• Tidak ada hasil yang ditemukan

Walker, R. G. dan James, N. P., 1992 : Facies Models Response to Sea Level Change, Geological Association of Canada. Weber, K. J.

N/A
N/A
Protected

Academic year: 2021

Membagikan "Walker, R. G. dan James, N. P., 1992 : Facies Models Response to Sea Level Change, Geological Association of Canada. Weber, K. J."

Copied!
19
0
0

Teks penuh

(1)

DAFTAR PUSTAKA

Bahar, A., 2006 : Geostatistic for Reservoir Characterization and Integrated Reservoir

Modeling, Course Material.

BATM USAKTI, 2004 : The determination of Pungut field’s Bekasap Formation primary

production baseline using reservoir simulation technique, Final report, p. 4-19.

Clark, M.S., Melvin, J.D., Prather, R.K., Marino, A.W., Boles, J.R. dan Imperato, D.P.,

1999 : Characterization of The Distal Margin of a Slope-Basin (class-III)

Reservoir

, ARCO-DOE Slant Well Project, Yowlumne Field, California, in R.

Schatzinger and J. Jordan, eds., Reservoir Characterization-Recent Advances,

AAPG Memoir 71, 21-28.

Dalrymple, R. W., B. A. Zaitlin, dan R. Boyd, 1992 : Estuarine facies models: conceptual

basis and stratigraphic implications

: Journal of Sedimentary Petrology, vol. 62, p.

1130-1146.

De Coster, G. L., 1974 : The Geology of the Central and South Sumatera Basins,

Proceeding IPA 3

rd

Annual Convention

, vol. 1, p. 77-110.

Eubank, R.T. dan Makki, A.C., 1981 : Structural geology of the Central Sumatera

Back-arc Basin, IPA Tenth Annual Convention, Jakarta.

Gomma, E. E., 2005 : Reservoir Characterization, Course material.

Heidrick, Tom L. dan Karsani, A., 1993 : A Structural and Tectonic Model of the Coastal

Plain Block, Central Sumatera Basin, Proceeding IPA 22th Annual Convention,

Jakarta.

Kadar, D. dan Utama, R., 1998 : Pungut-01 Biostratigraphy Analysis Report, Laporan

Internal PT. CPI.

Kelkar, M. dan Perez, G., 2002 : Applied Geostatistics for Reservoir Characterization,

Society of Petroleum Engineers Inc, Richardson, Texas, 264 p.

Mertosono, S. dan Nayoan, G.A.S., 1974 : The Tertiary Basinal Area of Central

Sumatera, Proceeding IPA 3

rd

Annual Convention

, vol. 1, p. 63-67.

Noeradi, D., 2006 : Reservoir Geology, Bahan materi perkuliahan.

Pujiarko dan Denison, C. N., 1999 : Pungut field reservoir stratigraphy: Reservoir

architecture, facies distribution and sequence stratigraphic framework, Bekasap

RMT Report

, 99-03, p. 7-20.

Pulunggono, A. dan Cameron, N.R., 1984 : Sumatran Microplates, Their Characteristics

and Their Role in the Central and South Sumatera Basins, Proceeding IPA 13

th

Annual Convention

, vol. 1, p. 121-124.

Seilacher, A., 1978 : Use of trace fossil assemblages for recognizing deposition

environments. In: Basan, P. B. (Ed.) Trace Fossil Concepts, SEPM Short Course,

(2)

Walker, R. G. dan James, N. P., 1992 : Facies Models Response to Sea Level Change,

Geological Association of Canada.

Weber, K. J., 1986 : How heterogeneity affects oil recovery, in Lake, L. W. dan Caroll,

H. B. (eds) Reservoir Characterization, Academic Press, London, pp. 487-544.

Yarmanto dan Aulia, K., 1988 : The seismic expression of wrench tectonics, Central

Sumatra Basin, 17th Annual Convention, Ikatan Ahli Geologi Indonesia, Jakarta,

Indonesia, 34 p.

Yarmanto dan Sitohang, E., 1996 : Central Sumatera Basin Sequence Stratigraphy, PT.

Caltex Pacific Indonesia, tidak dipublikasikan.

(3)

Lampiran 1

. Log batuan inti bor (core log) di sumur Pungut-01.

: burrow lateral : ripple : flaser : wavy : lentikular

: burrow miring : load cast

: burrow vertikal : bidang erosi

G ra nu la r/ P eb bl y V er y co ar se sa nd C oa rse sa nd M ed iu m sa nd Fi ne sa nd V er y fin e sa nd S ilt Shale bu ru k se da ng ba ik sg t b ai k 0 1 2 3 4 5 6 tid ak a da se da ng ba ik LEGENDA : batupasir B at up as ir gl au ko ni t B at ul an au k ar bo na n : batulempung : batupasir karbonatan : fragmen batuan 2920 2905 : batulanau 2910

interval 2854-2859 : batulempung, lanauan, abu gelap, keras. Pada kedalaman 2854 kaki diambil sampel untuk analisis biostratigrafi.

interval 2859-2861 : batupasir, abu muda, berbutir sedang, terpilah sedang, keras, terlihat jejak minyak (trace), ditemukan laminasi batulempung. 2925 S a n d B a r

interval 2871-2878 : batupasir, abu-abu kehijauan, berbutir sedang-kasar, terpilah buruk dan keras.

interval 2881-2889 : batulempung, abu gelap-kecoklatan, mengandung glaukonit.

interval 2889-2903: batupasir, abu kehijauan, berbutir sedang-kasar, terpilah buruk dan keras, mengandung glaukonit, karbonatan dan jejak minyak (trace oil show)

interval 2920-2932: batulempung, abu gelap, keras. Pada kedalaman 2928 kaki diambil sampel untuk analisis biostratigrafi. B at ul em pu ng 2915 Li ng k. P en ge nd ap an Deskripsi

2861-2871: batupasir, abu muda, berbutir sedang-kasar, terpilah buruk dan keras. Mineral pirit masih bisa ditemukan sedangkan glaukonit sangat jarang ditemukan. Kerikilan di bagian bawah. Li to fa si es ba tu le m pu ng B at up as ir A sso si asi F asi es

LOG BATUAN INTI BOR (CORE LOG)

Litologi

Foto

PemilahanIndek Bioturbasi

Log GR (API) K ed al am an Oil Stain Sumur Pungut-01 Formasi Bekasap R es er vo ir 2900 2870 2855 2895 2860 2865

interval: 2878-2881: Tidak ada sampel

B at ul em pu ng L a p is a n B a tu p a s ir B L a p is a n B a tu p a s ir C

interval 2903-2908: batupasir, abu gelap-kehijauan, berbutir halus-sedang, terpilah sedang dan keras, mengandung glaukonit, mica dan material karbonan. Laminasi batulempung dibagian bawah, pirit. Di bagian atasnya, terdapat laminasi batulanau dan batupasir.

interval 2908-2920: batulanau, abu gelap, keras, mengandung material karbonan, mica dan kadang ditemukan pirit.

2885 2890 2875 2880 2930 In te rt id a l In te rt id a l S h e lf S a n d B a r C h a n n e l C h a n n e l 0 200

: mengandung material karbonan : shale rip up clast : cross laminasi

: nodul lempung / siderit : paralel laminasi

(4)

Lampiran 2

. Log batuan inti bor (core log) di sumur Pungut-35.

: burrow lateral : ripple : flaser : wavy : lentikular

: burrow miring : load cast

: burrow vertikal : bidang erosi

G ra nu la r/ P eb bl y V er y co ar se s an d C oa rs e sa nd M ed iu m s an d Fi ne s an d V er y fin e sa nd S ilt Shale bu ru k se da ng ba ik sg t b ai k 0 1 2 3 4 5 6 tid ak ad a se da ng ba ik 2845 : batupasir karbonatan : fragmen batuan

Interval 2800-2808 : Batupasir, abu-abu, berbutir halus, terpilah sedang-baik, membulat-membulat tanggung, kompak, intensitas bioturbasi rendah. Struktur flaser , burrow vertikal dan horisontal, komposisi mineral: glaukonit, fragmen min. kuarsa.

Interval 2795-2800 : Batupasir, abu-abu, berbutir sedang-sangat halus, terpilah sedang-baik,membulat tanggung, komposisi mineral: glaukonit, kuarsa, non karbonatan, intensitas bioturbasi rendah.

T id a l S a n d F la t Li to fa si es M u d F la t B at up as ir gl au ko ni t B at up as ir gl au ko ni t bi ot ur ba si

Formasi Bekasap

Interval 2785-2793 : Batulempung, abu gelap,ditemukan konkresi besi di beberapa tempat, non karbonatan. Batulanau di bagian bawah.

Interval 2793-2795 : Batupasir, abu-abu, berbutir halus, terpilah baik, kompak, karbonatan.

2795 2785 LEGENDA : batupasir : batulanau : batulempung R es er vo ir 2835 2805 2790 2830 2820 2825 2815

Interval 2819- 2825 : Batupasir, abu-abu terang, berbutir sedang-kasar, terpilah sedang-buruk, membulat tanggung, fragmen min kuarsa tersebar merata, intensitas glaukonit makin banyak ke arah bawah. Terdapat mud clast siderit di beberapa tempat. B at ul an au le nt ik ul er

Interval 2812-2819 : Batupasir, abu kehijauan, berbutir kasar-sangat kasar, terpilah sedang-baik, membulat tanggung, karbonatan setempat, kompak, struktur laminasi silang-siur, glaukonit, glosifungites , batulempung kecoklatan di bagian bawah. T id a l C h a n n e l

Interval 2825-2845 : Batulanau, terpilah baik, lentikuler, non karbonatan, konkresi besi, karbon, pada bagian atas terdapat glosifungites.

Interval 2808-28012 : Batupasir, abu gelap, berbutir halus-sedang, terpilah baik, glosifungites , kompak, min. kuarsa.

B at up as ir gl au ko ni t k ar bo na ta n

LOG BATUAN INTI BOR (CORE LOG)

Litologi

Foto

PemilahanIndek Bioturbasi

Log GR (API) K e da la ma n (k a k i) Oil Stain

Sumur Pungut-35

Li ng k. P en ge nd ap an

Deskripsi

B at ul em pu ng A sso si asi Fa si es In te rt id a l-S h e lf M u d f la t B at up asi r g la uko ni t T id a l S a n d B a r ba tu pa si r 2840 2810 L a p is a n B a tu p a s ir C 2800

: mengandung material karbonan : shale rip up clast : cross laminasi

: nodul lempung / siderit : paralel laminasi

: karbonatan

(5)

Lampiran 3a

. Log batuan inti bor (core log) reservoir B di sumur Pungut-37.

: burrow lateral : ripple : flaser : wavy : lentikular

: burrow miring : load cast

: burrow vertikal : bidang erosi

G ra nu la r P eb bl y V er y co ar se s an d C oa rs e sa nd M ed iu m s an d Fi ne s an d V er y fin e sa nd S ilt Shale bu ru k se da ng ba ik sg t b ai k 0 1 2 3 4 5 6 tid ak ad a se da ng ba ik 2900 T id a l C h a n n e l In te rt id a l - In n e r N e ri ti c T id a l S a n d B a r T id a l C h a n n e l M u d F la t

LOG BATUAN INTI BOR (CORE-LOG)

Litologi

Foto Pemilahan

Sumur Pungut-37

Formasi Bekasap

: fragmen batuan LEGENDA R es er vo ir Log GRN (API) K e da la ma n (k a k i) 2895 2875 2880 2855 2870 2885 2890 2860 : batupasir : batulanau : batulempung : batupasir karbonatan

Interval 2849-2856 : Batulanau, abu-abu kehitaman, terpilahan baik, non karbonatan, oksida, min. kuarsa, struktur sedimen lentikuler 2850 2865 Li ng k. P en ge nd ap an Li to fa si es A sso si asi Fa si es

Indek BioturbasiOil Stain

Deskripsi

L a p is a n B a tu p a s ir B B at ul an au le nt ik ul er B at up asi r ke riki la n B at up as ir

Interval 2894- 2896 : Batupasir, abu-abu muda, berbutir kasar, terpilah sedang, membulat tanggung, fragmen min. kuarsa tersebar, karbonatan, kompak dan keras. Terdapat nodul lempung (siderite) di bagian bawah.

Interval 2864-2882 : Batupasir, abu gelap-kecoklatan, berbutir sedang-halus, terpilah sedang-baik, membulat tanggung, fragmen min. kuarsa, pirit kadang ditemukan,

burrow, struktur sedimen flaser, wav y dan laminasi silang siur, karbonan.

Interval 2882-2894 : Batupasir, abu terang-kecoklatan, berbutir sedang-halus, terpilah sedang-buruk, membulat tanggung, fragmen min. kuarsa pada bag. bawah, min. mika tersebar, banyak terdapat burrow dengan orientasi vertikal dan horisontal (skolithos, planolithes, paleophycus), struktur sedimen laminasi silang siur, mud drape , semakin ke bawah intensitas bioturbasi makin banyak, non karbonatan. Interval 2856-2861 : Batupasir, abu muda kecoklatan, berbutir kasar, terpilah buruk, menyudut tanggung-membulat tanggung, fragmen kuarsa, burrow (ophiomorpha), non karbonatan. Terdapat batupasir kerikilan, kompak dan keras.

Interval 2861-2864 : Batupasir, abu kecoklatan, berbutir sedang-kasar, terpilah sedang-buruk, membulat tanggung, struktur laminasi paralel,

burrow (ophiomorpha ), mika, karbon, non karbonatan.

B

at

ul

an

au

Interval 2896-2900 : Batulanau, abu-abu kehitaman, terpilah baik, non karbonatan, konkresi besi.

B at up as ir fl a s e r & w a v y B at up as ir c ro s s l a m in a ti o n d an b io tu rb as i

: mengandung material karbonan : shale rip up clast : cross laminasi

: nodul lempung / siderit : paralel laminasi

: karbonatan

(6)

Lampiran 3b

. Log batuan inti bor (core log) reservoir C di sumur Pungut-37.

: burrow lateral : ripple : flaser : wavy : lentikular

: burrow miring : load cast

: burrow vertikal : bidang erosi

G ra nu la r P eb bl y V er y co ar se s an d C oa rs e sa nd M ed iu m s an d Fi ne s an d V er y fin e sa nd S ilt Shale bu ru k se da ng ba ik sg t b ai k 0 1 2 3 4 5 6 tid ak ad a se da ng ba ik B at up asi r fl a se r & b io tu b a si S h e lf m u d f la t T id a l C h a n n e l Ti da l S a nd Fl a t

LOG BATUAN INTI BOR (CORE-LOG)

Litologi

Foto Pemilahan

Sumur Pungut-37

Formasi Bekasap

: fragmen batuan LEGENDA R es er vo ir Log GRN (API) K e da la ma n (k a k i) Li to fa si es A sso si asi Fa si es

Indek BioturbasiOil Stain

Deskripsi

2945 : batupasir : batulanau : batulempung : batupasir karbonatan

Interval 2933,5-2943 : Batulanau, abu-abu kehitaman, terpilah baik, konkresi besi, kuarsa, min. hitam, mudah hancur, struktur sedimen lentikular, pada bagian atas terdapat glosifungites, konkresi min besi, non karbonatan

2940 2920 2915 Li ng k. P en ge nd ap an B at ul an au le nt ik ul er 2925 2930 2935

Interval 2928-2934 : Batupasir, abu muda-kehijauan, berbutir sedang-kasar, terpilah buruk, menyudut tanggung-membulat tanggung, sementasi baik, lamination silang siur, lapisan tipis

mud drape, nodul lempung, glaukonit, kuarsa, mika,

karbonatan. B at up as ir ka rb on at an L a p is a n B a tu p a s ir C

interval 2900-2913 : Tidak ada sampel

2910 2905

Interval 2922-2928 : Batupasir, abu muda, berbutir sedang-halus, terpilah sedang, membulat tanggung, bioturbasi, terdapat burrow dengan orientasi vertikal dan horisontal (ophiomorpha, planolithes, paleophycos), struktur laminasi silang siur, wavy . Glaukonit, mika dan mineral hitam. Interval 2913-2916 : Batupasir, abu kehijauan, berbutir sedang-kasar, terpilah sedang, membulat tanggung, keras, glaukonit, kuarsa, sedikit karbonatan.

Interval 2916-2922 : Batupasir, abu kehijauan-kecoklatan, berbutir sedang-halus, terpilah baik, menyudut-membulat tanggung, intensitas bioturbasi rendah, burrow, flaser , non karbonatan, intensitas glaukonit makin banyak ke arah atas, kuarsa dan mika.

B at up as ir ka rb on at an B at up asi r g la uko ni t

: mengandung material karbonan : shale rip up clast : cross laminasi

: nodul lempung / siderit : paralel laminasi

: karbonatan

(7)
(8)

Lampiran 4

. Analisis foraminifera dan Nano fosil dari sumur-01 (Kadar dan

(9)

Lampiran 5

. Korelasi antar sumur dan penyebaran fasies berarah utara-selatan, di bagian utara daerah penelitian (lintasan 1U)

Utara

Selatan

FS_B2

FS_B1

FS_C2

FS_C1

Utara

Selatan

FS_B2

FS_B1

FS_C2

FS_C1

1U 1S 2U 2S 1U 1S 2U 2S

(10)

Lampiran 6

. Korelasi antar sumur dan penyebaran fasies berarah utara-selatan, di bagian selatan daerah penelitian (lintasan 1S)

Utara

Selatan

FS_B2

FS_B1

FS_C2

FS_C1

Utara

Selatan

FS_B2

FS_B1

FS_C2

FS_C1

1U 1S 2U 2S 1U 1S 2U 2S

(11)

Lampiran 7

. Korelasi antar sumur dan penyebaran fasies berarah timur-barat, di bagian utara daerah penelitian (lintasan 3)

(Sumur Core)

FS_B2

FS_B1

FS_C2

FS_C1

(Sumur Core)

FS_B2

FS_B1

FS_C2

FS_C1

3 4 5 6 7 8 9 3 4 5 6 7 8 9

(12)

Lampiran 8

. Korelasi antar sumur dan penyebaran fasies berarah timur-barat, di bagian utara daerah penelitian (lintasan 4)

Timur

Barat

FS_B2

FS_B1

FS_C2

FS_C1

Timur

Barat

FS_B2

FS_B1

FS_C2

FS_C1

3 4 5 6 7 8 9 3 4 5 6 7 8 9

(13)

Lampiran 9

. Korelasi antar sumur dan penyebaran fasies berarah timur-barat, di bagian utara daerah penelitian (lintasan 6)

Timur

Barat

FS_B2

FS_B1

FS_C2

FS_C1

Timur

Barat

FS_B2

FS_B1

FS_C2

FS_C1

3 4 5 6 7 8 9 3 4 5 6 7 8 9

(14)

Lampiran 10

. Korelasi antar sumur dan penyebaran fasies berarah timur-barat, di bagian selatan daerah penelitian (lintasan 7)

Timur

Barat

FS_B2

FS_B1

FS_C2

FS_C1

Timur

Barat

FS_B2

FS_B1

FS_C2

FS_C1

3 4 5 6 7 8 9 3 4 5 6 7 8 9

(15)

Lampiran 11

. Korelasi antar sumur dan penyebaran fasies berarah timur-barat, di bagian selatan daerah penelitian (lintasan 8)

Timur

Barat

FS_B2

FS_B1

FS_C2

FS_C1

Timur

Barat

FS_B2

FS_B1

FS_C2

FS_C1

3 4 5 6 7 8 9 3 4 5 6 7 8 9

(16)

Lampiran 12

. Korelasi antar sumur dan penyebaran fasies berarah timur-barat, di bagian selatan daerah penelitian (lintasan 9)

Timur

Barat

FS_B2

FS_B1

FS_C2

FS_C1

Timur

Barat

FS_B2

FS_B1

FS_C2

FS_C1

3 4 5 6 7 8 9 3 4 5 6 7 8 9

(17)
(18)

Lampiran 14

. Peta properti porositas rata-rata (kiri) dan permeabilitas rata-rata (kanan) reservoir batupasir B di daerah penelitian.

10 - 12 % 12 - 14 % 14 - 16 % 16 - 18 % 18 - 20 % 20 - 22 % 10 - 12 % 12 - 14 % 14 - 16 % 16 - 18 % 18 - 20 % 20 - 22 % mD mD mD mD mD mD mD mD

(19)

Lampiran 15

. Peta properti porositas rata-rata (kiri) dan permeabilitas rata-rata (kanan) reservoir batupasir C di daerah penelitian.

mD mD mD mD 10 - 12 % 12 - 14 % 14 - 16 % 16 - 18 % 10 - 12 % 12 - 14 % 14 - 16 % 16 - 18 %

Referensi

Dokumen terkait