGAN REAKTOR (RE-201))

Oleh

M. Amrih R.

Trinatrium Fosfat merupakan salah satu produk industri kimia yang digunakan sebagai bahan baku industri detergen, reagen dalam pengolahan air umpan boiler, serta bahan aditif pada produk makanan yang berfungsi sebagai pengatur keasaman dan mencegah penggumpalan.

Pembuatan Trinatrium Fosfat pada skala besar, dilakukan pada prarancangan pabrik Trinatrium Fosfat dengan kapasitas 35.000 ton/tahun dengan Dinatrium Fosfat diperoleh dari Xiamen Vastland Chemical Co., Cina dan Natrium Hidroksida diperoleh dari PT. Pindo Deli Pulp and Paper Mill, Jawa Barat. Lokasi pabrik direncanakan didirikan di Kawasan Industri Jababeka, Cikarang, Provinsi Jawa Barat. Tenaga kerja yang dibutuhkan sebanyak 125 orang dengan bentuk badan usaha Perseroan Terbatas (PT) yang dipimpin oleh seorang Direktur Utama yang dibantu oleh Direktur Produksi dan Direktur Keuangan dengan struktur organisasi line and staff.

Analisa kelayakan prarancangan pabrik Trinatrium Fosfat sebagai berikut :

Fixed Capital Investment (FCI) = Rp 225.389.312.259,-

Working Capital Investment (WCI) = Rp 39.774.584.516,-

Total Capital Investment (TCI) = Rp 265.163.896.775,-

Break Even Point (BEP) = 39,46%

Pay Out Time before Taxes (POT)b = 3,3046 tahun

Pay Out Time after Taxes (POT)a = 3,8156 tahun

Return on Investment before Taxes (ROI)b = 17,22%

Return on Investment after Taxes (ROI)a = 13,78%

Discounted Cash Flow (DCF) = 35,88%

Shut Down Point (SDP) = 25,96%

(3)
(4)

PRARANCANGAN PABRIK TRINATRIUM FOSFAT

DARI DINATRIUM FOSFAT DAN NATRIUM

HIROKSIDA DENGAN

KAPASITAS 35.000

TON/TAHUN

(Perancangan

Reactor

(RE-203))

(Skripsi)

Oleh

MOHAMMAD AMRIH R.

FAKULTAS TEKNIK

UNIVERSITAS LAMPUNG

(5)
(6)
(7)
(8)

RIWAYAT HIDUP

Penulis dilahirkan di Lhokseumawe pada tanggal 3 Oktober 1987, sebagai putra ketiga dari tiga bersaudara dari pasangan Drs. H. Bigar Abdurrasyid (alm) dan Hj. Nuraihan.

Penulis menyelesaikan pendidikan Sekolah Dasar Negeri Pesanggrahan 03 Pagi Jakarta Selatan pada tahun 2000, Sekolah Lanjutan Tingkat Pertama Negeri 177 Jakarta pada tahun 2003 dan Sekolah Menengah Atas Negeri 47 Jakarta pada tahun 2006.

Pada tahun 2006, penulis terdaftar sebagai mahasiswa Jurusan Teknik Kimia Fakultas Teknik Universitas Lampung melalui Seleksi Penerimaan Mahasiswa Baru (SPMB).

(9)

Moto

Ya Allah, berikanlah aku kepintaran. Aku berjanji

tidak akan menggunakan kepintaran itu untuk

membodohi orang lain.”

“Yakinlah, di jalan

itu, Tuhan akan selalu

bersamamu...” (El Jalaluddin Rumi)

Hai orang-orang yang beriman, jadikanlah sabar dan

shalat sebagai penolongmu, sesungguhnya Allah beserta

(10)

Sebuah Karya kecilku....

Dengan segenap hati kupersembahkan tugas akhir ini kepada:

Allah SWT

Atas kehendak-Mu lah semua yang tidak nyata dapat menjadi

nyata….

Rasulullah Muhammad SAW

Yang telah membawa kita ke jaman yang terang benderang

dan penuh dengan ilmu pengetahuan….

Orang tuaku sebagai tanda baktiku, terima kasih atas

segalanya, doa, kasih sayang, pengorbanan, dan

keikhlasannya.

Ini hanyalah setitik balasan yang tidak bisa dibandingkan

dengan berjuta-juta pengorbanan dan kasih sayang

yang tidak pernah berakhir.

Kakak dan Adik-adik ku dan keluarga besarku atas

segalanya, kasih sayang dan doa.

Guru-guruku sebagai tanda hormatku,

terima kasih atas ilmu yang telah diberikan.

(11)

SANWACANA

Puji syukur penulis panjatkan kepada Allah SWT yang telah memberikan rahmat dan kekuatan sehingga skripsi ini dapat diselesaikan.

Skripsi dengan judul “Prarancangan Pabrik Trinatrium Fosfat dari Dinatrium Fosfat dan Natrium Hidroksida dengan Kapasitas Produksi 35.000 Ton/Tahun” adalah salah satu syarat untuk memperoleh gelar sarjana di Jurusan Teknik Kimia Fakultas Teknik Universitas Lampung.

Penyusunan tugas akhir ini tidak lepas dari bantuan dan dukungan dari beberapa pihak. Oleh karena itu penulis mengucapkan terimakasih kepada :

1. Bapak Prof. Drs. Suharno, M.Sc., Ph.D., selaku Dekan Fakultas Teknik Universitas Lampung.

2. Bapak Ir. Azhar, M.T, selaku ketua Jurusan Teknik Kimia, yang telah memberikan banyak bantuan untuk kelancaran proses belajar di kampus. 3. Ibu Dr. Elida Purba, S.T., M.Sc., selaku dosen pembimbing I, atas

kesabarannya, masukan dan saran selama penyelesaian tugas akhir serta selaku dosen atas semua ilmu yang telah penulis dapatkan.

4. Ibu Simparmin Br Ginting, S.T., M.T., selaku dosen pembimbing II atas kesabarannya, masukan dan saran dalam pengerjaan tugas akhir serta selaku dosen atas semua ilmu yang telah penulis dapatkan.

(12)

6. Ibu Sri Ismiyati D., S.T., M.Sc., selaku pembimbing akademik yang selama ini membimbing dan memberikan arahan.

7. Ibu Panca Nugrahini F, S.T., M.T., Bapak Taharuddin, S.T., M.Sc serta seluruh dosen di Jurusan Teknik Kimia Universitas Lampung yang telah memberikan banyak ilmunya kepada penulis. Terima kasih, bapak dan ibu telah menjadikan Teknik Kimia indah di mata dan di hati saya.

8. Maya Natalia, partner TA yang setia, terimakasih untuk perjuangan dan kerjasamanya.

9. Niko, Sedny, Novi, Gary, Cici, Nova, Mbak Lia, Didik, Timbo, Mey, Meli, Oji, Dora, Ryan, Aci, dan seluruh teman-teman seperjuang “Tekim 06”, terimakasih untuk persaudaraan, persahabatan, serta segala bentuk dukungan dan transfer ilmu pengetahuan baik dalam bidang sains maupun entertainment.

10.Ibu Kantin yang cantik, Mbak Ita yang baik, Agung “Elka”, Nanda, Tika, Ika, Adel, Yulia, Atunk, Sulis, Marga, dan semua kakak tingkat, adek tingkat, dan seluruh Keluarga Besar Civitas Akademika Teknik Kimia Unila.

Semoga kebaikan mereka terhadap penulis dapat terbalas dan semoga skripsi ini berguna bagi yang membutuhkan.

Bandar Lampung, Agustus 2014 Penulis,

(13)

i

DAFTAR ISI

Halaman

ABSTRAK

DAFTAR ISI ... i

DAFTAR TABEL ... iii

DAFTAR GAMBAR ... vii

DAFTAR GRAFIK ... viii

I. PENDAHULUAN A. Latar Belakang Pendirian Pabrik ... 1

B. Kegunaan Produk ... 2

C. Analisa Pasar ... 2

1. Harga Bahan Baku & Produk ... 2

2. Kebutuhan Pasar ... 3

D. Kapasitas Pabrik ... 4

E. Lokasi Pabrik ... 5

II. PEMILIHAN DAN URAIAN PROSES A. Proses Pembuatan Trinatrium Fosfat ... 8

B. Pemilihan Proses ... 10

1. Kelayakan Ekonomi ... 11

2. Kelayakan Teknis ... 18

C. Deskripsi Proses ... 22

III.SPESIFIKASI BAHAN BAKU DAN PRODUK A. Bahan Baku ... 33

B. Produk ... 34

1. Produk Utama ... 34

2. Produk Samping ... 34

IV. NERACA MASSA DAN NERACA ENERGI A. Neraca Massa ... 37

(14)

ii

V. SPESIFIKASI PERALATAN

A. Peralatan Proses ... 44

B. Peralatan Utilitas ... 59

VI. UTILITAS DAN PENGOLAHAN LIMBAH A. Unit Pendukug Proses (Utilitas) ... 88

B. Pengolahan Limbah ... 117

C.Laboratorium ... 120

D.Instrumentasi dan Pengendalian Proses ... 124

VII. LOKASI DAN TATA LETAK PABRIK A. Lokasi Pabrik ... 127

1. Faktor Primer ... 128

2. Faktor Sekunder ... 129

B. Tata Letak Pabrik ... 131

C. Tata Letak Alat Proses ... 136

D. Prakiraan Areal Lingkungan ... 138

VIII.SISTEM MANAJEMEN DAN OPERASI PERUSAHAAN A. Bentuk Perusahaan ... 140

B. Struktur Organisasi Perusahaan ... 143

C. Tugas dan Wewenang... 147

D. Status Karyawan dan Sistem Penggajian ... 155

E. Pembagian Jam Kerja Karyawan ... 156

F. Jumlah Tenaga Kerja ... 159

G. Kesejahteraan Karyawan ... 162

H. Manajemen Produksi ... 166

IX. INVESTASI DAN EVALUASI EKONOMI A. Investasi ... 171

B. Evaluasi Ekonomi ... 176

C. Angsuran Pinjaman ... 179

D. Discounted Cash Flow ... 179

X. KESIMPULAN DAN SARAN ... 181

(15)

iii

DAFTAR TABEL

Tabel halaman

1.1. Harga Bahan Baku dan Produk ... 2

1.2. Data Impor Trinatrium Fosfat Indonesia ... 3

1.3. Lokasi dan Kapasitas Produksi Industri Deterjen di Indonesia ... 3

2.1. Perbandingan Proses Pembuatan Trinatrium Fosfat ... 10

2.2. Data Energi Bebas Gibbs Pada Keadaan Standar ... 19

2.3. Perbandingan proses pembuatan Trinatrium Fosfat ... 23

4.1. Neraca Massa di Mixing Tank (MT-101) ... 37

4.2. Neraca Massa di Mixing Tank (MT-102) ... 37

4.3. Neraca Massa di Reaktor I (RE-201) ... 38

4.4. Neraca Massa di Evaporator (EV-201) ... 38

4.5. Neraca Massa di Crystallizer (CR-201) ... 38

4.6. Neraca Massa di Centrifuge (CF-301) ... 38

4.7. Neraca Massa di Rotary Dryer (RD-301) ... 39

4.8. Neraca Energi di Mixing Tank (MT-101) ... 39

4.9. Neraca Energi di Mixing Tank (MT-102) ... 39

4.10. Neraca Energi di Heater I (HE-101) ... 40

4.11. Neraca Energi di Heater II (HE-201) ... 40

4.12. Neraca Energi diReaktor (RE-201) ... 40

4.13. Neraca Energi di Evaporator 1 (EV-201)... 41

4.14. Neraca Energi di Evaporator 2 (EV-202) ... ... 41

4.15. Neraca Energi di Crystallizer (CR-201) ... 41

4.16. Neraca Enerrgi di Centrifuge (CF-301) ... 42

4.17. Neraca Enegi di Rotary Dryer (RD-301) ... 42

4.18. Neraca Energi di Heater Udara (HE-301) ... 42

[image:15.595.115.503.230.761.2]
(16)

iv

5.1. Spesifikasi Solid Storage (SS-101) ... 44

5.2. Spesifikasi Solid Storage (SS-102) ... 44

5.3. Spesifikasi Screw Conveyor (SC-101) ... 45

5.3. Spesifikasi Bucket Elevator (BE-101) ... 42

5.4. Spesifikasi Feeder (FE-101) ... 43

5.5. Spesifikasi Mixing Tank (MT-101) ... 43

5.6. Spesifikasi Storage Tank (ST-101) ... 44

5.7. Spesifikasi Heater I (HE-101) ... 45

5.8. Spesifikasi Heater II (HE-201) ... 46

5.9. Spesifikasi Reaktor I (RE-201) ... 47

5.10. Spesifikasi Evaporator 1 (EV-201) ... 48

5.11. Spesifikasi Evaporator 2 (EV-202) ... 49

5.12. Spesifikasi Crystallizer (CR-201) ... 50

5.13. Spesifikasi Centrifuge (CF-301) ... 50

5.14. Spesifikasi Screw Conveyor (SC-301) ... 51

5.15. Spesifikasi Rotary Dryer (RD-301) ... 51

5.16. Spesifikasi Fan (F-301) ... 52

5.17. Spesifikasi Fan (F-301) ... 52

5.18. Spesifikasi Heater Udara (AH-301) ... 53

5.19. Spesifikasi Cooling Screw Coveyor (SC-302) ... 54

5.20. Spesifikasi Bucket Elevator (BE-301) ... 54

5.21. Spesifikasi Solid Storage (SS-301) ... 55

5.22. Spesifikasi Belt Conveyor (BC-301) ... 56

5.23. Spesifikasi Warehouse (W-301) ... 56

5.24. Spesifikasi Pompa Proses (PO-101) ... 57

5.25. Spesifikasi Pompa Proses (PO-102) ... 57

5.26. Spesifikasi Pompa Proses (PO-201) ... 58

5.27. Spesifikasi Pompa Proses (PO-203) ... 58

5.28. Spesifikasi Pompa Proses (PO-301) ... 59

5.29. Spesifikasi Pompa Proses (PO-202) ... 59

5.30. Spesifikasi Bak Sedimentasi (BS-401) ... 60

(17)

v

5.32. Spesifikasi Storage Tank (ST-401) ... 61

5.33. Spesifikasi Storage Tank (ST-402) ... 61

5.34. Spesifikasi Storage Tank (ST-403) ... 62

5.35. Spesifikasi Clarifier (CF-401) ... 63

5.36. Spesifikasi Sand Filter (SF-401) ... 63

5.37. Spesifikasi Filter WaterTank (FWT-401) ... 64

5.38. Spesifikasi Domestic Water Tank (DOWT-401) ... 65

5.39. Spesifikasi Hydrant Water Tank (HWT-401) ... 66

5.40. Spesifikasi Hot Basin (HB-401) ... 66

5.41. Spesifikasi Cooling Tower (CT-401) ... 67

5.42. Spesifikasi Cold Basin (CB-401) ... 67

5.43. Spesifikasi Storage Tank (ST-404) ... 68

5.44. Spesifikasi Storage Tank (ST-405) ... 69

5.45. Spesifikasi Condensat Water Tank (CWT-401) ... 69

5.46. Spesifikasi Cation Exchanger (CE-401) ... 70

5.47. Spesifikasi Anion Exchanger (AE-401) ... 71

5.48. Spesifikasi Storage Tank (ST-406) ... 71

5.49. Spesifikasi Demin Water Tank (DWT-401) ... 72

5.50. Spesifikasi Deaerator (DA-401) ... 73

5.51. Spesifikasi Storage Tank (ST-407) ... 73

5.52. Spesifikasi Pompa Utilitas (PU-401) ... 74

5.53. Spesifikasi Pompa Utilitas (PU-402) ... 74

5.54. Spesifikasi Pompa Utilitas (PU-403) ... 75

5.55. Spesifikasi Pompa Utilitas (PU-404) ... 76

5.56. Spesifikasi Pompa Utilitas (PU-405) ... 76

5.57. Spesifikasi Pompa Utilitas (PU-406) ... 77

5.58. Spesifikasi Pompa Utilitas (PU-407) ... 77

5.59. Spesifikasi Pompa Utilitas (PU-408) ... 78

5.60. Spesifikasi Pompa Utilitas (PU-409) ... 78

5.61. Spesifikasi Pompa Utilitas (PU-410) ... 79

5.62. Spesifikasi Pompa Utilitas (PU-411) ... 79

(18)

vi

5.64. Spesifikasi Pompa Utilitas (PU-413) ... 80

5.65. Spesifikasi Pompa Utilitas (PU-414) ... 81

5.66. Spesifikasi Pompa Utilitas (PU-415) ... 81

5.67. Spesifikasi Boiler (B-401) ... 82

5.68. Spesifikasi Blower Steam (BS-401) ... 82

5.69. Spesifikasi Compressor (CP-401) ... 83

5.70. Spesifikasi AirCompressor (AK-401) ... 83

5.71. Spesifikasi Blower Amoniak (BA-401) ... 84

5.72. SpesifikasiPompa Amoniak 1 (PA-401) ... 84

5.73. SpesifikasiPompa Amoniak 2 (PA-402) ... 85

5.74. Spesifikasi Expansion Valve 1 (EV-301) ... 85

5.75. Spesifikasi Generator (GS-401) ... 86

5.76. Spesifikasi Storage Tank (ST-407) ... 86

6.1. Standar Air untuk Kebutuhan Domestik ... 88

6.2. Kebutuhan Air untuk General Uses ... 90

6.3. Kebutuhan Air untuk Air Pendingin ... 91

6.4. Baku Mutu Air Proses ... 97

6.5. Kebutuhan Steam ... 98

6.6. Kebutuhan Air untuk Process Water ... 98

6.7. Kebutuhan Penerangan untuk Area dalam Bangunan ... 109

6.8. Kebutuhan Penerangan untuk Area luar Bangunan ... 110

6.9. Kebutuhan Listrik untuk Alat Proses ... 111

6.10. Kebutuhan Listrik untuk Alat Utilitas ... 112

6.11. Kebutuhan Amoniak Refrigerant ... 117

6.12. Syarat-Syarat Kualitas (Mutu) Air Limbah ... 118

6.13. Tingkatan Kebutuhan Informasi dan Sistem Pengendalian ... 126

6.14. Pengendalian Variabel Utama Proses ... 127

7.1. Dasar Pemilihan Lokasi Pabrik ... 128

7.2. Perincian Luas Area Pabrik Disodium Phosphat ... 139

8.1. Jadwal Kerja Regu Shift ... 159

8.2. Jumlah Operator berdasarkan Jenis Alat ... 160

(19)

vii

9.1. Fixed Capital Investment ... 173

9.2. Manufacturing Cost ... 174

9.3. General Expenses ... 175

9.4. Biaya Administrasi ... 176

(20)

vii

DAFTAR GAMBAR

Gambar halaman

2.1. Blok diagram pembuatan Disodium Fosfat dari asam Fosfat

dan sodium karbonat ... 12

2.2. Struktur molekul Na2CO3 ... 23

2.3. Rumus molekul K2CO3 ... 23

2.4. Struktur molekul Na2HPO4 ... 23

2.5. Struktur molekul K2HPO4 ... 23

2.6. Diagram Alir Proses Pembuatan Disodium Fosfat ... 28

6.1. Cooling Tower ... 94

6.2. Diagram Cooling Water System ... 95

6.3. Diagram Alir Pengolahan Air ... 100

6.4. Deaerator ... 108

6.5. Siklus Liquifaction ... 117

7.1. Peta Provinsi Jawa Timur ... 132

7.2. Peta Kabupaten Lamongan ... 132

7.3. Tata Letak Alat Pabrik ... 136

7.4. Tata Letak Alat Proses ... 138

(21)

DAFTAR PUSTAKA

Banchero, B.1955. Chemical Engineering Series. Mc Graw Hill in Chemical Engineering : New York

Biegler, T.1997. Systematic Methods of Chemical Process Design. Prentice Hall International : London

Brown, G.1950. Unit Operations.John Wiley and Sons : New York

Brownell, Young.1959. Equipment Process Design.Wiley Eastern Limited : Bangalore

Chemical Data Chemmaths. 2011.

Chemical Engineering Magazine, Ed. Juni 2011.

Coulson, Richardson.1983. Chemical Engineering, Vol. 6th. Pergamon Press : New York

Coulson, Richardson.1955. Chemical Engineering, Vol. 2nd. Butterworth-Heinemann : Boston

FLSmidth, One Source. 2011. Door Oliver Eimco Thickeners.

Fogler, Scott, H.1999.Elements of Chemical Reaction Engineering, Ed. 3th. Prentice Hall International : London

Foust, A.1960. Principles of Unit Operations, Ed. 2nd. John Wiley and Sons : New York

Geankoplis, C. J.1983. Transport Processes and Unit Operations, Ed. 2nd. Allyn and Bacon, Inc : London

H. Porse, CP Keko ApS, pers.comm, 2009.

(22)

Hensley, C.2006. Cooling Tower Fundamentals. SPX Cooling Technologies : Kansas

Himmelblau.1996. Basic Principles and Calculations in Chemical Engineering. Prentice Hall International : London

Ismail, S.1996. Alat Industri Kimia. Unversitas Sriwjaya : Palembang Kepdal. 2000 No. 113. Pedoman Teknis Laboratorium Lingkungan. Kern, D.1950. Process Heat Transfer. Mc Graw Hill International Book

Company: London

Keyes, F. and Clark, R.S. 1959, Industrial Chemistry, 2nd edition, John Wiley and Sons, Inc., New York.

Lesmana, D.2009. Bahan Kuliah Teknologi Buangan Industri Modul Limbah Cair, Padat, Gas, dan B3.Universitas Lampung : Bandar Lampung Levenspiel, O.1999. Chemical Reaction Engineering, Ed. 3rd.

John Wiley and Sons : New York Material Codes. 2011.

Mc Cabe.1985. Unit Operation of Chemical Engineering, Jilid. 2nd, Ed. 4th.

Mc Graw Hill Book Company : New York

Mc Lanahan Corp. Aggregate Processing Division Brosure.2011

Menteri Keuangan Republik Indonesia, Agus Martowardojo, 14 Juni 2011, 09:51 WIB et.al. Kompas.com.

MIP Process Technology.2011. MIP Thickener Design.

Missen, R.1928.Introduction to Chemical Reaction Engineering and Kinetics.John Wiley and Sons : New York

Moss, D.2004.Pressure Vessel Design Manual, Ed. 3th.Elvesier : Boston MSDS Sodium Carbonate.Science Lab.com, 21 Februari 2011, 10:22 WIB MSDS Phosphate Acid.Science Lab.com, 21 Februari 2011, 10:25 WIB

Mulyono, P.1997.Ekonomi Teknik Kimia.Universitas Gajah Mada : Yogyakarta Perry’s.1950.Chemical Engineer’s Handbook, Ed. 3th

(23)

Perry’s.1963.Chemical Engineer’s Handbook, Ed. 4th.Mc Graw Hill Book Company : London

Perry’s.1999.Chemical Engineer’s Handbook, Ed. 7th.Mc Graw Hill Book Company : London

Perry’s.2008.Chemical Engineer’s Handbook, Ed. 8th.Mc Graw Hill Book Company : London

Peter, Timmerhaus.2002. Plant Design and Economics for Chemical Engineers.Mc Graw Hill Higher Education : New York

Powel, S.1954.Water Conditioning for Industry, Ed. 1st.Mc Graw Hill Book Company : London

Rase.1977.Chemical Reactor Design for Process Plant, Vol. 1st, Principles and Techniques.John Wiley and Sons : New York

Reid, C.1987.The Properties of Gases and Liquids, Ed. 4th. Donneley and Sons : New York

Reklaitis, G. V.1983. Introduction to Material and Energy Balances.Mc Graw Hill Book Company : London

Sari, A.2010. Bahan Kuliah Utilitas dan Penggerak Mula Modul Pengolahan Air Industri. Universitas Lampung : Bandar Lampung

Sarto dan Alamsyah. 2007. Kinetika Reaksi Pembuatan Di-Kalium Phosphat dan Kalium Karbonat. Universitas Gajah Mada : Yogyakarta

Schepman, B. A.1962.New Concepts in Thickener Design, Underflow Pump Arrangement, and Automatic Controls. SK-SNI Air Bersih, 12 Juni 2011, 13:25 WIB

Smith, J. M.2001.Introduction to Chemical Engineering Thermodynamics, Ed. 6th.Mc Graw Hill International Edition : New York

Smith, J.M.1981.Chemical Engineering Kinetics, Ed. 3th. Mc Graw Hill International Edition : New York

Smith, R.2005.Chemical Process Design and Integration.John Wiley and Sons : New York

Sugiharto.1987. Dasar-Dasar Pengelolaan Air Limbah. Universitas Indonesia : Jakarta

(24)

Treyball, R.1981. Mass Transfer Operations, Ed. 2nd.Mc Graw Hill Book Company : London

Ulrich, G.1984.A Guide to Chemical Engineering Process Design and Economics. University of New Hampshire : USA

Wallas, M.1990. Chemical Process Equipment. Butterworth-Heinemann : Boston Wang, L, K.2008. Gravity Thickener, Handbook of Enviromental Engineering,

Vol. 6th. The Humana Press Inc. : New Jersey

Wilson, E. T.2005. Clarifier Design. Mc Graw Hill Book Company : London

http://www.sbioinformatics.com/design_thesis/Terephthalic_acid/Terephthalic-2520acid_Design-2520of-2520Equipments.pdf : 8 Juni 2012, 11:00 WIB http://duniainfo100.blogspot.com/2011/02/daftar-standar-gaji-perusahaan.html, 22

Agustus 2011, 10:36 WIB

wikipedia, air bersih dan sanitasi, 8 Juni 2012, 13:20 WIB

www.bappenas.go.id/get-file-server/node/5945/, 21 Maret 2012, 14:17 WIB www.bps.go.id, Statistic Indonesia, 2012, Indonesia, 21 Januari 2013, 23.16 WIB http://matche.com/EquipCost.html, 14 Nopember 2012, 09:00 WIB

Gambar

Tabel

Referensi

Dokumen terkait

Maka dari itu, akan didirikan Pabrik Trisodium Fosfat dengan kapasitas 45.000 ton/tahun untuk memenuhi kebutuhan dalam negeri dan untuk peluang ekspor.. Pabrik

Judul Tugas Akhir ini adalah Prarancangan Pabrik Asam Asetat dari Metanol dan Karbon Monoksida dengan Proses Monsanto kapasitas 100.000 Ton Per Tahun.Adanya

Berdasarkan hasil analisis ekonomi yang telah dilakukan terhadap Prarancangan Pabrik Sodium Sulfat dari Sodium Klorida dan Sulfur dengan kapasitas 30.000

Prarancangan Pabrik Vinyl Chloride Monomer dengan Proses Pirolisis Ethylene Dichloride Kapasitas 100.000

Tugas Prarancangan Pabrik dengan judul Prarancangan Pabrik Biodiesel dari Crude Palm Oil (CPO) dan Metanol Kapasitas 660.000 Ton/Tahun ini disusun sebagai

Dalam perancangan pabrik sodium silikat dari natrium hidroksida dan pasir silika dengan kapasitas 65.000ton/tahun diperoleh kesimpulan sebagai berikut: Perancangan

Maka dari itu, akan didirikan Pabrik Trisodium Fosfat dengan kapasitas 45.000 ton/tahun untuk memenuhi kebutuhan dalam negeri dan untuk peluang ekspor1. Pabrik

Indah Dwi Handayani dan Yohanita Restu Widihastuty, 2021, Prarancangan Pabrik Natrium Nitrat dari Natrium Klorida dan Asam Nitrat Kapasitas 40.000 Ton/Tahun, Program Studi