• Tidak ada hasil yang ditemukan

Pile Driving With Jack-In Pile At Building Project

N/A
N/A
Protected

Academic year: 2017

Membagikan "Pile Driving With Jack-In Pile At Building Project"

Copied!
5
0
0

Teks penuh

Loading

Gambar

Table 1.  Results of One-Sample Test Analysis with SPSS 16 for 1 Point Piling
Table 4. Case Types that Cause Idle and The Percentage occurance

Referensi

Dokumen terkait

5 Chin method result The results of the ultimate bearing capacity of bore pile using Meyerhoff method, Reese & Wright method, and the interpretation of Static Loading Test using Chin