`` #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

 NETWORK PLAN

 NETWORK PLANNING

NING

(2)

JADWAL WAKTU PELAKSANAAN PEKERJAAN

PEKERJAAN : LANJUTAN PEMBANGUNAN GEDUNG CARDIAC CENTER : PEMBANGUNAN INSTALASI PENGOLAHAN AIR LIMBAH

( IPAL ) DAN PEMUSNAH SAMPAH MEDIS RUMAH SAKIT ( INCENERATOR )

LOKASI : RSUP PROF Dr R. D. KANDOU MANADO

TAHUN ANGGARAN : 2013

I II III IV V VI VII VIII IX X XI XII XIII XIV XV XVI

I PEMBANGUNAN INSTALASI PENGOLAHAN AIR LIMBAH ( IPAL ) RUMAH SAKIT II PEKERJAAN RUMAH INCENERATOR 

III INCENERATOR ( SLI 1 ) + Acsesories

#REF! #REF!

#REF! #REF!

NO URAIAN KEGIATAN

WAKTU PELAKSANAAN 120 HARI KALENDER 

(3)

BART CHART

PEKERJAAN : LANJUTAN PEMBANGUNAN GEDUNG CARDIAC CENTER : PEMBANGUNAN INSTALASI PENGOLAHAN AIR LIMBAH ( IPAL ) DAN PEMUSNAH SAMPAH MEDIS RUMAH SAKIT ( INCENERATOR )

LOKASI : RSUP PROF Dr R. D. KANDOU MANADO TAHUN ANGGARAN : 2013

I II III IV V VI VII VIII IX X XI XII XIII XIV XV XVI

I PEMBANGUNAN INSTALASI PENGOLAHAN AIR LIMBAH ( IPAL ) RUMAH SAKIT 85.37 6.10 6.10 6.10 6.10 6.10 6.10 6.10 6.10 6.10 6.10 6.10 6.10 6.10 6.10

II PEKERJAAN RUMAH INCENERATOR  2.67 0.53 0.53 0.53 0.53 0.53

III INCENERATOR ( SLI 1 ) + Acsesories 11.97 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 100.00

#REF!  6.098  6.098  7.018  7.018  7.018  7.018  7.018  7.552  7.552  7.018  7.018  7.018   7.018   7.552  1.454 0.533 #REF!  12.195  13.116  14.036  14.036  14.036  14.036  14.570  15.103  14.570  14.036  14.036  14.036  14.570  9.005 1.987

#REF! #REF!

BULANIII BULANIV

NO URAIANKEGIATAN  BOBOT

( % )

WAKTU PELAKSANAAN 120 HARI KALENDER 

(4)

S CURVE

PEKERJAAN : LANJUTAN PEMBANGUNAN GEDUNG CARDIAC CENTER : PEMBANGUNAN INSTALASI PENGOLAHAN AIR LIMBAH ( IPAL ) DAN PEMUSNAH SAMPAH MEDIS RUMAH SAKIT ( INCENERATOR )

LOKASI : RSUP PROF Dr R. D. KANDOU MANADO TAHUN ANGGARAN : 2 01 3

I II III IV V VI VII VIII IX X XI XII XIII XIV XV XVI

I PEMBANGUNAN INSTALASI PENGOLAHAN AIR LIMBAH ( IPAL ) RUMAH SAKIT 85.37 6.10 6.10 6.10 6.10 6.10 6.10 6.10 6.10 6.10 6.10 6.10 6.10 6.10 6.10

100

II PEKERJAAN RUMAH INCENERATOR  2.67 0.53 0.53 0.53 0.53 0.53

III INCENERATOR ( SLI 1 ) + Acsesories 11.97 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 100.00

RENCANA KERJA MINGGUAN 6.10 6.10 7.02 7.02 7.02 7.02 7.02 7.55 7.55 7.02 7.02 7.02 7.02 7.55 1.45 0.53

RENCANA KERJA KUMULATIF 6.10 12.20 19.21 26.23 33.25 40.27 47.29 54.84 62.39 69.41 76.42 83.44 90.46 98.01 99.47 100.00

#REF!

-#REF!

#REF! #REF!

NO URAIANKEGIATAN  BOBOT

( % )

WAKTU PELAKSANAAN 120 hari Kalender 

(5)

LAMPIRAN

: SURAT PERJANJIAN

NOMOR

: HK.06.01/II.3/231/2013

TANGGAL

: 30 AGUSTUS 2013

PEKERJAAN : PEMBANGUNAN GEDUNG RUMAH SAKIT LANJUTAN PEMBANGUNAN GEDUNG CARDIAC CENTER :

PEMBANGUNAN INSTALASI PENGOLAHAN AIR LIMBAH (IPAL) DAN PEMUSNAH SAMPAH MEDIS RUMAH SAKIT (INCINERATOR

HARGA

JUMLAH

SATUAN

HARGA

ANGKA SATUAN

(

Rp

)

(

Rp

)

A.

PEMBANGUNAN INSTALASI PENGOLAHAN AIR LIMBAH ( IPAL ) RUMAH SAKIT

I

PEKERJAAN PERSIAPAN

1

Direksi

Keet,

Pondok

Kerja

dan

Gudang

Bahan

LS

 

12.00

m2

 

250,000.00

3,000,000.00

2

Pengadaan

air

bersih

untuk

adukan

beton

LS

 

1.00

Pekj

 

350,000.00

350,000.00

3

Papan

Nama

Proyek

LS

 

1.00

Pekj

 

750,000.00

750,000.00

4

Pemasangan

Bowplank

B.3

 

40.00

m

 

54,300.00

2,172,000.00

6,272,000.00

II

PEKERJAAN PIPING

1

Pekerjaan galian tanah dalam 50 - 90 cm

B.1

 

281.25

m3

 

39,375.00

11,074,218.75

2

Pekerjaan pemasangan pipa PVC 6 inchi

LS

 

475.00

m

 

124,492.50

59,133,937.50

3

Pekerjaan pemasangan pipa PVC 2 inchi

LS

 

150.00

m

 

33,240.00

4,986,000.00

4

Pekerjaan

urugan

tanah

kembali

B.3

 

281.25

m3

 

13,100.00

3,684,375.00

78,878,531.25

III

PEKERJAAN BAK KONTROL

1

Galian

Tanah

B.1

 

42.46

m3

 

39,375.00

1,671,923.08

2

Pas.

Batu

bata

D.2

 

51.20

m2

 

99,935.00

5,116,672.00

3

Plesteran

E.2

 

102.40

m2

 

32,368.00

3,314,483.20

4

Urugan

kembali

B.3

 

1.92

m3

 

13,100.00

25,152.00

5

Lantai

bak

cor

beton

G.3

 

2.56

m3

 

628,050.00

1,607,808.00

6

Tutup

plat

besi

LS

 

20.00

set

 

200,000.00

4,000,000.00

15,736,038.28

IV

PEKERJAAN HOUSING

1

Galian

Tanah

B.1

 

4.62

m3

 

39,375.00

181,912.50

2

Pondasi

C.1

 

3.96

m3

 

584,825.00

2,315,907.00

3

Sloof

G.7

 

0.33

m3

 

5,954,214.94

1,964,890.93

4

Kolom

praktis

G.12

 

0.27

m3

 

8,897,922.76

2,402,439.14

5

Dinding

Pas

bata

D.1

 

30.00

m2

 

108,025.00

3,240,750.00

6

Plesteran

1

:

2

E.1

 

60.00

m2

 

36,468.80

2,188,128.00

7

Tanah

Urugan

Lantai

B.6

 

1.95

m3

 

195,750.00

381,712.50

8

Pasir

urugan

lantai

B.5

 

0.65

m3

 

225,750.00

146,737.50

9

Lantai cor beton

G.2

 

1.30

m3

 

629,250.00

818,025.00

10

Rangka

atap

baja

ringan

LS

 

15.00

m2

 

225,000.00

3,375,000.00

11

Atap

asbes

gelombang

LS

 

15.00

m2

 

98,500.00

1,477,500.00

12

Plafond

LS

 

14.50

m2

 

65,000.00

942,500.00

13

Pasangan

keramik

lantai

30

x

30

cm

G.15

 

15.00

m2

 

147,540.00

2,213,100.00

14

Kosen

dan

pintu

kayu

(

komplit

)

LS

 

1.00

set

 

2,500,000.00

2,500,000.00

15

Cat

tembok

M.1

 

60.00

m2

 

21,268.50

1,276,110.00

16

Cat

minyak

M.4

 

6.00

m2

 

19,800.00

118,800.00

17

Lampu

TL

komplit

LS

 

2.00

set

 

140,000.00

280,000.00

25,823,512.58

V

PEKERJAAN BAK EQUALISASI

1

Galian

Tanah

B.2

 

87.17

m3

 

48,375.00

4,216,848.75

2

Lantai

kerja

t

=

5

cm

G.2

 

1.15

m3

 

629,250.00

723,637.50

3

Pasir

urug

t

=

10

cm

B.5

 

2.31

m3

 

225,750.00

521,482.50

4

Urugan

sirtu

t

=

20

cm

B.7

 

4.62

m3

 

380,250.00

1,756,755.00

5

Dinding

beton

bertulang

G.13

 

12.58

m3

 

4,788,025.27

60,233,357.92

6

Lantai

bak

cor

beton

bertulang

G.14

 

4.62

m3

 

5,093,619.02

23,532,519.88

7

Balok

beton

15/15

G.11

 

0.26

m3

 

5,084,573.38

1,321,989.08

8

Tutup

plat

besi

LS

 

9.00

set

 

250,000.00

2,250,000.00

94,556,590.63

VI

PEKERJAAN DUDUKAN BIOREACTOR ( 2 UNIT )

1

Galian

Tanah

B.1

 

14.78

m3

 

39,375.00

581,962.50

2

Pondasi

C.1

 

11.70

m3

 

584,825.00

6,842,452.50

3

Sloof

G.7

 

0.92

m3

 

5,954,214.94

5,477,877.75

4

Urugan

sitru

B.7

 

2.42

m3

 

380,250.00

920,205.00

5

Lantai

beton

bertulang

(

Port

Aerobic

Reactor

)

G.14

 

4.84

m3

 

5,093,619.02

24,653,116.07

6

Plesteran

tepi

pondasi

E.1

 

30.36

m2

 

36,468.80

1,107,192.77

7

Tiang

HL

4*4

(

t

=

16

mm

)

LS

 

45.00

btg

 

170,000.00

7,650,000.00

8

Atap

Polikarbonat

LS

 

45.50

m2

 

325,000.00

14,787,500.00

62,020,306.58

VII

PEKERJAAN BAK PRETREATMENT KITCHEN & LOUNDRY

1

Galian

Tanah

B.1

 

1.50

m3

 

39,375.00

59,062.50

2

Pas.

Batu

bata

D.2

 

5.60

m2

 

99,935.00

559,636.00

3

Plesteran

E.1

 

11.20

m2

 

36,468.80

408,450.56

4

Urugan

sirtu

B.7

 

0.22

m3

 

380,250.00

83,655.00

5

Lantai

bak

cor

beton

G.3

 

0.30

m3

 

628,050.00

188,415.00

6

Tutup

plat

besi

LS

 

2.00

set

 

200,000.00

400,000.00

1,699,219.06

VIII

PEKERJAAN FISH POND

1

Galian

Tanah

B.1

 

4.92

m3

 

39,375.00

193,725.00

2

Pas.

Batu

bata

D.2

 

5.00

m2

 

99,935.00

499,675.00

3

Plesteran

E.1

 

10.00

m2

 

36,468.80

364,688.00

4

Urugan

sirtu

B.7

 

0.60

m3

 

380,250.00

228,150.00

5

Lantai

bak

cor

beton

G.3

 

1.20

m3

 

628,050.00

753,660.00

2,039,898.00

IX

PEKERJAAN BAK CHLORINE

1

Galian

Tanah

B.1

 

1.96

m3

 

39,375.00

77,175.00

2

Pas.

Batu

bata

D.2

 

2.40

m2

 

99,935.00

239,844.00

3

Plesteran

E.1

 

4.80

m2

 

36,468.80

175,050.24

4

Urugan

sirtu

B.7

 

0.10

m3

 

380,250.00

38,025.00

5

Lantai

bak

cor

beton

G.3

 

0.20

m3

 

628,050.00

125,610.00

6

Tutup

pelat

besi

LS

 

1.00

set

 

200,000.00

200,000.00

855,704.24

JUMLAH V

JUMLAH VI

JUMLAH IX

JUMLAH IV

JUMLAH I

ANALISA

NO

URAIAN

PEKERJAAN

VOLUME

JUMLAH II

JUMLAH VIII

JUMLAH VII

JUMLAH III

(6)

HARGA

JUMLAH

SATUAN

HARGA

ANGKA SATUAN

(

Rp

)

(

Rp

)

ANALISA

NO

URAIAN

PEKERJAAN

VOLUME

X

PEKERJAAN PEMBUATAN TAMAN

1

Pekerjaan

pembuatan

taman

disekitar

lokasi

IPAL

LS

 

1.00

set

 

13,500,000.00

13,500,000.00

13,500,000.00

XI

PEKERJAAN PEMBUATAN SEPTITANK 

1

Galian

Tanah

B.2

 

60.75

m3

 

48,375.00

2,938,781.25

2

Pondasi

batu

kali

C.1

 

3.76

m3

 

584,825.00

2,198,942.00

3

Sloof

15/20

G.7

 

0.56

m3

 

5,954,214.94

3,334,360.37

4

Lantai

kerja

t

=

5

cm

G.2

 

0.73

m3

 

629,250.00

459,352.50

5

Pasir

urug

t

=

10

cm

B.5

 

1.46

m3

 

225,750.00

329,595.00

6

Lantai

cor

beton

G.1

 

2.93

m3

 

629,250.00

1,843,702.50

7

Dinding

pasangan

bata

D.1

 

46.99

m2

 

108,025.00

5,076,094.75

8

Plesteran

dan

acian

(

E.2

+

E.4

)

 

55.24

M2

 

51,068.00

2,820,996.32

9

Kolom

15/15

G.9

 

0.30

m3

 

8,714,468.46

2,614,340.54

10

Pelat

penutup

beton

bertulang

G.14

 

2.14

m3

 

5,093,619.02

10,900,344.71

11

Ring

balok

15/15

G.11

 

0.25

m3

 

5,084,573.38

1,271,143.35

12

Tutup Manhole dari beton

LS

2.00

set

 

350,000.00

700,000.00

34,487,653.28 68,975,306.56

370,357,107.18

XII

BIO+STRAIN REACTOR 

a. Main Frame

 b. Biomed Filtration Tecnolog

c. Aero Reactor ( Diffuser )

d. Generatif Starter 

e. Nutrie Bac

f. BRU System

g. Trickling Filter 

h. Package ( Vacuum Flat Membrane )

2.00

 

set

930,798,000.00

1,861,596,000.00

XIII

INLET PUMP

 

2.00

set

15,000,000.00

30,000,000.00

XIV

SCREE NING

a. Bar Screen

 

1.00

set

3,000,000.00

3,000,000.00

 b. Fine Screen

 

1.00

set

3,000,000.00

3,000,000.00

XV

ROOT BLOWER  

 

2.00

set

20,000,000.00

40,000,000.00

XVI

PRA PENGOLAHAN LIMBAH CAIR DAPUR 

 

1.00

set

10,000,000.00

10,000,000.00

XVII PRA PENGOLAHAN LIMBAH CAIR CUCIAN ( LOUNDRY )

 

1.00

set

10,000,000.00

10,000,000.00

XVIII PRA PENGOLAHAN LIMBAH CAIR LABORATORIUM

 

1.00

set

80,000,000.00

80,000,000.00

XIX

ALCHIMIA COMPOUND ANNIHILATION APPARATUS

 

1.00

set

60,000,000.00

60,000,000.00

XX

CHLO RINAT OR

a. Dosing pump

 

1.00

set

10,000,000.00

10,000,000.00

 b. Tangki Chlorine

 

1.00

set

1,000,000.00

1,000,000.00

XXI

TRANSFER PUMP

 

2.00

set

15,000,000.00

30,000,000.00

XXII ORGANIC REDUCING APPARATUS

 

1.00

set

8,000,000.00

8,000,000.00

XXIII PANEL CONTROLE

 

1.00

set

15,000,000.00

15,000,000.00

XXIV LABORATORY TEST sesuai dengan Kep 58/MENLH/12/1995

 

1.00

set

5,000,000.00

5,000,000.00

2,536,953,107.18

JUMLAH ( I - XI )

TOTAL 2 UNIT

JUMLAH X

JUMLAH A (I - XXIV )

JUMLAH XI

(7)

HARGA

JUMLAH

SATUAN

HARGA

ANGKA SATUAN

(

Rp

)

(

Rp

)

ANALISA

NO

URAIAN

PEKERJAAN

VOLUME

B.

PEKERJAAN RUMAH INCENERATOR 

I PEKERJAAN PONDASI

1

Galian

tanah

untuk

pondasi

B.1

 

8.64

M3

 

39,375.00

340,200.00

2

Urugan

pasir

bawah

pondasi

t

=

10

cm

B.5

 

1.08

M3

 

225,750.00

243,810.00

3

Pondasi

batu

kali

C.1

 

6.84

M3

 

584,825.00

4,000,203.00

4

Sloof

15/20

G.7

 

0.54

M3

 

5,954,214.94

3,215,276.07

5

Urugan

tanah

kembali

B.6

 

1.62

M3

 

195,750.00

317,115.00

Jumlah 8,116,604.07

II PEK ERJAAN LANTAI

1

Urugan

sirtu

peninggian

lantai

B.7

 

3.00

M3

 

380,250.00

1,140,750.00

2

Urugan

pasir

bawah

lantai

t

=

10

cm

B.5

 

2.00

M3

 

225,750.00

451,500.00

3

Lantai

plat

beton

bertulang

t

=

15

cm

G.14

 

3.00

M3

 

5,093,619.02

15,280,857.07

Jumlah 16,873,107.07

III PEKERJAAN DINDING

1

Pasangan

batu

bata

1

:

4

D.2

 

17.72

M2

 

99,935.00

1,770,848.20

2

Plesteran

dinding

1

:

5

E.2

 

35.44

M2

 

32,368.00

1,147,121.92

3

Acian

E.4

 

35.44

M2

 

18,700.00

662,728.00

Jumlah 3,580,698.12

IV PEKERJAAN RANGKA BAJA

1

Kolom

CNP

150x50x20x2,3

(

Double

)

N.8

 

360.48

Kg

 

17,795.00

6,414,741.60

2

Kolom

CNP

150x50x20x2,3

(

Single

)

N.8

 

90.12

Kg

 

17,795.00

1,603,685.40

3

Balok

CNP

75x45x15x2,3

(

Double

)

N.8

 

468.00

Kg

 

17,795.00

8,328,060.00

4

Besi

siku

40x40x4

N.9

 

261.34

Kg

 

18,370.00

4,800,815.80

5

Teralis

besi

6mm

LS

 

79.04

M2

 

225,000.00

17,784,000.00

Jumlah 38,931,302.80 V PEKERJAAN PINTU

1

Besi

siku

40x40x4

N.9

 

30.60

Kg

 

18,370.00

562,122.00

2

Teralis

besi

8mm

LS

 

4.09

M2

 

225,000.00

920,250.00

Jumlah 1,482,372.00

VI PEK ERJAAN ATAP

1

Kuda

kuda

CNP

125x50x20x2,3

(

Double

)

N.8

 

126.28

Kg

 

17,795.00

2,247,152.60

2

Gording

CNP

75x45x15x2.3

N.8

 

171.60

Kg

 

17,795.00

3,053,622.00

3

Asbes

gelombang

kecil

H.1

 

46.20

M2

 

62,150.00

2,871,330.00

4

Bubungan

/

nok

asbes

H.2

 

6.60

M'

 

31,004.00

204,626.40

Jumlah 8,376,731.00

VII PEKERJAAN PENGECATAN

1

Pengecatan

dinding

M.1

 

35.44

M2

 

21,268.50

753,755.64

2

Pengecatan

besi

M.5

 

83.13

M2

 

10,140.00

842,938.20

Jumlah 1,596,693.84

VIII PEKERJAAN INSTALASI LISTRIK 

1

Lampu

TL

40

watt

LS

 

2.00

Bh

 

100,000.00

200,000.00

2

Saklar

ganda

LS

 

1.00

Bh

 

35,000.00

35,000.00

3

Stop

kontak

LS

 

3.00

Bh

 

25,000.00

75,000.00

Jumlah 310,000.00

79,267,508.90

C INCENERATOR ( SLI 1 ) + Acsesories

INCENERATOR ( SLI 1 )

LS

1.00

SET

295,600,000.00

295,600,000.00

MESIN PENGHANCUR JARUM SUNTIK BEKAS PAKAI

LS

1.00

SET

60,000,000.00

60,000,000.00

(USED NEEDLE AND SYRINGE MILLING UNIT )

355,600,000.00 2,971,820,616.07 297,182,061.61 3,269,002,677.68 3,269,000,000.00

SELAKU

KUASA PENGGUNA ANGGARAN

Dr. DJOLLY M. RUMOPA,SpOG

NIP. 195507181983011001

MARLYN

LONGKUTOY,

S.Pd,M.Kes

TUMUNGGU

SILITONGA

NIP.

196208111981112001

DIREKTUR

MENGETAHUI,

DIREKTUR UTAMA

TOTALDIBULATKAN

Untuk

dan

atas

nama,

Untuk

dan

atas

nama,

BLU

RSUP

Prof.Dr.R.D.Kandou

MANADO

PT

ROGABE

PASTRI

JUMLAH ( B )

JUMLAH (C) JUMLAH (A,B, C)

PPN 10% TOTAL

(8)

PEKERJAAN : LANJUTAN PEMBANGUNAN GEDUNG CARDIAC CENTER : PEMBANGUNAN INSTALASI PENGOLAHAN AIR LIMBAH ( IPAL ) DAN PEMUSNAH SAMPAH MEDIS RUMAH SAKIT ( INCENERATOR )

LOKASI : RSUP PROF Dr R. D. KANDOU MANADO

TAHUN ANGGARAN : 2013

No

A.

B.

C.

#REF! #REF! #REF! #REF!

Total

Jumlah

Rp

3,269,002,677.68

REKAPITULASI

URAIAN

JUMLAH

PEMBANGUNAN INSTALASI PENGOLAHAN AIR LIMBAH ( IPAL ) RUMAH SAKIT

Rp

2,536,953,107.18

PEKERJAAN

RUMAH

INCENERATOR

Rp

79,267,508.90

INCENERATOR

(

SLI

1

)

+

Acsesories

Rp

355,600,000.00

Jumlah

Dibulatkan

Rp

3,269,000,000.00

Terbilang:

Tiga M ill iar Du a Ratus Enam Puluh Sembilan Juta Rupiah 

Jumlah

Rp

2,971,820,616.07

(9)

PEKERJAAN : LANJUTAN PEMBANGUNAN GEDUNG CARDIAC CENTER : PEMBANGUNAN INSTALASI PENGOLAHAN AIR LIMBAH ( IPAL ) DAN PEMUSNAH SAMPAH MEDIS RUMAH SAKIT ( INCENERATOR )

LOKASI : RSUP PROF Dr R. D. KANDOU MANADO TAHUN ANGGARAN : 2013

HARGA SATUAN BAHAN UPAH JUMLAH

Rp Rp Rp Rp

1 3 4 5 6 7

1 1 M' Pengukuran dan pemasangan bowplank 

0.012 m3 Kayu 5x7 cm kelas IV 2,150,000.00 25,800.00

0.020 kg Besi paku biasa 18,000.00 360.00

0.007 m3 Kayu papan kelas IV 2,295,000.00 16,065.00

0.100 Oh Tukangkayu 60,000.00 6,000.00

0.100 Oh Pekerja 50,000.00 5,000.00

0.010 Oh KepalaTukang 70,000.00 700.00

0.005 Oh Mandor 75,000.00 375.00

Jumlah 42,225.00 12,075.00 54,300.00

2 1 M2 Menbersihkan Lapangan dan Perataan

0.100 Oh Pekerja 50,000.00 5,000.00

0.050 Oh Mandor 75,000.00 3,750.00

Jumlah 8,750.00 8,750.00

3 1 M3 Galian Tanah Biasa

0.750 Oh Pekerja 50,000.00 37,500.00

0.025 Oh Mandor 75,000.00 1,875.00

Jumlah 39,375.00 39,375.00

4 1 M3 Galian Tan ah Biasa 2 m

0.900 Oh Pekerja 50,000.00 45,000.00 0.045 Oh Mandor 75,000.00 3,375.00 Jumlah 48,375.00 48,375.00 5 1 M3 Urugan Kembali 0.250 Oh Pekerja 50,000.00 12,500.00 0.008 Oh Mandor 75,000.00 600.00 Jumlah 13,100.00 13,100.00

6 1 M3 Timbunan Pasir Urug

1.200 M3 Pasir Urug 175,000.00 210,000.00 0.300 Oh Pekerja 50,000.00 15,000.00 0.010 Oh Mandor 75,000.00 750.00 Jumlah 210,000.00 15,750.00 225,750.00 7 1 M3 Urugan Tanah 1.200 M3 Tanah Urug 150,000.00 180,000.00 0.300 Oh Pekerja 50,000.00 15,000.00 0.010 Oh Mandor 75,000.00 750.00 Jumlah 180,000.00 15,750.00 195,750.00

7.a. 1 M3 Ur ugan Sir tu

2.250 M3 Sirtu 162,000.00 364,500.00

0.300 Oh Pekerja 50,000.00 15,000.00

0.010 Oh Mandor 75,000.00 750.00

Jumlah 364,500.00 15,750.00 380,250.00

HARGA SATUAN BAHAN UPAH JUMLAH

Rp Rp Rp Rp

1 3 4 5 6 7

8 1 M3 Pasang pondasi batu kali 1 Pc : 4 Ps

1.200 m3 Batu Kali 150,000.00 180,000.00 163.000 kg Semen Portland ( 50 Kg ) 1,200.00 195,600.00 0.520 m3 Pasir Pasang 170,000.00 88,400.00 1.500 Oh Pekerja 50,000.00 75,000.00 0.600 Oh TukangBatu 60,000.00 36,000.00 0.060 Oh Kepala Tukang 70,000.00 4,200.00 0.075 Oh Mandor 75,000.00 5,625.00 Jumlah 464,000.00 120,825.00 584,825.00

9 1 M3 Pasang pondasi batu kosong ( aanstamping batu kali )

1.200 m3 Batu Kali 150,000.00 180,000.00 0.432 m3 Pasir Urug 175,000.00 75,600.00 0.780 Oh Pekerja 50,000.00 39,000.00 0.390 Oh TukangBatu 60,000.00 23,400.00 0.039 Oh Kepala Tukang 70,000.00 2,730.00 0.039 Oh Mandor 75,000.00 2,925.00 Jumlah 255,600.00 68,055.00 323,655.00

10 1 M2 Pasangan bata merah tebal 1/2 bata, 1Pc:2Ps

70.000 Bh Bata Merah 5x11x22 cm 800.00 56,000.00 18.950 kg Semen Portland ( 50 Kg ) 1,200.00 22,740.00 0.038 m3 Pasir Pasangan 170,000.00 6,460.00 0.300 Oh Pekerja 50,000.00 15,000.00 0.100 Oh TukangBatu 60,000.00 6,000.00 0.010 Oh KepalaTukang 70,000.00 700.00 0.015 Oh Mandor 75,000.00 1,125.00 Jumlah 85,200.00 22,825.00 108,025.00

11 1 M2 Pasangan bata merah tebal 1/2 bata, 1Pc:4Ps

70.000 Bh Bata Merah 5x11x22 cm 800.00 56,000.00 11.500 kg Semen Portland ( 50 Kg ) 1,200.00 13,800.00 0.043 m3 Pasir Pasangan 170,000.00 7,310.00 0.300 Oh Pekerja 50,000.00 15,000.00 0.100 Oh TukangBatu 60,000.00 6,000.00 0.010 Oh KepalaTukang 70,000.00 700.00 0.015 Oh Mandor 75,000.00 1,125.00 Jumlah 77,110.00 22,825.00 99,935.00

ANALISA HARGA SATUAN PEKERJAAN

2

BANGUNAN GEDUNG DAN PERUMAHAN DAFTAR ANALISA BIAYA KONSTRUKSI ( ABK )

NO URAIAN KETERANGAN

NO URAIAN KETERANGAN

2

PEKERJAAN PERSI APAN 

PEKERJAAN TANA H , SNI DT-91-0006-2007 

DAFTAR ANALISA BIAYA KONSTRUKSI ( ABK ) BANGUNAN GEDUNG DAN PERUMAHAN

PEKERJAAN PONDASI, SNI DT - 91 - 0007 - 2007 

(10)

12 1 M2 Plesteran 1 Pc:2Ps, tebal 15 mm 10.224 kg Semen Portland ( 50 Kg ) 1,200.00 12,268.80 0.020 m3 Pasir Pasangan 170,000.00 3,400.00 0.200 Oh Pekerja 50,000.00 10,000.00 0.150 Oh TukangBatu 60,000.00 9,000.00 0.015 Oh Kepala Tukang 70,000.00 1,050.00 0.010 Oh Mandor 75,000.00 750.00 Jumlah 15,668.80 20,800.00 36,468.80

HARGA SATUAN BAHAN UPAH JUMLAH

Rp Rp Rp Rp 1 3 4 5 6 7 13 1 M2 Plesteran 1 Pc:4Ps, tebal 15 mm 6.240 kg Semen Portland ( 50 Kg ) 1,200.00 7,488.00 0.024 m3 Pasir Pasang 170,000.00 4,080.00 0.200 Oh Pekerja 50,000.00 10,000.00 0.150 Oh TukangBatu 60,000.00 9,000.00 0.015 Oh Kepala Tukang 70,000.00 1,050.00 0.010 Oh Mandor 75,000.00 750.00 Jumlah 11,568.00 20,800.00 32,368.00

14 1 M2 Plesteran Beton 1Pc:2Ps, tebal 15 mm

9.300 kg Semen Portland ( 50 Kg ) 1,200.00 11,160.00 0.018 m3 Pasir Pasang 170,000.00 3,060.00 0.260 Oh Pekerja 50,000.00 13,000.00 0.200 Oh TukangBatu 60,000.00 12,000.00 0.020 Oh Kepala Tukang 70,000.00 1,400.00 0.013 Oh Mandor 75,000.00 975.00 Jumlah 14,220.00 27,375.00 41,595.00 15 1 M2 Pasang acian 3.250 kg Semen Portland ( 50 Kg ) 1,200.00 3,900.00 0.150 Oh Pekerja 50,000.00 7,500.00 0.100 Oh TukangBatu 60,000.00 6,000.00 0.010 Oh KepalaTukang 70,000.00 700.00 0.008 Oh Mandor 75,000.00 600.00 Jumlah 3,900.00 14,800.00 18,700.00

16 1 M3 Pasang kosen pintu dan jendela kayu Banio

1.100 m3 Kayu Balok Banio 5,000,000.00 5,500,000.00

1.250 kg Paku 10 cm 18,000.00 22,500.00 1.000 kg Lem Kayu 17,000.00 17,000.00 6.000 Oh Pekerja 50,000.00 300,000.00 20.000 Oh Tukang Kayu 60,000.00 1,200,000.00 2.000 Oh Kepala Tukang 70,000.00 140,000.00 0.300 Oh Mandor 75,000.00 22,500.00 Jumlah 5,539,500.00 1,662,500.00 7,202,000.00

17 1 M2 Pasang pintu panel kayu kelas I

0.040 m3 Kayu Balok Banio 5,000,000.00 200,000.00

0.500 kg Lem Kayu 18,000.00 9,000.00 1.000 Oh Pekerja 50,000.00 50,000.00 2.500 Oh Tukang Kayu 60,000.00 150,000.00 0.250 Oh Kepala Tukang 70,000.00 17,500.00 0.050 Oh Mandor 75,000.00 3,750.00 Jumlah 209,000.00 221,250.00 430,250.00

HARGA SATUAN BAHAN UPAH JUMLAH

Rp Rp Rp Rp

1 3 4 5 6 7

18 1 M2 Pasang pintu dan jendela kaca kayu kelas I

0.024 m3 Kayu Papan kelas I 5,000,000.00 120,000.00

0.300 kg Lem Kayu 17,000.00 5,100.00 0.800 Oh Pekerja 50,000.00 40,000.00 2.000 Oh Tukang Kayu 60,000.00 120,000.00 0.200 Oh Kepala Tukang 70,000.00 14,000.00 0.040 Oh Mandor 75,000.00 3,000.00 Jumlah 125,100.00 177,000.00 302,100.00

19 1 M2 Pasang jalusi kosen kayu kelas I

0.060 m3 Kayu Papan kelas I 5,000,000.00 300,000.00

0.150 kg Paku biasa 1/2" - 1" 18,000.00 2,700.00 0.500 Oh Pekerja 50,000.00 25,000.00 1.000 Oh TukangKayu 60,000.00 60,000.00 0.100 Oh Kepala Tukang 70,000.00 7,000.00 0.030 Oh Mandor 75,000.00 2,250.00 Jumlah 302,700.00 94,250.00 396,950.00

20 1 M3 Pasang konstruksi kuda kuda kayu Kelas I

1.100 m3 Kayu kelas I balok 5,000,000.00 5,500,000.00

15.000 kg Besi strip 5,700.00 85,500.00 5.600 kg Paku biasa 2" - 5" 18,000.00 100,800.00 4.000 Oh Pekerja 50,000.00 200,000.00 12.000 Oh Tukang Kayu 60,000.00 720,000.00 1.200 Oh Kepala Tukang 70,000.00 84,000.00 0.200 Oh Mandor 75,000.00 15,000.00 Jumlah 5,686,300.00 1,019,000.00 6,705,300.00

21 1 M2 Pasang rangka langit-langit ( 60x60 ) cm kayu

0.0163 m3 Kayu kelas II balok 5,000,000.00 81,500.00

0.250 kg Paku biasa 18,000.00 4,500.00 0.200 Oh Pekerja 50,000.00 10,000.00 0.300 Oh TukangKayu 60,000.00 18,000.00 0.030 Oh Kepala Tukang 70,000.00 2,100.00 0.010 Oh Mandor 75,000.00 750.00 Jumlah 86,000.00 30,850.00 116,850.00 NO URAIAN KETERANGAN 2 KETERANGAN 2 NO URAIAN

PEKERJAA N PL ESTERAN, SNI DT -91-000-2007 

DAFTAR ANALISA BIAYA KONSTRUKSI ( ABK ) BANGUNAN GEDUNG DAN PERUMAHAN

PEKERJAA N KA YU, SNI DT -91-0011-2007 

DAFTAR ANALISA BIAYA KONSTRUKSI ( ABK ) BANGUNAN GEDUNG DAN PERUMAHAN

(11)

22 1 M2 Pasang listplank ukuran 2x(2x20) cm kayu kelas II SNI - '02

0.009 m3 Kayu kelas II balok 5,000,000.00 45,000.00

0.060 kg Paku biasa 2" - 5" 18,000.00 1,080.00 0.100 Oh Pekerja 50,000.00 5,000.00 0.100 Oh TukangKayu 60,000.00 6,000.00 0.010 Oh KepalaTukang 70,000.00 700.00 0.050 Oh Mandor 75,000.00 3,750.00 Jumlah 46,080.00 15,450.00 61,530.00

23 1 M2 Pasang list kayu profil

1.050 m1 Kayu profil 16,800.00 17,640.00 0.021 Oh Pekerja 50,000.00 1,050.00 0.021 Oh TukangKayu 60,000.00 1,260.00 0.002 Oh KepalaTukang 70,000.00 140.00 0.001 Oh Mandor 75,000.00 75.00 Jumlah 17,640.00 2,525.00 20,165.00

HARGA SATUAN BAHAN UPAH JUMLAH

Rp Rp Rp Rp

1 3 4 5 6 7

24 1 bh Pasang bak kontrol batu bata 60x60x65

0.371 m3 Batu bata 702,479.00 260,619.71

2.280 zak Semen Portland 60,000.00 136,800.00

0.184 m3 Pasir pasang 170,000.00 31,280.00 0.033 m3 Batu kerikil 200,000.00 6,600.00 4.850 kg Besi beton 12,500.00 60,625.00 0.120 m3 Pasir beton 170,000.00 20,400.00 2.160 Oh Pekerja 50,000.00 108,000.00 0.720 Oh TukangBatu 60,000.00 43,200.00 0.072 Oh Kepala Tukang 70,000.00 5,040.00 0.100 Oh TukangGali 60,000.00 6,000.00 0.108 Oh Mandor 75,000.00 8,100.00 Jumlah 516,324.71 170,340.00 686,664.71

25 1M' Pasan g pipa PVC dia 2"

1.200 m' Pipa PVC 4" 15,000.00 18,000.00

0.350 hrg pipa Perlengkapan = 35% harga pipa 5,250.00 1,837.50

0.081 Oh Pekerja 50,000.00 4,050.00

0.135 Oh TukangBatu 60,000.00 8,100.00

0.0135 Oh KepalaTukang 70,000.00 945.00

0.0041 Oh Mandor 75,000.00 307.50

Jumlah 19,837.50 13,402.50 33,240.00

26 1M' Pasan g pipa PVC dia 6"

1.200 m' Pipa PVC 6" 84,000.00 100,800.00

0.350 hrg pipa Perlengkapan = 35% harga pipa 29,400.00 10,290.00

0.081 Oh Pekerja 50,000.00 4,050.00

0.135 Oh TukangBatu 60,000.00 8,100.00

0.0135 Oh KepalaTukang 70,000.00 945.00

0.0041 Oh Mandor 75,000.00 307.50

Jumlah 111,090.00 13,402.50 124,492.50

27 Analisa Pasangan Perabun g atap sen g /10M

2.000 lbr Seng plat 91,000.00 182,000.00 0.040 kg Pakuatap 22,000.00 880.00 2.500 Oh Pekerja 50,000.00 125,000.00 0.025 Oh TukangKayu 60,000.00 1,500.00 0.003 Oh KepalaTukang 70,000.00 210.00 0.006 Oh Mandor 75,000.00 450.00 Jumlah 182,880.00 127,160.00 310,040.00 Untuk 1 M 31,004.00

28 1M2 Pasan g atap sen g war na

0.700 lbr Seng Gelombang 73,200.00 51,240.00 0.020 kg Pakuseng 22,000.00 440.00 0.120 Oh Pekerja 50,000.00 6,000.00 0.060 Oh TukangKayu 60,000.00 3,600.00 0.0060 Oh KepalaTukang 70,000.00 420.00 0.0060 Oh Mandor 75,000.00 450.00 Jumlah 51,680.00 10,470.00 62,150.00

HARGA SATUAN BAHAN UPAH JUMLAH

Rp Rp Rp Rp

1 3 4 5 6 7

29 1M' Peker jaan Papan Ruiter  

0.300 Oh Tukang Kayu 60,000.00 18,000.00

0.030 Oh Kepala Tukang 70,000.00 2,100.00

1.000 m' Kayu Papan 4,000,000.00 4,000,000.00

0.025 kg Pakubesi 35,000.00 875.00

Jumlah 20,100.00 4,000,875.00 4,020,975.00

30 1M2 Langit-langit triplek 4 mm + rangka kayu Kls I

0.023 m3 Kayu kelas I balok 5,000,000.00 115,000.00

0.060 Kg Paku biasa 18,000.00 1,080.00 0.390 Lbr Triplek t 4 mm 60,000.00 23,400.00 0.270 Oh Pekerja 50,000.00 13,500.00 0.400 Oh TukangKayu 60,000.00 24,000.00 0.040 Oh Kepala Tukang 70,000.00 2,800.00 0.014 Oh Mandor 75,000.00 1,050.00 Jumlah 139,480.00 41,350.00 180,830.00 2

DAFTAR ANALISA BIAYA KONSTRUKSI ( ABK ) BANGUNAN GEDUNG DAN PERUMAHAN

NO URAIAN KETERANGAN

PEKERJAAN PENUTUP ATAP 

DAFTAR ANALISA BIAYA KONSTRUKSI ( ABK ) BANGUNAN GEDUNG DAN PERUMAHAN

PEKERJAAN SANITA SI 

NO URAIAN KETERANGAN

2

(12)

31 1 BH Pasang kunci tanam biasa

1.000 Bh Kunci tanam setara Ciga Brown 5404 111,500.00 111,500.00

0.010 Oh Pekerja 50,000.00 500.00

0.500 Oh TukangKayu 60,000.00 30,000.00

0.010 Oh KepalaTukang 70,000.00 700.00

0.005 Oh Mandor 75,000.00 375.00

Jumlah 111,500.00 31,575.00 143,075.00

32 1 M2 Pasang kaca reyben t 5 mm

1.100 M2 Kaca reyben tebal 5 mm 132,500.00 145,750.00

0.015 Oh Pekerja 50,000.00 750.00

0.150 Oh TukangKayu 60,000.00 9,000.00

0.015 Oh Kepala Tukang 70,000.00 1,050.00

0.001 Oh Mandor 75,000.00 75.00

Jumlah 145,750.00 10,875.00 156,625.00

33 1 M2 Pasang kaca bening t 5 mm

1.100 M2 Kaca tebal 5 mm 132,500.00 145,750.00 0.015 Oh Pekerja 50,000.00 750.00 0.150 Oh TukangKayu 60,000.00 9,000.00 0.015 Oh Kepala Tukang 70,000.00 1,050.00 0.007 Oh Mandor 75,000.00 525.00 Jumlah 145,750.00 11,325.00 157,075.00

HARGA SATUAN BAHAN UPAH JUMLAH

Rp Rp Rp Rp

1 3 4 5 6 7

34 1M2 Pengecatan Bidang kayu baru ( 1 plamir, 1 cat dasar, 2 cat penutup )

0.200 kg Cat menie 41,000.00 8,200.00

0.150 kg Plamir 19,500.00 2,925.00

0.170 kg Cat Dasar 19,500.00 3,315.00

0.260 kg Cat penutup setara platoon 40,300.00 10,478.00

0.070 Oh Pekerja 50,000.00 3,500.00

0.009 Oh TukangCat 60,000.00 540.00

0.006 Oh KepalaTukang 70,000.00 420.00

0.0025 Oh Mandor 75,000.00 187.50

Jumlah 24,918.00 4,647.50 29,565.50

35 1M2 Pelaburan bidang kayu dengan cat residu/ter 

0.350 Ltr Residu/ter 13,400.00 4,690.00

0.100 Oh Pekerja 50,000.00 5,000.00

0.006 Oh Mandor 75,000.00 450.00

Jumlah 4,690.00 5,450.00 10,140.00

36 1M2 Pelaburan bidang kayu dengan cat menie

0.350 Ltr Menie 41,000.00 14,350.00

0.100 Oh Pekerja 50,000.00 5,000.00

0.006 Oh Mandor 75,000.00 450.00

Jumlah 14,350.00 5,450.00 19,800.00

37 1M2 Pengecatan tembok baru ( 1 plamir, 1 cat dasar, 2 cat penutup )

0.1000 kg Plamir 19,500.00 1,950.00

0.1000 kg Cat Dasar 19,500.00 1,950.00

0.2600 kg Cat penutup matex 46,000.00 11,960.00

0.0200 Oh Pekerja 50,000.00 1,000.00

0.0630 Oh TukangCat 60,000.00 3,780.00

0.0063 Oh KepalaTukang 70,000.00 441.00

0.0025 Oh Mandor 75,000.00 187.50

Jumlah 15,860.00 5,408.50 21,268.50

38 1M2 Pengecatan plafond ( 1 plamir, 1 cat dasar, 2 cat penutup )

0.100 kg Plamir 19,500.00 1,950.00

0.100 kg Cat Dasar 19,500.00 1,950.00

0.260 kg Cat penutup matex 46,000.00 11,960.00

0.028 Oh Pekerja 50,000.00 1,400.00

0.042 Oh TukangCat 60,000.00 2,520.00

0.004 Oh KepalaTukang 70,000.00 280.00

0.003 Oh Mandor 75,000.00 225.00

Jumlah 15,860.00 4,425.00 20,285.00

39 1M2 Pasang terali besi strip 2x3 mm

6.177 kg Besi strip 5,700.00 35,208.90 27.080 cm Pengelasan 35,000.00 947,800.00 1.670 Oh Pekerja 50,000.00 83,500.00 1.670 Oh Tukang Besi 60,000.00 100,200.00 0.167 Oh Kepala Tukang 70,000.00 11,690.00 0.083 Oh Mandor 75,000.00 6,225.00 Jumlah 983,008.90 201,615.00 1,184,623.90

HARGA SATUAN BAHAN UPAH JUMLAH

Rp Rp Rp Rp

1 3 4 5 6 7

40 1M3 Pekerjaan Beton Tumbuk 1 : 3 : 5 SNI - '02

218.000 kg Semen portland 1,200.00 261,600.00 0.520 m3 Pasir beton 170,000.00 88,400.00 0.870 m3 Kerikil beton 200,000.00 174,000.00 1.650 Oh Pekerja 50,000.00 82,500.00 0.250 Oh TukangBatu 60,000.00 15,000.00 0.025 Oh Kepala Tukang 70,000.00 1,750.00 0.0800 Oh Mandor 75,000.00 6,000.00 Jumlah 524,000.00 105,250.00 629,250.00 NO KETERANGAN

PEKERJAAN KUNCI DAN KACA

DAFTAR ANALISA BIAYA KONSTRUKSI ( ABK ) BANGUNAN GEDUNG DAN PERUMAHAN

NO URAIAN KETERANGAN

2

PEKERJAA N PENGECATA N, SK - SNI 2001 

PEKERJAAN BESI DAN ALUM UNIUM 

DAFTAR ANALISA BIAYA KONSTRUKSI ( ABK ) BANGUNAN GEDUNG DAN PERUMAHAN

URAIAN 2

(13)

41 1M3 Pekerjaan Beton Tumbuk 1 : 2 : 3 SNI - '02 232.000 kg Semen portland ( 50 kg ) 1,200.00 278,400.00 0.520 m3 Pasir beton 170,000.00 88,400.00 0.780 m3 Kerikil beton 200,000.00 156,000.00 1.650 Oh Pekerja 50,000.00 82,500.00 0.250 Oh TukangBatu 60,000.00 15,000.00 0.025 Oh Kepala Tukang 70,000.00 1,750.00 0.0800 Oh Mandor 75,000.00 6,000.00 Jumlah 522,800.00 105,250.00 628,050.00

42 1M3 Pekerjaan Beton fc' = 19.3 Mpa w/c = 0.58 K-225 slump 12+2 cm

371.000 kg Semen portland ( 50 kg ) 1,200.00 445,200.00 698.000 kg Pasir beton 1,000.00 698,000.00 1,047.000 kg Kerikil beton 180.00 188,460.00 215.000 ltr Air 2,500.00 537,500.00 1.650 Oh Pekerja 50,000.00 82,500.00 0.275 Oh TukangBatu 60,000.00 16,500.00 0.028 Oh Kepala Tukang 70,000.00 1,960.00 0.083 Oh Mandor 75,000.00 Jumlah 1,331, 660.00 638,460. 00 1,970,120.00

43 1 kg Pembesian dengan besi polos atau ulir 

10.500 kg Besi beton polos 12,500.00 131,250.00

0.150 kg Kawat beton 14,000.00 2,100.00 0.070 Oh Pekerja 50,000.00 3,500.00 0.070 Oh TukangBesi 60,000.00 4,200.00 0.007 Oh KepalaTukang 70,000.00 490.00 0.004 Oh Mandor 75,000.00 300.00 Jumlah 10 kg 133,350.00 8,490.00 141,840.00 Jumlah 1 kg 14,184.00

44 1 M2 Pasang Bekisting untuk pondasi

0.045 m3 Kayu terentang/perancah 1,000,000.00 45,000.00 0.300 kg Paku biasa 18,000.00 5,400.00 0.100 ltr Minyak bekisting 18,000.00 1,800.00 0.300 Oh Pekerja 50,000.00 15,000.00 0.260 Oh TukangKayu 60,000.00 15,600.00 0.026 Oh Kepala Tukang 70,000.00 1,820.00 0.005 Oh Mandor 75,000.00 375.00 Jumlah 52,200.00 32,795.00 84,995.00

45 1 M2 Pasang Bekisting untuk kolom

0.040 m3 Kayu terentang/perancah 1,000,000.00 40,000.00

0.400 kg Paku biasa 18,000.00 7,200.00

0.200 ltr Minyak bekisting 18,000.00 3,600.00

0.015 m3 Balok kayu kelas III 4,000,000.00 60,000.00

0.350 lbr Plywood 9 mm 135,000.00 47,250.00

2.000 btg Dolken kayu dia. 8 - 10 100,000.00 200,000.00

0.660 Oh Pekerja 50,000.00 33,000.00

0.330 Oh TukangKayu 60,000.00 19,800.00

0.033 Oh Kepala Tukang 70,000.00 2,310.00

0.033 Oh Mandor 75,000.00 2,475.00

Jumlah 358,050.00 57,585.00 415,635.00

HARGA SATUAN BAHAN UPAH JUMLAH

Rp Rp Rp Rp

1 3 4 5 6 7

46 1 M2 Pasang Bekisting untuk balok 

0.040 m3 Kayu terentang/perancah 1,000,000.00 40,000.00

0.400 kg Paku biasa 18,000.00 7,200.00

0.200 ltr Minyak bekisting 18,000.00 3,600.00

0.018 m3 Balok kayu kelas III 4,000,000.00 72,000.00

0.350 lbr Plywood 9 mm 135,000.00 47,250.00

2.000 btg Dolken kayu dia. 8 - 10 100,000.00 200,000.00

0.660 Oh Pekerja 50,000.00 33,000.00

0.330 Oh TukangKayu 60,000.00 19,800.00

0.033 Oh Kepala Tukang 70,000.00 2,310.00

0.033 Oh Mandor 75,000.00 2,475.00

Jumlah 370,050.00 57,585.00 427,635.00

47 1 M2 Pasang Bekisting untuk lantai

0.040 m3 Kayu terentang/perancah 1,000,000.00 40,000.00

0.400 kg Paku biasa 18,000.00 7,200.00

0.200 ltr Minyak bekisting 18,000.00 3,600.00

0.015 m3 Balok kayu kelas III 4,000,000.00 60,000.00

0.350 lbr Plywood 9 mm 135,000.00 47,250.00

6.000 btg Dolken kayu dia. 8 - 10 100,000.00 600,000.00

0.660 Oh Pekerja 50,000.00 33,000.00

0.330 Oh TukangKayu 60,000.00 19,800.00

0.033 Oh Kepala Tukang 70,000.00 2,310.00

0.033 Oh Mandor 75,000.00 2,475.00

Jumlah 758,050.00 57,585.00 815,635.00

48 1 M2 Pasang Bekisting untuk dinding beton

0.030 m3 Kayu terentang/perancah 1,000,000.00 30,000.00

0.400 kg Paku biasa 18,000.00 7,200.00

0.200 ltr Minyak bekisting 18,000.00 3,600.00

0.020 m3 Balok kayu 4,000,000.00 80,000.00

0.350 lbr Plywood 9 mm 135,000.00 47,250.00

3.000 btg Dolken kayu dia. 8 - 10 100,000.00 300,000.00

4.000 bh Formtie/penjaga jarak bekisting/spacer 12,000.00 48,000.00

0.660 Oh Pekerja 50,000.00 33,000.00

0.330 Oh TukangKayu 60,000.00 19,800.00

0.033 Oh Kepala Tukang 70,000.00 2,310.00

0.033 Oh Mandor 75,000.00

Jumlah 468, 050.00 103,110. 00 571,160.00

BANGUNAN GEDUNG DAN PERUMAHAN

NO URAIAN KETERANGAN

DAFTAR ANALISA BIAYA KONSTRUKSI ( ABK )

(14)

49 1 M' Ring balok Late Beton Bertulang ( 10x15 )

0.003 m3 Kayu kelas III 1,000,000.00 3,000.00

0.020 kg Paku biasa 18,000.00 360.00

3.600 kg Besi beton 18,000.00 64,800.00

0.050 kg Kawat beton 14,000.00 700.00

0.110 Zak Semen portland ( 50 kg ) 60,000.00 6,600.00

0.009 m3 Pasir beton 170,000.00 1,530.00 0.015 m3 Kerikil beton 200,000.00 3,000.00 0.297 Oh Pekerja 50,000.00 14,850.00 0.033 Oh Tukang Batu 60,000.00 1,980.00 0.033 Oh TukangKayu 60,000.00 1,980.00 0.033 Oh TukangBesi 60,000.00 1,980.00 0.010 Oh KepalaTukang 70,000.00 700.00 0.015 Oh Mandor 75,000.00 1,125.00 Jumlah 79,990.00 22,615.00 102,605.00

HARGA SATUAN BAHAN UPAH JUMLAH

Rp Rp Rp Rp

1 3 4 5 6 7

50 1 M3 Pekerjaan Sloof beton 15/20 ( Tul.4 12 Skg 8 - 150 )

1.000 m3 Analisa Beton K225 1,970,120.00 1,970,120.00

5.000 m2 Analisa cetakan sloof 427,635.00 2,138,175.00

130.141 kg Analisa besi beton 14,184.00 1,845,919.94

Jumlah 5,954,214.94

51 1 M3 Pekerjaan Sloof beton 20/40 ( Tul.8 12 Skg 8 - 200 )

1.000 m3 Analisa Beton K225 1,970,120.00 1.000 1,970,120.00

6.667 m2 Analisa cetakan sloof 427,635.00 5.000 2,851,042.55

164.943 kg Analisa besi beton 14,184.00 130.141 2,339,551.51

Jumlah 7,160,714.06

52 1 M3 Pekerjaan kolom beton 20/20 ( Tul.6 12 Skg 8 - 150 )

1.000 m3 Analisa Beton K225 1,970,120.00 1,970,120.00

10.000 m2 Analisa cetakan kolom 415,635.00 4,156,350.00

182.459 kg Analisa besi beton 14,184.00 2,587,998.46

Jumlah 8,714,468.46

53 1 M3 Pekerjaan kolom praktis beton 13x13 cm ( Tul.4 12 Skg 8 - 150 )

1.000 m3 Analisa Beton K225 1,970,120.00 1,970,120.00

7.050 m2 Analisa cetakan kolom 415,635.00 2,930,226.75

281.837 kg Analisa besi beton 14,184.00 3,997,576.01

Jumlah 8,897,922.76

54 1 M3 Pekerjaan ring balok beton 15x20 cm ( Tul.4 12 Skg 8 - 150 )

1.000 m3 Analisa Beton K225 1,970,120.00 1,970,120.00

6.667 m2 Analisa cetakan balok 102,605.00 684,067.54

171.347 kg Analisa besi beton 14,184.00 2,430,385.85

Jumlah 5,084,573.38

55 1 M3 Pekerjaan plat beton tebal 12 cm ( Tul. 12 )

1.000 m3 Analisa Beton K225 1,970,120.00 1,970,120.00

1.250 m2 Analisa cetakan plat beton 815,635.00 1,019,543.75

147.740 kg Analisa besi beton 14,184.00 2,095,544.16

Jumlah 5,085,207.91

56 1 M3 Pekerjaan lantai beton tebal 12 cm ( Tul. 12 )

1.000 m3 Analisa Beton 1:2:3 1,970,120.00 1,970,120.00

1.250 m2 Analisa cetakan plat beton 815,635.00 1,019,543.75

148.333 kg Analisa besi beton 14,184.00 2,103,955.27

Jumlah 5,093,619.02

57 1 M3 Pekerjaan dinding beton bak air tebal 12 cm ( Tul. 12 )

1.000 m3 Analisa Beton K225 1,970,120.00 1,970,120.00

1.250 m2 Analisa cetakan dinding beton 571,160.00 713,950.00

148.333 kg Analisa besi beton 14,184.00 2,103,955.27

Jumlah 4,788,025.27

58 1 M3 Pekerjaan pondasi incenerator plat beton ( Tul. 10 )

1.000 m3 Analisa Beton K225 1,970,120.00 1,970,120.00

3.264 m2 Analisa cetakan dinding beton 571,160.00 1,864,266.24

56.238 kg Analisa besi beton 14,184.00 797,679.79

Jumlah 4,632,066.03

59 1M2 Memasang lantai keramik ukuran ( 30x30 ) cm

11.870 Bh Keramik ( 30x30 ) 5,500.00 65,285.00 10.000 kg Semen 1,200.00 12,000.00 0.045 m3 Pasir pasang 170,000.00 7,650.00 1.500 kg Semenwarna 2,770.00 4,155.00 0.700 Oh Pekerja 50,000.00 35,000.00 0.350 Oh TukangBatu 60,000.00 21,000.00 0.035 Oh Kepala Tukang 70,000.00 2,450.00 0.035 Oh Mandor 75,000.00 Jumlah 84,935.00 62,605.00 147,540.00

60 1 KG Pekerjaan pembesian ( besi profil )

1.150 kg Besi Profil 8,500.00 9,775.00

0.200 kg Elektroda ( 20 % ) 5,000.00 1,000.00

0.060 Oh Pekerja 50,000.00 3,000.00

0.060 Oh TukangBesi 60,000.00 3,600.00

0.006 Oh Kepala Tukang Besi 70,000.00 420.00

0.003 Oh Mandor 75,000.00

Jumlah 10,775.00 7,020.00 17,795.00

61 1 KG Pekerjaan pembesian ( besi siku )

1.150 kg Besi Siku 9,000.00 10,350.00

0.200 kg Elektroda ( 20 % ) 5,000.00 1,000.00

0.060 Oh Pekerja 50,000.00 3,000.00

0.060 Oh TukangBesi 60,000.00 3,600.00

0.006 Oh Kepala Tukang Besi 70,000.00 420.00

0.003 Oh Mandor 75,000.00 225 Jumlah 11,350.00 7,020.00 18,370.00 #REF! #REF! #REF! #REF! URAIAN KETERANGAN 2

DAFT AR ANALI SA BETON BERTULANG ( SLOOF, KOLOM, BAL OK, PLAT ) 

DAFTAR ANALISA BIAYA KONSTRUKSI ( ABK ) BANGUNAN GEDUNG DAN PERUMAHAN

(15)

PEKERJAAN

: LANJUTAN PEMBANGUNAN GEDUNG CARDIAC CENTER : PEMBANGUNAN INSTALASI PENGOLAHAN

AIR LIMBAH ( IPAL ) DAN PEMUSNAH SAMPAH MEDIS RUMAH SAKIT ( INCENERATOR )

LOKASI

: RSUD PROF Dr R. D. KANDOU ( SULUT )

TAHUN ANGGARAN : 2013

HARGA SATUAN

(Rp)

1 2 3 4 5

PEKERJAAN PERSIAPAN

1

Pekerjaan

Pembersihan

Lapangan

Ls

8,750.00

A.1

2

Pasangan

bowplank

tiap-tiap

1

m

M'

54,300.00

A.2

PEKERJAAN TANAH

1

Pekerjaan

galian

tanah

biasa

M3

39,375.00

B.1

2

Pekerjaan

galian

tanah

dalam

2

m

M3

48,375.00

B.2

3

Upah

urugan

kembali

M3

13,100.00

B.3

4

Pekerjaan

pemadatan

tanah

M3

13,100.00

B.4

5

Pekerjaan

timbunan

pasir

urug

M3

225,750.00

B.5

6

Pekerjaan

urugan

tanah

M3

195,750.00

B.6

7

Pekerjaan

urugan

sirtu

M3

380,250.00

B.7

PEKERJAAN PONDASI

1

Pasangan

pondasi

batu

kalin1pc:4ps

M3

584,825.00

C.1

2

Analisa

pasangan

pondasi

astamping

batu

kali/M3

M3

323,655.00

C.2

3

Pek

pondasi

plat

beton

bertulang

besi

150

kg/m3

M3

4,632,066.03

C.3

PEKERJAAN DINDING

1

Pasangan

bata

merah

tebal

1/2

bata

1pc:2ps

M2

108,025.00

D.1

2

Pasangan

bata

merah

tebal

1/2

bata

1pc:4ps

M2

99,935.00

D.2

PEKERJAAN PLESTER 

1

Plester

1pc:2ps,tebal

15

mm

M2

36,468.80

E.1

2

Plester

1pc:4ps,tebal

15

mm

M2

32,368.00

E.2

3

Plesteran

beton

1pc:2ps,tebal

15

mm

M2

41,595.00

E.3

4

Pek

acian

M2

18,700.00

E.4

PEKERJAAN KAYU

1

Pasang

konstruksi

kuda-kuda

kayu

kls

I

+

gording

M3

6,705,300.00

F.1

2

Pas

kozen

kayu

pintu

dan

jendela

kayu

kls

I

M3

7,202,000.00

F.2

3

Pasang

rangka

langit

langit

(60x60)

kayu

kelas

II

M2

116,850.00

F.3

4

Pasang

listplank

kayu

20x20

kayu

kls

I

M2

61,530.00

F.4

PEKERJAAN BETON

1

Membuat

beton

tumbuk

1pc:3ps:5kr

M3

629,250.00

G.1

2

Membuat

lantai

kerja

beton

tumbuk

1pc:3ps:5kr

M3

629,250.00

G.2

3

Pek

beton

1pc:2ps:3Kr

M3

628,050.00

G.3

4

Pek

beton

K225

M3

1,970,120.00

G.4

5

Pembesian

dgn

besi

polos

atau

ulir

kg

14,184.00

G.5

6

Pekerjaan

pondasi

reaktor

IPAL

M3

4,788,025.27

G.6

7

Pekerjaan

sloof

15/20

beton

bertulang

M3

5,954,214.94

G.7

8

Pekerjaan

sloof

20/40

beton

bertulang

M3

7,160,714.06

G.8

9

Pekerjaan

kolom

20x20

beton

bertulang

M3

8,714,468.46

G.9

10

Pekerjaan

plat

lantai

beton

bertulang

M3

5,085,207.91

G.10

11

Membuat balok pinggang ( Late ) beton bertulang ( 15x15 ) cm

M'

5,084,573.38

G.11

12

Pek

kolom

praktis

13x13

M'

8,897,922.76

G.12

13

Pek

dinding

beton

tebal

12

cm

M3

4,788,025.27

G.13

14

Pek

lantai

beton

bertulang

tebal

12

cm

M3

5,093,619.02

G.14

15

Pekerjaan

pemasangan

keramik

(

30x30

)

cm

M2

147,540.00

G.15

PEKERJAAN PENUTUP ATAP

1

Pasangan

atap

seng

warna

M2

62,150.00

H.1

2

Pasangan

perabung

seng

M'

31,004.00

H.2

3

Pas

bola

bola

atap

metal

(

terpasang

)

M'

65,000.00

H.3

PEKERJAAN LANGIT LANGIT

1

Pas loteng

triplek 4 mm

( uk 60x120 cm) + rangka kayu

kls II

M2

180,830.00

J.1

2

List

plafond

dari

kayu

/

M'

M'

20,165.00

J.2

KET

DAFTAR HARGA SATUAN PEKERJAAN

(16)

PEKERJAAN KUNCI DAN KACA

1

Pasang

kunci

tanam

antik/Bh

Bh

250,000.00

L.1

2

Pasang

engsel

pintu/Bh

Bh

11,500.00

L.3

3

Pasang

engsel

jendela/Bh

Bh

6,500.00

L.4

4

Pasang

grendel

jendela

Bh

8,900.00

L.5

5

Pasang

kait

angin

Bh

8,900.00

L.6

6

Pasang

tangan

tangan

jendela

Bh

50,000.00

L.7

PEKERJAAN PENGECATAN

1

Pengecatan

bidang

dinding

baru

cat

tembok

3

kali

cat/M2

M2

21,268.50

M.1

2

Pengecatan

plafon

dengan

cat

matex

M2

20,285.00

M.2

3

Pengecatan

kayu

baru

dengan

cat

setara

platoon

M2

29,565.50

M.3

4

Pekerjaan

meni

kayu

19,800.00

M.4

5

Pekerjaan

residu

10,140.00

M.5

PEKERJAAN MEKANIKAL

1

Pas

jaringan

instalasi

listrik

ttk

150,000.00

N.1

2

Pas

instalasi

stop

kontak

Bh

50,000.00

N.2

3

Pas

lampu

down

18

watt

Bh

25,000.00

N.3

4

Pas

saklar

tunggal

setara

clipsal

Bh

30,000.00

N.4

5

Pas

stop

kontak

setara

clipsal

Bh

35,000.00

N.5

6

Pas

pipa

PVC

6"

M'

124,492.50

N.6

7

Pas

pipa

PVC

2"

M'

33,240.00

N.7

8

Pekerjaan

Besi

Profil

kg

17,795.00

N.8

9

Pekerjaan

Besi

Siku

kg

18,370.00

N.9

#REF!

#REF!

#REF!

#REF!

(17)

PEKERJAAN : LANJUTAN PEMBANGUNAN GEDUNG CARDIAC CENTER : PEMBANGUNAN INSTALASI PENGOLAHAN AIR LIMBAH

( IPAL ) DAN PEMUSNAH SAMPAH MEDIS RUMAH SAKIT ( INCENERATOR )

LOKASI : RSUP PROF Dr R. D. KANDOU MANADO

TAHUN ANGGARAN : 2013

NO

SATUAN

HARGA

I

UPAH

1

Mandor

Rp

75,000.00

2

Kepala

Tukang

Rp

70,000.00

3

Tukang

Kayu

Rp

60,000.00

4

Tukang

Batu

Rp

60,000.00

5

Tukang

Besi

Rp

60,000.00

6

Tukang

Cat

Rp

60,000.00

7

Pekerja

Rp

50,000.00

II

BAHAN

Pasir/Batu

1

Pasir

pasangan

m3

Rp

170,000.00

2

Pasir

Beton

m3

Rp

170,000.00

3

Pasir

Urug

m3

Rp

175,000.00

4

Tanah

urug

m3

Rp

150,000.00

5

Kerikil

m3

Rp

200,000.00

6

Batu

kali

m3

Rp

150,000.00

7

Sirtu

m3

Rp

162,000.00

8

Semen

(

50

kg

)

Zak

Rp

60,000.00

9

Semen

Putih

kg

Rp

2,770.00

10 Batu

bata

bh

Rp

800.00

11 Keramik

ukuran

(

30x30

)

cm

bh

Rp

5,500.00

Kayu

1

Kayu

Papan

Kls

I

m3

Rp

5,000,000.00

2

Kayu

Balok

Kls

I

m3

Rp

5,000,000.00

3

Kayu

Papan

Kls

II

m3

Rp

4,750,000.00

4

Kayu

Balok

Kls

II

m3

Rp

4,750,000.00

5

Kayu Kelas III ( papan )

m3

Rp

4,000,000.00

6

Kayu Kelas III ( balok )

m3

Rp

4,000,000.00

7

Kayu

bekisting

papan

m3

Rp

2,200,000.00

8

Kayu

Stutwerk

(

Perancah

)

m3

Rp

1,000,000.00

9

Kayu

kelas

IV

(

Bekisting

)

Balok/Kaso

m3

Rp

2,150,000.00

10 Kayu

kelas

IV

(

Bekisting

)

Papan

m3

Rp

2,295,000.00

11 Dolken

btg

Rp

100,000.00

12 Triplek

4

mm

lbr

Rp

60,000.00

13 Triplek

9

mm

lbr

Rp

135,000.00

18 Minyak

Bekisting

ltr

Rp

18,000.00

hari

hari

hari

hari

hari

DAFTAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH

KETERANGAN

hari

hari

(18)

Besi

1

Besi

Beton

kg

Rp

12,500.00

2

Besi

Profil

kg

Rp

8,500.00

3

Besi

Strip

kg

Rp

5,700.00

4

Besi

Siku

L

kg

Rp

9,000.00

5

Paku

biasa

kg

Rp

18,000.00

6

Paku

sekrup

kg

Rp

16,500.00

7

Paku

atap

seng

kg

Rp

22,000.00

8

Paku

triplek

kg

Rp

18,500.00

9

Baut

bh

Rp

10,000.00

10

Kawat

beton

kg

Rp

14,000.00

Kap/Atap

1

Seng

BJLS

lbr

Rp

73,200.00

2

Seng

Plat

lbr

Rp

91,000.00

Cat/Kaca

1

Cat

Tembok

kg

Rp

46,000.00

2

Cat

Minyak

kg

Rp

40,300.00

3

Cat

Menie

kg

Rp

41,000.00

4

Cat

Dasar

kg

Rp

19,500.00

5

Minyak

Cat

Ltr

Rp

22,000.00

6

Amplas

Kayu

Lbr

Rp

4,000.00

7

Amplas

Besi

Lbr

Rp

4,000.00

8

Plamur

kg

Rp

19,500.00

9

Residu

kg

Rp

13,400.00

10

Dempul

kayu

kg

Rp

19,500.00

11

Lem

Kayu

kg

Rp

17,000.00

Sanitary

1

Pipa

PVC

2"

m'

Rp

15,000.00

2

Pipa

PVC

6"

m'

Rp

84,000.00

#REF! #REF! #REF! #REF!

Referensi

Dokumen terkait

Ucapan terima kasih kepada Henny yakni sahabat sekaligus saudari yang selalu mendengarkan keluhan penulis selama penulisan tesis ini, rekan-rekan Program Studi Magister

( www..wikipedia.org/wiki/ Darboux _ integral. Di akses tanggal 13 Juli 2009) Adapun tentang sesuatu yang mempunyai nilai yang sama tersebut dijelaskan juga dalam Al-qur’an

Tepung tapioka memiliki viskositas puncak yang paling tinggi dan waktu gelatinisasi yang lebih cepat dibandingkan dengan tepung lainnya, tetapi memiliki viskositas

Manajemen strategis adalah proses dan pendekatan terintegrasi yang mencakup analisis lingkungan internal dan lingkungan eksternal organisasi, formulasi strategi, implementasi

Ilmu pengetahuan dan teknologi (IPTEK), selalu berkembang setiap saat dalam rangka menggali sebuah pemikiran, ide dan berbagai hal yang berkaitan dengan kemajuan lembaga

Bone Bolango Tahun Anggaran 2013 telah mengadakan Pembukaan Dokumen Penawaran terhadap rekanan yang menyampaikan penawaran.. Setelah diadakan Penelitian Penawaran yang

Berdasarkan hasil pengukuran kinerja terhadap realisasi capaian indikator kinerja utama Dinas Kependudukan dan Pencatatan Sipil Kabupaten Bantul Tahun 2020, disimpulkan bahwa

Kepala UPTD Puskesmas Watumanu EDA DAMIANUS NIP.19631231 198511 1 065 Terbitan :  No.. Pengertian Kondisi terjadinya tekanan darah sistolik lebih dari ≥140 mmHg dan atau diastolic