• Tidak ada hasil yang ditemukan

4.UN REDD pilot province 0

N/A
N/A
Protected

Academic year: 2017

Membagikan "4.UN REDD pilot province 0"

Copied!
11
0
0

Teks penuh

(1)
(2)

Test

 

REDD

 

implementation

 

system

Achieve

 

readiness

 

for

 

national

 

l

(3)

Outcome 2: Demonstration of establishing 

a REL MRV and fair payment systems

a REL, MRV and fair payment systems

1 Measuring Reporting Verification (MRV)

1. Measuring, Reporting, Verification (MRV)

2. Reference Emission Level (REL)

3. Harmonized Fair and Equitable payment

3. Harmonized Fair and Equitable payment  mechanism

(4)

Outcome 3: Capacity established to 

implement REDD at decentralized levels

implement REDD at decentralized levels

1 Capacity for spatial socio‐economic

1. Capacity for spatial socio economic 

planning incorporating REDD at district  level

2. Empowered stakeholders are able to  benefit from REDD

l k h ld d d d l

(5)

1 Deforestation is on going but significant

1. Deforestation is on‐going, but significant  forest cover remaining

2. Carbon density is relatively high

2. Carbon density is relatively high

3. Local political support is strong

4. Local capacity is reasonably strong

4. Local capacity is reasonably strong

5. Drivers can be addressed easily

6. REDD can bringg co‐benefits

7. Location of other REDD initiatives

(6)

Province will be selected from:

Province will be selected from:

• Central Sulawesi • North SulawesiNorth Sulawesi

(7)

• Around 60% forest coverAround 60% forest cover

• 2% rate of deforestation and forest  degradation

• Relatively high carbon density

• Detailed research has been done in  Sulawesi by STORMA project

• Governors are forward thinking

(8)

L d C M Land Cover Map

2005/2006

(9)

Main drivers: 

– Small‐scale agriculture – Logging

Co‐benefits: 

– Low scores on MDG, high poverty.  – Very high biodiversity.

• Other REDD initiatives taking place in 

K li t d S t S l i d

(10)

Decision on pilot province to be made

Decision on pilot province to be made.

Inception workshop in pilot province 

(11)

Referensi

Dokumen terkait

[r]

[r]

[r]

Satker : KANTOR UNIT PENYELENGGARA PELABUHAN KELAS III AMPANA Pekerjaan : SUPERVISI/PENGAWASAN LANJUTAN PEMBANGUNAN FASILITAS1. PELABUHAN LAUT MANTANGISI, OPTIMALISASI (Lelang

Pokja Barang/Jasa Konsultansi dan Jasa Lainnya pada Unit Layanan Pengadaan Barang/Jasa Kabupaten Aceh Barat Daya akan melakukan klarifikasi dan/atau verifikasi kepada penerbit

Pokja Konstruksi pada Unit Layanan Pengadaan Barang/Jasa Kabupaten Aceh Barat Daya akan melakukan klarifikasi dan/atau verifikasi kepada penerbit dokumen, apabila diperlukan.

Pokja Konstruksi pada Unit Layanan Pengadaan Barang/Jasa Kabupaten Aceh Barat Daya akan melakukan klarifikasi dan/atau verifikasi kepada penerbit dokumen, apabila diperlukan.

Dari Hasil evaluasi Dokumen Penawaran dan Kualifikasi diatas bahwa ke 5 (lima) perusahaan tersebut, 3 (tiga) perusahaan tidak memenuhi syarat (tidak lulus) di