• Tidak ada hasil yang ditemukan

Yuko Riswandha 21100112130068 Daftar Pustaka

N/A
N/A
Protected

Academic year: 2017

Membagikan "Yuko Riswandha 21100112130068 Daftar Pustaka"

Copied!
3
0
0

Teks penuh

(1)

81 DAFTAR PUSTAKA

Abranson, L. W., Thomas, S. L., Sunil, Sharma., Glenn, M.Boyce. 2002. Slope Stability an Stabilization Methods. A Wiley-Unterscience Publication: California.

US Bureau of Reclamation (USBR). 2012. Design Of Small Dams. A Water Resources Technical Publication. US.

Bronto, S., Mulyaningsih, S., Hartono, G., Astuti, B. 2009. Waduk Parangjoho dan Songputri Sumber Erupsi Formasi Semilir di Daerah Eromoko, Kabupaten Wonogiri. Jurnal Geologi Indonesia, Vol.4. No. 2 Juni 2009: 79-92

Calamak, M., Yanmaz, A.M. 2014. Probabilistic Assessment of Slope Stability for Earth-fill Dams Having Random Soil Parameter. Hydraulic Structures and Society: Engineering Challenges and Extremes. ISBN 978174271156. DOI: 10.14264 25-27 June 2014

Choudhury, M., Somdatta, Basu., Jonathan, D Bray. 2007. Behaviour of Slopes under Static and Seismic Conditions by Limit Equlibrium Method. Geo-Denver 2007 Gsp 161: New Peaks in Geotechnical.

Chowdhury, Robin. 2010. Geotechnical Slope Analysis. Taylor & Francis group: London, UK.

Dewa, Gea W. R., Asmaranto, Runi. 2014. Analisa kestabilan Tubuh Bendungan Lolak Kabupaten Bollang, Sulawesi Utara. Jurnal Teknik Pengairan Universitas Brawijaya. Vol 1: 77-85 : Malang.

Devi, S., Azmeri. 2013. Kajian Kestabilan Tubuh Waduk Ruko Kecamatan Titieu Kumala Kabupaten Pidie. Konferensi Nasional Teknik Sipil 7 (KoNTekS 7): Surakarta.

Duncan,. C. W dan Christopher,. W. M. 2003. Rock Slope Engineering. Spon Press : New york, USA.

Fell, R., Macgregor, Patric., Stapledon, David., Bell, Graeme. 2005. Geotechnical Engineering of Dams. London, UK : Taylor & Francis Group plc,

(2)

82 Gouw, T. L., Juven, Dave. G.H . 2012. Analisa Stabilan Lereng Limit Equilibrium

vs Finite Element Method. Hatti-PIT-XVI 2012: Jakarta.

Huang, Yang H. 2014. Analysis Slope Stability by the Limit Equilibrium Method. Asce Press. American Society of Civil Enginering.

Kementrian Pekerjaan Umum. 2010. Peta Zonasi Kegempaan Indonesia. Jakarta Kutzner, C. 1997. Earth and Rockfill Dams. Consulting Geotechnical Engineering

A.A Balkema, Rotterdam.

Larosa, E.J., Iskandar, R. 2012. Analisis Stabilitas Lereng Bendung Usu Kuala Berkala. Universitas Sumatra Utara: Medan

Lewis, B. 2014. Small Dams. Dam Consultant: Australia.

Look, B. 2007. Handbook of Geothecnical Investigation and Design Tables. London : Taylor Francis Grup.

Ortigao, J.A.R., Sayao, A.S. 2004. Handbook of Slope Stabilisation. Ederal University of Rio de Janeiro: Brazil.

Pd T-14-2004-A. 2004. Pedoman Konstruksi dan Bangunan tentang Analisis Kestabilan Bendungan. Departement pemukiman dan Prasarana Wilayah. Petel, S. K., Sanghvi, C.S. 2012. Seismic Slope Stability Analisys of Kaswati Earth

Dams. International Journal of Advanced Engineering Research and Studies. E-ISSN2249-8974. Vol. I

RSNI M-030-2002. 2002. Metode Analisis Stabilitas Lereng Statik Bendungan Tipe Urugan. Departemen Pemukiman dan Prasarana Wilayah: Bandung. Siddhartha, M. 2013. Sesmic Slope Stability Analysis of Earth Dam : Some Modern

Practice. International Journal of Recent advances in Mechanical Engineering (IJMECH) Vol.2, No.1 : Nadia, West Bengal

Smyth, H., Hall, R., Nichols, G.J. 2005. Cenozoic volcanic arc history of East Java, Indonesia. The Geological Society of America, Special paper 436 pp. Sribudiyani., Muchlisin, Nanang., Astono. P., Ryacudu, Rudi., Kunto,

(3)

83 Sosrodarsono, S., Takeda, K. 1981. Bendungan Tipe Urugan. Pradnya Paramita.

Jakarta.

Soedibyo. 2003. Teknik Bendungan. Jakarta: Pradnya Paramita

Surono., Toha, B., Sudarno, I. 1992. Peta Geologi Lembar Surakarta-Giritontro, Jawa. Pusat Penelitian dan Pengembangan Geologi, Bandung.

US Army Corps of Engineer. 2004. General Design and Contruction Considerations foe Earth and Rock-fill Dams. Departement of the army U.S: Washigton DC EM 1110-2-2300.

Van Bemmelen, R.W. 1949. The Geology of Indonesia. Vol IA. Martinus Nijnhoff, The Hague, 732.

Wang, J dan Ji, H. 2013. Analysis of Rock Slope Stability on Basis of Limit Euilibrium Method. Advance Material Resarch Vols. 711 (2013) pp 333-337 : Switzerland.

Zakaria, Z., 2009. Ebook : Analisis Kestabilan Lereng Tanah. UNPAD: Bandung. Zhang, C., Yang Z., Hui Zhou. 2013. Comparative Analysis of Stability fo Slope

Engineering with Reliability Analysis and Limit Equilibrium Method Advance Material Resarch Vol. 438-439 (2013) pp 1195-1199 : Switzerland.

Zongwei, L., Dajuan, Y. 2014. The Limit Equilibrium Method in Application of Earth-rock Fill Dams Reinforcement. Advance Material Resarch Vols. 1065-1069 (2015) pp 236-239 : Switzerland.

Referensi

Dokumen terkait

Mendeskripsikan upaya-upaya stimulasi faktor pendukung dan eliminasi faktor penghambat (yang sudah dan masih dilakukan) oleh generasi pendahulu serta suksesor dalam

Lingkungan kerja fisik adalah semua keadaan berbentuk fisik yang berada di sekitar tempat kerja yang dapat mempengaruhi kinerja karyawan, baik secara langsung maupun

Pada hari ini Jum'at tanggal lima belas Juni Tahun Dua Ribu Dua Belas, kami yang bertanda tangan dibawah ini Panitia Pengadaan Barang dan Jasa Dinas Bina Marga dan Pengairan

Pada hari Jum'at tanggal 28 September 2012 , kami Panitia Pengadaan Barang dan Jasa yang diangkat berdasarkan Surat Keputusan Dinas Bina Marga dan Pengairan Kab. 719-

Acara dipimpin oleh Ketua Panitia Pengadaan Barang/Jasa Setda Kabupaten Tangerang, dihadiri oleh anggota Panitia Pengadaan Barang/Jasa Setda Kabupaten Tangerang dan

Pengaruh Penetapan Risiko Kekurangan dan Tipe Kepribadian Auditor Terhadap Skeptisisme Profesional Auditor.. Universitas Pendidikan Indonesia | repository.upi.edu |

[r]

Pemecah gelombang sisi campuran merupakan gabungan dari tipe pertama dengan tipe yang kedua. Contoh pembuatan pemecah gelombang sisi campuran : untuk sisi