• Tidak ada hasil yang ditemukan

Geothermal Development Program and Status in Indonesia

N/A
N/A
Protected

Academic year: 2021

Membagikan "Geothermal Development Program and Status in Indonesia"

Copied!
24
0
0

Teks penuh

(1)

Dr. Surya Darma

Indonesia Geothermal Association (INAGA)

& Indonesia Renewable Energy Society (METI - IRES)

“Geothermal Development Program

and Status in Indonesia”

(2)

Outline

Indonesia Energy condition

Geothermal Energy Status

National Energy Policy

National Energy Mix Target

Development Plan

Geothermal & RE Road Map and

(3)
(4)

Current energy conditions

• Energy supply in Indonesia is still dominated by fossil fuel

• Not all of Indonesians have enjoyed electricity;

electrification ratio is only about 84%

• Due to energy crisis, Indonesia government has to

prioritize fossil based energy compared to renewable,

since fossil based energy takes shorter time for

deployment

• Implications: energy sector will become the major source

of emission after 2020

(5)

Diesel 11.7% Coal 52.8% Gas 24.2% Geother mal 4.4% Hydro 6.5% Others 0.4%

Persentage of installed capacity

Persentase Pemakaian Listrik Per-golongan

Persentage of Energy Mix

53.585 MW

Total Installed Capacity:

(PLN: 37.280 MW, IPP: 10.995 MW, PPU: 2.634 MW, IO Non BBM: 2.677 MW)

199 TWh

Power Consumption

84,35%

Electrification Ratio

Power Production*)

228 TWh

Power Condition (March 2015)

Total System Indonesia = 24

System

(5 Normal; 14 Emergency; and 5 Deficit)

(6)

Geothermal Energy

Status

(7)

1.493,5 MW

New 4 Geothermal PP COD around 215 MW (Ulubelu 55 MW, Sarulla 110 MW,

Lahendong 20 MW, Karaha Bodas 30 MW)

1. Geothermal Power Plant

Installed Capacity

3. Resources : 12,386 MW and Reserves : 16,524 MW

Total Potential : 28,910 MW

2. State Revenue (non-tax)

Rp. 518 billion

(82,2% from Rp. 630 billion, target in 2016 )

Rp

Current Geothermal Reserves &

Installed Status

Resources 12,386 MW Reserves16,524 MW Total Potential 28,910 MW

(8)

No. WKP, Location Power Plant Developer/

Operator Turbine Unit

Capasity Total (MW)

1 Sibayak – Sinabung, SUMUT 1 Sibayak PT. Pertamina Geothermal

Energy

1 x 10 MW;

2 MW monoblok) 12,0

2 Cibeureum – Parabakti, JABAR 2 Salak Chevron Geothermal Salak,

Ltd

3 x 60 MW;

3 x 65,6 MW 377,0

3 Pangalengan, JABAR

3 Wayang Windu Star Energy Geothermal

Wayang Windu

1 x 110 MW;

1 x 117 MW 227,0

4 Patuha PT Geo Dipa Energi 1 x 55 MW 55,0

4 Kamojang – Darajat, JABAR

5 Kamojang PT. Pertamina Geothermal

Energy 1 x 30 MW; 2 x 55 MW; 1 x 60MW 1 x 35 MW 235,0

6 Darajat Chevron Geothermal

Indonesia, Ltd

1 x 55 MW; 1 x 94 MW; 1 x 121 MW

270,0

5 Dataran Tinggi Dieng, JATENG 7 Dieng PT. Geo Dipa Energi 1 x 60 MW 60,0

6 Lahendong – Tompaso, SULUT 8 Lahendong PT. Pertamina Geothermal

Energy 4 x 20 MW 80,0

7 Waypanas, LAMPUNG 9 Ulubelu PT. Pertamina Geothermal

Energy 3 x 55 MW 165,0

8 Ulumbu, NTT 10 Ulumbu PT. PLN (Persero) 4 x 2,5 MW 10,0

9 Mataloko, NTT 11 Mataloko PT. PLN (Persero) 1 x 2,5 MW 2,5

TOTAL 1.493,5

(9)

1. Geothermal Investment

2. Renewable Investment

0.018 billion USD

(18% of target 0.1 billion USD)

3. Bioenergy Investment

0.298 billion USD

(94.7% of target 0.31 billion USD)

0.56 billion USD

(58.3% of target 0.96 billion USD)

1st semester 2016 : 0,87 billion USD

2016 target : 1,37 billion USD

(10)

National Energy

Policy

(11)

Paragraph (2) of article 11 Government Regulation Number 79 Year 2014

1.

Maximize renewable energy utilization;

2.

Optimize gas and new energy utilization;

3.

Minimize oil utilization.

4.

Utilization of coal as the main national energy

supply;

5.

Utilization of Nuclear Power Plant as the last

option.

National Energy Policy

Principles

(12)

National Energy Mix

Target

(13)

26% 23 % 25 % 30 % 22 % 2025 412 MTOE 31 % 20 % 25 % 24 % 2050 1.030 MTOE New and Renewable Energy

Oil Gas Coal

TARGET OF NATIONAL ENERGY MIX

TARGET RUEN 2025 TARGET RUEN 2050 CURRENT CONDITION

(14)

Target of RE in 2025

Note:

NRE = New & Renewable Energy Energy elasticity < 1

Optimize use of RE Electricity:

• 60% Fossil (68.2 GW), 40% RE (46.8 GW) • Total Demand: 115 GW by 2025

Need a leapfrog to meet NRE contribution in energy

(15)
(16)

Direktorat Jenderal Energi Baru, Terbarukan dan Konservasi Energi Kementerian Energi dan Sumber Daya Mineral

Ministry Regulation 17/2014 to Accelerate 13 Stagnant WKP) 67 WKP (6.198,5 MW) EKSPLOITATION: 9 WKP (1.403,5 MW) Stagnant: 13 WKP (1.275 MW) Under Going: 17 WKP (1.930 MW) EXPLORATION: 30 WKP ( 3.205 MW) Bidding Process: 26 WKP (1.425 MW) Under process License: 2 WKP (165 MW) Expected produce: 3.370 MW

(17)

0 2,000 4,000 6,000 8,000 10,000 12,000 19 83 19 84 19 85 19 86 19 87 19 88 19 89 19 90 19 91 19 92 19 93 19 94 19 95 19 96 19 97 19 98 19 99 20 00 20 01 20 02 20 03 20 04 20 05 20 06 20 07 20 08 20 09 20 10 20 11 20 12 20 13 20 14 20 15 20 16 20 17 20 18 20 19 20 20 20 21 20 22 20 23 20 24

Geothermal Growth (Cumulative MW)

Low estimate MEMR PLN Roadmap

Development plans

Low estimate:

• Number of developments is

similar to MEMR plan, but • Size of some individual

projects is smaller and some are delayed

(18)

Development plans, cont.

18 0 10 20 30 40 50 60 1983 1988 1993 1998 2003 2008 2013 2018

Number of Power Projects

(19)

Geothermal & RE

Road Map and

(20)

Pemanfaatan Utilization Eksplorasi Exploration Survey Pendahuluan Preliminary Survey 3G Geophysic Geochemical Geologic Sumur uji Deliniation well Sumur eksplorasi Exploration well Sumur pengembangan & injeksi

Dev’t & Injection well

Eksploitasi

Exploitation

Pemb. fasiltas lap & penunjangnya

Steamfield & supporting facilities

Operasi produksi Production operation Studi Kelayakan Feasibility Study Badan Usaha Government/ Local Government/ Business Entity

Paling lama 5 tahun + 1 tahun + 1 tahun

Maximum 5 years + 1 year + 1 year

30Years Maximum 30 years Business Entity Badan Usaha Business Entity Badan Usaha Business Entity Potensi Panas Bumi Geothermal Potential

Ijin Panas Bumi

Geothermal License Pemerintah/ Pemerintah Daerah/ Badan Usaha WILAYAH KERJA PANAS BUMI Eksplorasi Exploration Pemerintah/ Badan Usaha Government/ Business Entity Pasal 17 ayat (4)

GEOTHERMAL BUSINESS ACTIVITIES

AND PROCESS

(21)

RE Roadmap and Strategies 2015-2025

Energy type 2015 2016 2017 2018 2019 2020 2025 Oil 37% 35% 34% 32% 31% 29% 25% Gas 21% 21% 21% 21% 21% 21% 22% Coal 33% 33% 34% 35% 36% 36% 30% RE 10% 10% 11% 12% 13% 14% 23% TOTAL 100% 100% 100% 100% 100% 100% 100%

1. Good governance, clean and accountable; 2. Completing regulations;

3. Business licensed simplification; 4. Creating Incentives;

5. Preserving renewable energy subsidy; 6. Coordinating with ministries/regional

government and association; 7. Energy saving campaign;

8. Updating renewable energy data; 9. Enhancing the networking;

STRATEGY

+ 36,3 GW electricity from RE Within 10 years 3,6 GW per annum ± Rp. 1.600 trillion needed Power Plant 2015 2016 2017 2018 2019 2020 2025 Geothermal PP 1.439 1.654 2.004 2.344 2.979 3.804 7.239 Hydro/Mini /Micro PP 5.024 5.139 5.266 5.619 7.154 7.735 20.960 Bio PP 1.740 1.886 2.093 2.359 2.674 3.024 5.532 PV PP 79 229 429 679 979 1.379 6.379 Wind PP 7 57 107 207 307 507 1.807

(22)

Development Strategy

GOI is actively promote and set up the RE strategy

development. Some effort has been done such as:

 improving policy and regulation,  creating the market,

 subsidy,

feed in tariff,

incentives and facilities,

 funding and financial supports, and

 developing cooperation with other countries and international

institutions.

(23)

Direktorat Jenderal Energi Baru, Terbarukan dan Konservasi Energi Kementerian Energi dan Sumber Daya Mineral

1. Ammandment of the Geothermal Law No.27/2003 to Law No.21/2014; 2. Revise Goernment Regulation No. 59/2007 and GR No. 70/2010 on

Geothermal Business;

3. GR No. 79 Year 2014 on NEP;

4. President Regulation No. 4 / 2010 to Mandated Public Utilities - PT. PLN to Accelerate utilie RE;

5. Ministry of Energy Regulation

 No 11/2008 on Procedure of Geothermal Working Area;

 No 02/2009 on the Procedure of Preliminary Survey by Private Company;

 No 11/2009 on Geothermal Business Process and Bidding;  No 17/2014 on Geothermal Pricing;

REGULATION TO SUPPORT

GEOTHERMAL DEVELOPMENT

(24)

Referensi

Dokumen terkait

Dari hasil kuesioner yang terdiri dari 17 atribut ,didapatkan ada enam atribut yang menunjukan ketidak puasan pelanggan pelanggan terhadap koperasi XX yaitu atribut

Hasil menunjukkan, dari total perolehan persepsi responden dengan metode Weighted Servqual sebesar 1.90, Pelayanan Perpustakaan Fakultas Ekonomi Universitas Pakuan

Pada metode inokulasi injeksi, patogen secara langsung diinjeksikan ke dalam jaringan bonggol tanaman pisang sehingga tidak melalui tahapan proses infeksi alami, sedangkan

Dengan demikian, hasil penelitian ini juga dapat dijadikan sebagai salah satu acuan untuk mengembangkan model pembelajaran probing-prompting dan melakukan

Dari gambar di atas dapat dilihat bahwa titik-titik yang acak pada gambar tersebut tidak menunjukan pola apapun sehingga dapat disimpulkan tidak

Keberhasilan yang telah dicapai dalam pelaksanaan kegiatan pada Bidang Komunikasi dan Informatika pada Tahun 2016 ditentukan dari hasil pelaksanaan program dan

Serangkaian percobaan gravity current di laboratorium telah dilakukan untuk menguji peran perbedaan kerapatan sebagai gaya penggerak internal sistem dua fluida

Persebaran kasus leptospirosis di Kabupaten Gresik tahun 2009 sampai dengan 2012 cenderung merata di setiap kecamatan, namun demikian Kecamatan Duduk Sampeyan, Kecamatan Gresik